Transmission Services Gas
UK MDG Transmission Services Gas
Project Health and Safety Inspection Checklist -
To be completed by Project Supervisor or Nominated person weekly from the start of construction work on site. Completed forms are to be kept readily available (preferably on site) for the duration of construction works, after which time shall form part of the CDM Health & Safety file.
-
Contract No:
-
Project Title:
-
Week No.
-
Date
Noise
-
Any H&S actions identified shall be entered onto Audit/Inspection Action Log and brought to the urgent attention of the appropriate personnel as soon as possible. Contractor/Project Manager to be notified of actions required/taken.
-
S = Satisfactory, U = Unsatisfactory, O = Observation, NA = Not Applicable
-
Have all activities/ plant which may affect hearing been identified?
-
Have noise assessments for these activities been carried out by a competent person using calibrated equipment and records maintained?
-
Has the information relating to these and the hazard of noise been communicated to the workforce and local residents who may be affected?
-
Could any of the sources of noise be eliminated or reduced?
-
Has suitable hearing protection been provided, is it worn and is it compatible with other items of PPE?
-
Are signs posted in a prominent place to warn of the danger of high noise areas?
-
Are breakers and other plant or machinery fitted with silencers / mufflers?
-
Are barriers erected to reduce the spread of noise?
-
Is work sequenced to minimise the number of people exposed to noise?
-
Are others not involved with the work kept away from noisy areas?
-
Have alternative less noisy activities / plant been considered?
Signature
-
Auditor's Signature
-
Project Manager's Signature
-
Date