1.0 - Previous inspection
-
1.1 - Has the last inspection been reviewed?
-
1.2 - Are there no outstanding actions?
General Safety & Work Activity
-
Is all relevant information on site (SWMS, Start Cards, SDS,permits)
-
All workers on the job signed on start cards and SWMS
-
Do you consider that the SWMS adequately covers relevant safety and environmental issues
-
Safety documentation reviewed by safety advisor
-
Is the SWMS followed on site and PPE worn
-
Is the general level of housekeeping safe and adequate (hand tools put away when not in use, no litter, safe access around the site without trip/slip hazards,chemicals stored safely)
-
Is the speed limit adhered to by all traffic on site? Are seat belts and PPE worn?
-
Are spotters used where necessary (i.e where the operator cannot see what he's doing) and is this working effectively
-
Are people standing at a safe distance from machinery, moving parts etc
-
Any unauthorised people on site
-
Manual handling techniques appropriate? (heavy or awkward items lifted properly, correct tools used, work in awkward positions, any improvements needed eg using IT, job rotation etc)
-
No hand held friction cutting devices with blades 9" or greater on site
-
No open and / or fixed blade knives on site
-
No hardened sledge hammers and gympie's for GET or any hardened steel works being used
-
Fitness for work/heat stress controls appropriate? (Any signs of fatigue,alcohol/drugs,extreme weather conditions as lightening, rain, hot, anyone working alone in a dangerous location i.e excavations)
-
Sufficient water available
Macmahon Business System: Procedure and Policies
-
Safety and health policies displayed on notice boards
-
Latest safety committee meeting minutes displayed on notice boards
-
Latest toolbox meeting minutes displayed on notice boards
-
Incident register up to date and issues investigated
-
CA register up-to-date and items actioned
-
Any recent complaints from the community
-
Complaints register up-to-date,issues investigated
Confined Spaces
-
All personnel trained and competent in confined space entry
-
Confined space permit in place and managed in accordance with provisions contained within
-
Confined space permit approved
-
Standby person in place
-
Emergency rescue plan in place and evidence that it has been rehearsed
Electrical Safety
-
Are generators and all portable power tools and equipment supplied at 240V, protected by RCD's
-
'Stick' welders (MMAW) fitted with VRDs
-
Is quarterly electrical testing and tagging carried out of all electrical equipment used at the site
-
Portable lights and extension leads in good condition and tagged
-
Are electrical hand tools in good condition and tagged
Emergency Prepardness
-
Emergency procedures available to all workers
-
List of current emergency contact phone numbers or similar displayed or easily available to all workers
-
Are employees trained in fire fighting and any other relevant emergency response functions (12monthly)
-
Appropriate fire extinguishers present, tagged and within test date (every 6 months)
-
All fire fighting equipment and spill kits unobstructed
-
Fire extinguishers on mobile equipment and Macmahon vehicles
-
Spill response equipment readily accessible on site
-
Emergency response charts / posters available in prominent locations
-
Site plans with emergency response and fire fighting equipment available in prominent locations
Evacuations
-
Excavation permit in place and all relevant personnel signed on
-
Have all underground services been located and marked
-
If an excavation is >1.5m are the wall benched,battered or shored
-
Is there safe access and egress i.e by ladder of suitable length
-
Barriers and signage in place to stop people falling in the excavation
-
Machines and heavy equipment at a safe distance to the excavation to prevent the walls caving in
-
Any signs of cracking,soils falling in etc
-
If an excavation or confined spaces permit is needed, is it on site with the job
First Aid
-
Adequate first aid boxes on site and stocked and accessible to all personnel
-
Are first aid kits checked 6 monthly
-
Do all eye wash stations operate correctly
-
Eye wash stations and first aid boxes unobstructed
-
Are first aiders present on site
-
Current first aider posters in place at crib areas and office
Falsework / Formwork / Scaffold
-
SWMS in place and does it cover prevention of falls
-
Formwork erected safely from steps or proper platforms
-
Bases and ground conditions adequate for the loads
-
All reinforcing bars and star pickets fitted with caps
-
Timbers and shutters in good condition
-
Scaftags in place and in date (30 days)
-
No penetrations allowing a fall from heights
-
Scaffolders to hold correct COC for type of scaffold
-
Scaffold / Falsework / Formwork built in accordance with design drawings
Guarding for Machinery
-
Are all moving parts on machinery that could cause a risk of injury to persons, screened or guarded to prevent contact
-
Are all guards secure and in good repair
Falls incl work at heights/falling objects
-
All working at heights above 2mts with fall prevention in place
-
Workers trained and competent in working at heights
-
Working at heights permit in place and signed by relevant personnel
-
Emergency response plan in place for activity
-
Potential for free fall mitigated
-
Workers protected from falling objects
Hydrocarbon Management & Service Truck
-
Drums >60L not stacked more than 2 high
-
Only 1 drum >60L stored in decanting position
-
All containers have lids fastened
-
