Information
-
Report Reference Number:
-
Site Inspected:
-
Client
-
Conducted on
-
Advisor:
-
Personnel
-
Scoring.
N/A = This item was not applicable at the time of the inspection, or it was not one of the items inspected.
S = Satisfactory. This category was being managed / controlled in accordance with minimum requirements or better.
A = Advisory. Recommended measures necessary to achieve industry best practice.
IAR = Immediate action required to reduce the risk of harm and/or enforcement action.
Accidents, Dangerous Occurrences or Near Misses since last visit.
-
Provide details.
0 Previous Inspections.
-
Have matters identified during previous inspection been satisfactorily addressed.
-
Recommended Actions.
1 Scaffolds and Mobile Towers
-
Designed - handed over - erected in accordance with recognised standards - statutory inspections carried out etc.
-
Recommended Action.
2 Ladders, Stepladders, Podiums etc.
-
Fit for purpose - in good order - secured - inspected etc.
-
Recommended Actions.
3 Demolition.
-
Demolition plan in place - work carried out in accordance with plan etc.
-
Recommended Action.
4 Excavations & Groundworks.
-
Safe digging - supported/battered - statutory inspections - access/egress etc.
-
Recommended Action.
5 Lifting Operations.
-
Lifting plan - testing/certification - ground conditions - SWL etc.
-
Recommended Action.
6 Mobile Plant & MEWPs.
-
Fit for purpose - tested/inspected etc.
-
Recommended Action.
7 Portable Tools.
-
PAT - fit for purpose etc.
-
Recommended Action.
8 Access/egress.
-
Adequate - maintained in good order etc.
-
Recommended Action.
9 Electricity
-
Inspection/test - isolation/lock off etc.
-
Recommended Action.
10 Environmental.
-
Waste management - spill kit - noise - dust - mud etc.
-
Recommended Action.
11 Fencing/security.
-
Adequate - maintained etc.
-
Recommended Action.
12 Contractor Management.
-
Co ordinated - supervised etc.
-
Recommended Action.
13 Personal Protective Equipment.
-
Fit for purpose - face fit tested etc.
-
Recommended Action.
14 Edges/openings/stairways.
-
Adequately guarded - handrails on stairs - stairs unobstructed etc.
-
Recommended Action.
15 Site Good Order
-
Housekeeping - slips/trips/falls - lighting etc.
-
Recommended Action.
16 Fire Precautions.
-
Fire plan - alarms - signage - extinguishers - exit routes - muster point - flammables etc.
-
Recommended Action.
17 Occupational Health
-
Noise - HAVS - MSDs - Dermatitis etc
-
Recommended Action.
18 Welfare
-
Sufficient facilities - adequately equipped - suitably maintained.
-
Recommended Action.
19 First Aid
-
A&E location - first aiders - equipment.
-
Recommended Action.
20 Competency
-
Site inductions - tool box talks - training etc.
-
Recommended Action.
21 Documentation
-
Construction Phase Plan - Pre Construction information - statutory notices
-
Recommended Action.
22 Asbestos.
-
Survey report - management plan - re occupation certificate - licensed work - Asbestos Awareness etc
-
Recommended Action.
23 Safe Systems of Work
-
Method Statements - COSHH - Risk Assessments - Permits etc.
-
Recommended Action.
24 Traffic Management
-
Traffic plan - segregated routes - routes maintained - signage etc.
-
Recommended Action.
25 Temporary Works
-
Designed - co ordinated etc.
-
Recommended Action.
26 Worker Engagement & Consultation
-
Arrangements, evidence.
-
Recommended Action.
-
Overall Comments:
-
Site Manager Action / Comments:
-
Advisor
-
Company Representative
-
Actions taken to address shortfalls.
-
Closed Out by and date