Title Page
-
Contract Title and #
- Augmentation of Pressure Mains LG314/690/15/023
- Pimpama to Coombabah STP Recycled Water Main Augmentation LG314/1211/18/071
- Sewer Relining LG/314/1211/18/100
- DWFS LG314/621/18/023
- DMA LG/314/1211/17/015
- Other
- CO13 Sewer Vacuum pump station upgrade LG314/1211/20/005
- Merrimac/ Elanora STP process tank refurbishment LG314/1211/19/101
-
Contractor
- NTS
- DIONA
- CC
- TSA
- DEMACS
- Pipelining
- other
- Liquitek
-
Location
-
Date & Time of Visit
Overview
Visible Workers on Site
-
Foreman
-
Construction Workers
-
Concreters
-
Plant Operators
-
Surveyors
-
Traffic Controllers
-
Vac truck operators
-
Other
-
Describe other
-
Describe other
-
Describe other
-
Describe other
-
Describe other
Visible Plant on Site
-
Bobcats
-
Concrete Trucks
-
Excavator(s)
-
Excavator(s)Tonnage
- 2
- 3
- 4
- 5
- 8
- 12
- 14
- 20
- >20
- Other
-
Line Markers
-
Tip-Trucks
-
Tool-Trucks
-
Traffic Control vehicles
-
Utes
-
Vac Trucks
-
Other
-
Other Plant Description
-
Other Plant Description
-
Other Plant Description
-
Other Plant Description
-
Other Plant Description
Weather Conditions
-
Temperature
- Very hot
- Hot
- Mild
- Cold
-
Fine, Rain or Light Showers
- Fine
- Rain
- Light Showers
- Windy
-
Overcast
-
Work Stopped Due to Weather
-
Describe Conditions
Activity
-
Concreting
-
Earthworks
-
Electrical
-
Excavation
-
Formwork
-
Manhole works
-
Pipelining
-
Pipework
-
Pot-Holing
-
Restoration Works
-
Road Works
-
Signs, Lines, etc.
-
Site Works
-
Steel fixing
-
Storm Water Works
-
Testing
-
Other
-
Describe Activity
Process
Process
-
Has the Contractor performed and documented a pre start
-
Why not?
-
Visual check of licences and induction
-
Why not?
-
Check that the Safe work method statement (SWMS)/work method statement (WMS) are on site, relate to the work and have been implemented
-
Why not?
-
Safe Work Australia
-
https://www.safeworkaustralia.gov.au/
-
Check Environmental Management Plan (e.g. dewatering acid sulphate soil)
-
Why not?
-
Have underground services been identified (e.g. Dial before you dig &/or potholing)
-
Why not?
-
Have all energy sources been isolated (LOTO)
-
Why not?
-
Are relevant spotters on-site
-
Why not?
-
Have the required Traffic Management Plans (TMP’s) been approved by the relevant authority (Council, DTMR etc.)
-
Why not?
-
MUTCD QLD Part 3: Works on Roads November 2018
-
https://www.tmr.qld.gov.au/-/media/busind/techstdpubs/Traffic-management/Manual-of-Uniform-Traffic-Control-Devices/MUTCD-Pt-3-Works-on-Roads.pdf?la=en
-
Supplement - MUTCD QLD Part 3: Works on Roads November 2018 (Example diagrams)
-
https://www.tmr.qld.gov.au/-/media/busind/techstdpubs/Traffic-management/Manual-of-Uniform-Traffic-Control-Devices/MUTCD-Pt-3-Supplement.pdf?la=en
-
Are control measures in place (barricading signs,) for both vehicle traffic & pedestrians, & in accordance with the approved TMP
-
Why not?
-
Fire ant soil management in place (where relevant)
-
Why not?
-
Check that all permits and risk assessments have been filled out and implemented
-
Why not?
-
PPE in good condition and being worn
-
Why not?
-
Housekeeping adequate (including rubbish), all personnel must be mindful when working in public areas as you are representing GCWW.
-
Why not?
-
Any safety or environmental concerns
-
Describe concerns
-
Notes
Sign off
-
Verified by