Title Page
-
Description of Activity
-
Location of Activity
-
Date
-
Authority to Access Number
-
Work Party Lead
-
Supervisor
Task Readiness Verifications
-
This section to be completed by the Work Party Lead
-
All members of the work party are competent to perform their nominated roles
-
The site / confined space conditions are compatible with the conditions noted on the Authority to Acess
-
STOP. Check with MW Operations - conditions must be compatible with Authority to Access conditions
-
The risk assessment is still appropriate for this work
-
STOP. Review the risk assessment and add additional identified hazards and risk controls as required.
-
Consideration has been given to the following:
-
Weather Conditions?
-
Traffic conditions?
-
Water flow?
-
Noise?
-
Barricades?
-
Signage?
-
Site security?
-
Communications?
-
Ventilation?
-
Hazards outside the confined space are being appropriately controlled (eg. Public)
-
STOP. Control the external hazards before proceeding.
-
Correct signage and barricades are in place
-
Other control checks have been completed (eg. working at heights, hot work, excavations etc)
-
Continuous communication can be achieved for this entry (visual / verbal)
-
STOP. Ensure appropriate communications have been established and are implemented and functional before proceeding.
-
The relevant MW system operator has been notified of the current intention to enter
Controls Page
- Controls Before Entry
-
List the controls you are going to implement before entry (eg: purging, ventilation etc. Consider all hazards and issues)
-
Control
Controls During Entry
-
List the controls you are going to implement while the work is being done (eg: continuous mechanical ventilation, RPE etc)
-
Control
Equipment Page
- Equipment Being Taken Into the Space
-
Equipment
Equipment Exclusions
-
Exclusion
Emergency Preparedness
-
To be completed by Work Party Lead
-
The rescue plan has been rehearsed (desktop, physical, videoed) and is appropriate for this entry
-
STOP. You cannot enter this space until an appropriate rescue plan has been developed by the team, rehearsed and found to be functional.
Calibration and Bump Testing
-
Detector Calibration
-
Date Tested:
-
Expiry Date:
-
Serial Number
-
Bump Test Conducted
-
Date Bump Test Done:
Atmospheric Test Readings
-
Enter peak readings prior to entry and when alarm sounds
Atmospheric Readings
-
Name
-
Time
-
LEL (%) (Safe level <5)
-
Oxygen (%) (safe level 19.5 to 23.5)
-
H2S (ppm) (Safe level < 10 ppm)
-
CO (ppm) (Safe level < 30 ppm)
-
VOC (ppm) (Safe level < 10 ppm)
-
NH3 (ppm) (Safe level < 25 ppm)
-
Observer Initials
Entry Team
- Entry Team
-
Name
-
Role
-
Observer
Entry and Exit Record
- Entry and Exit Record (Observer Completes)
-
Name
-
Time In
-
Time Out
-
Observer Initials