All chemicals / oils in trays or on tray pallets
-
Is chemical storage adequately ventilated
-
Safety data sheets available for material used in SDS folder and also on the job site when using chemicals
-
Ask staff that are using chemicals if they know where the SDS is and what to do in emergency situation
-
Hazardous chemicals / SDS register up to date
-
All hydrocarbons / chemicals being handled outside designated areas
-
Are hydrocarbons / chemicals being handled , stored in drip trays
-
Are chemical containers clearly labeled, in appropriate types and disposed of properly after use
-
Any evidence of oil or chemical spills at the site
-
All bundling and floors of storage areas intact
-
Any visible soil or water contamination evident
-
Is any maintenance conducted safely as per the SWMS
-
Are drip trays used when servicing vehicles / machinery
-
Hoses in good condition (note fractures, breaks, worn areas)
-
Do dispensing points on service truck have appropriate means of containing leaks/spills
-
Isolation valves installed, operational and in good condition
-
Emergency shut-off switches accessible and easily identifiable
Ladders
-
Ladders in good condition,properly placed for access & egress
-
Are all ladders on firm ,level ground
-
Ladders secured at the top or if not possible at the bottom weighted or footed to prevent slipping
-
Do ladders rise at least 1m above their landing place or highest rungs used, if not is there adequate hand tools
-
Are approved non-conductive ladders used when carrying out work on live electrical equipment
Laydown Area
-
Is the level of housekeeping acceptable ( litter, separation of materials and waste materials)
-
Any hazardous chemicals not stored correctly
Temporary Structures / Shelters
-
Are the structures / shelters appropriate for the task
-
Are the structures /shelters secured from uplift where determined risk of lift is identified
Lifting Gear / Crane
-
Lifting chains, rings, hooks & tags in good condition
-
All chain slings tagged and within date (12months)
-
Do all lifting chain hooks have safety catches
-
All lifting gear with current quarterly RGBY inspection tag
-
Crane has all required certificates, registration, inspection and logbooks
-
Copy of the crane operator VOC
-
Copy of the dogman/rigger VOC on-site
Vehicle / Plant Maintenance
-
Are pre-starts being completed
-
All operators with current VOC
-
Are oil leaks, engine exhaust smoke and excessive noise emissions addressed in pre-start checks
Plant
-
Is plant being driven safely and within speed limits? Are seat belts worn
-
Are vehicles securely and safely loaded
-
Reverse beeper working
-
Has mobile plant been fitted with roll-over protection or fall - on protective structures
-
Flashing light operating on all plant & vehicles
-
Are safety pins fitted and engaged correctly to all excavator quick hitch attachments or other GETs
Plant Inspection Service/Plant Check
-
Pick 3 items of plant enter plant number and owner
-
Plant 1
-
Plant Pre Start Checks are up to date
-
Last Service Hours
-
Next Service Due
-
Current hours
-
Is this plant within service schedule
-
Plant 2
-
Plant Pre Start Checks are up to date
-
Last Service Hours
-
Next Service Due
-
Current hours
-
Is this plant within service schedule
-
Plant 3
-
Plant Pre Start Checks are up to date
-
Last Service Hours
-
Next Service Due
-
Current hours
-
Is this plant within service schedule
Pressure Equipment / Welding
-
'Stick' welders (MMAW) fitted with VRD's
-
Hoses and hose connections in good condition
-
Are safety clips used on coupling
-
Are oxy/acetylene cylinders in use properly secured ? Cylinders stored separate,secured upright 3m apart?
-
Are cylinders tagged and within date of inspection
-
Are hazchem signs in place ( "acetylene" ,"flammable gas","oxygen","oxidizing gas")
-
Fire extinguishers in place where there is a fire risk
-
Are flashback arresters fitted at both cylinder and torch ends of hoses
-
Is a welding screen in place where necessary
Safe Access / Signs
-
Visitors / new workers process in place
-
Can everyone reach their place of work safely i.e. are there safe roads, passageways, ladders etc
-
Are all walkways level and free from obstructions
-
Men working above signage in place
-
Is the work site tidy and are materials stored safely
-
Are project signs clearly posted at entry and exit points (i.e "macmahon construction site" , "no entry")
-
Assembly/muster area clearly identified
Sub-contractor Involvement
-
For one of the subcontractor activities , complete a stop restart card. Review the SWMS together and ask the sub contractor to identify any hazards in the work area.
-
Sub-contractor company
-
Name of sub-contractor
-
Add signature
-
Select date
-
Activity / SWMS reviewed
-
Any hazards identified
Traffic Control
-
Pavement width adequate for traffic volumes & types
-
Safe access & egress of construction traffic on to public road
-
Is work site adequately barricaded /fenced off from the public
-
Walkways free of loose materials and other hazards
-
Are traffic signs clearly indicating the traffic flow, both pedestrian and vehicles? This includes detours
-
Are public vehicles stopped for an excessive time
Rail
-
Safe working provisions in place and correct as per the daily safe work briefing
-
Safe working personnel with correct competencies
-
Danger to zone is managed and provides adequate protection and is maintained
-
All workers in possession of required competencies e.g RISI, Pegasus, VOC's etc
-
Access to the rail corridor is closed and/or manned
General Comments/Observation: