Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Signature
8:00am Opening
-
Receive handover from security
-
Setup speaker and music
-
Login to all computers
-
Check duty phone
-
Set up printer
-
Test first card (to warm printer)
-
Opening the concierge booking spread sheet
-
Check the security email inbox
-
Check and confirm visitor and contractor pass's for the day
-
Check previous business days follow up log
-
Put out CSC customer entry floor matts (on rainy days)
-
Check for loading dock bookings
9:00am Ongoing
-
Startrack delivery's for Vic Roads (action if required)
-
Check the lobby for cleanliness
-
CSC floor check
-
DDA toilet check
10:00am Ongoing
-
Daily Briefing: 1 conci team member to attend
-
Fleet vehicles dropped off
-
End of trip check
-
Richard Beswick will be onsite every Wednesday at 11am
Afternoon checklist continued
-
Mail run 12:00
-
8:00 shifts break
-
9:00 Shifts break
-
Check Security inbox
-
Update conci booking spread sheet
-
Update hand over log
-
Tidy mail room
-
Ensure all passes are locked away
-
Prepare handover for security
-
Follow up log to be detailed with all the important daily information