01 General Responsibilities

1.1 Site Access

  • 1.1.1 Is a safe area allocated for parking available on site?

  • 1.1.1.1 Is it adequate sized for the size of the site?

  • 1.1.1.2 Is the surface suitable?

  • 1.1.1.3 Does it provided safe access?

  • 1.1.1.1 Is it adequate sized for the size of the site?

  • 1.1.1.2 Is the surface suitable?

  • 1.1.1.3 Does it provided safe access?

  • 1.1.2 Is the site protected all round, by fencing or hoarding?

  • 1.1.2.1 Is the fencing/hoarding suitable and free from damage?

  • 1.1.2.2 Does the fencing prevent unauthorized access to all areas of the site?

  • 1.1.2.3 Does the fencing protect all items of equipment and materials from theft or external damage?

  • 1.1.2.4 When was the hoarding/fencing last checked for structural strength?

  • Notify site team that hoarding posts should be inspected every 6 months or after severe weather for signs of rotting or play at the base, movement on any of the cross rails or loosening of the panels.

  • 1.1.2.1 Is the fencing/hoarding suitable and free from damage?

  • 1.1.2.2 Does the fencing prevent unauthorized access to all areas of the site?

  • 1.1.2.3 Does the fencing protect all items of equipment and materials from theft or external damage?

  • 1.1.2.4 When was the hoarding/fencing last checked for structural strength?

  • Notify site team that hoarding posts should be inspected every 6 months or after severe weather for signs of rotting or play at the base, movement on any of the cross rails or loosening of the panels.

  • 1.1.3 Are there 600 x 900 mm mandatory PPE signs displayed at all site entrances?

  • 1.1.4 Are "Danger Construction Site, Keep Out" signs displayed around the perimeter at a max distance of 17.5m or 5 herras fence panels.

  • 1.1.5 Are there separate site entrances for vehicles and pedestrians?

  • 1.1.6 Is the site entrance area clear from obstructions and generally tidy?

  • 1.1.7 Is the site office signposted or clearly accessible from the entrance?

  • 1.1.8 Are there segregated pedestrian and vehicle routes around the site office and welfare areas?

  • 1.1.8.1 Are the routes protected by suitable barriers?

  • 1.1.8.2 Are the crossing points marked with goal posts or crossing gates?

  • 1.1.8.3 Are the routes clear from obstructions or hazards?

  • 1.1.8.4 Are the routes across firm ground, without mud or puddles?

  • 1.1.8.5 Have vehicles been prevented from entering the pedestrian routes?

  • 1.1.8.6 Are plant, stores and materials kept clear from pedestrian routes?

1.2 Site Office and Welfare Units

  • 1.2.1 How are welfare facilities being provided?

  • 1.2.2 Is the CDM board displayed?

  • 1.2.2.1 Is the HSWA poster displayed and up to date?

  • 1.2.2.2 Are up to date insurance certificates displayed?

  • 1.2.2.3 Has F10 notification been submitted and is it displayed?

  • 1.2.2.4 Is the emergency contact list displayed and up to date?

  • 1.2.2.5 Are the first aid details up to date and displayed?

  • 1.2.2.6 Is the site layout plan up to date and displayed in the site office and welfare areas?

  • 1.2.2.6.1 Are the site fire points displayed on the plan and upto date?

  • 1.2.2.6.2 Is the emergency muster point displayed on the plan and upto date?

  • 1.2.2.6.3 Are key site areas marked on the plan and upto date?

  • 1.2.3 Is the site register completed and being maintained?

  • 1.2.4 Are the welfare facilities adequate size for the number of personnel on site?

  • 1.2.5 Is there a drying room available or a changing area?

  • 1.2.6 Are the kitchen facilities clean and tidy?

  • 1.2.7 Are all the appliances such as kettle, fridge, microwave etc in good working order?

  • 1.2.8 Are there sufficient tables and chairs in the welfare facilities or outside?

1.3. Documents and Records

  • 1.3.1 Is the Construction Phase Plan available and reviewed monthly?

  • 1.3.2 Are induction briefs being conducted and recorded?

  • 1.3.2.1 Are competencies being checked and recorded with induction records?

  • 1.3.3 Are Contractors and Generic PC RAMS available?

  • 1.3.3.1 Are they upto date?

  • 1.3.3.2 Have they been signed by all operatives?

  • 1.3.3.3 Do they cover the scope of the works being undertaken at this site?

  • 1.3.4 Are Permits to Work being recorded on site?

  • 1.3.4.1 Are any PTW's currently open?

  • QHSE to inspect work being undertaken as part of the PTW.

  • 1.3.4.2 Are live permits clearly displayed in the site office?

  • 1.3.4.3 Have expired permits been closed correctly?

  • 1.3.4.4 Were all areas requiring a PTW covered by the correct paperwork during the inspection?

  • 1.3.5 Is weekly contract monitoring being completed?

  • 1.3.6 Are forklift inspection being undertaken daily and recorded in the site folders?

  • 1.3.7 Are toolbox talks being undertaken and recorded?

  • 1.3.8 Are COVID 19 procedures being followed on site?

1.4. Site Housekeeping

  • 1.4.1 Is there safe access and egress to the site from the site office and welfare areas?

  • 1.4.2 Are the pedestrian and vehicle routes clearly marked and easy to follow?

  • 1.4.3 Are materials being stored on pallets?

  • 1.4.3.1 Are pallets intact and free from damage?

  • Inform site team that broken pallets are not to be lifted or moved. The materials should be used up in position or transferred onto another pallet before lifting or craning.

  • 1.4.3.2 Are broken pallets being removed from site and disposed of correctly?

  • 1.4.4 Are materials being stored in bulk/dumpy bags?

  • 1.4.4.1 Are bulk bags/dumpy bags intact with no splits or tears?

  • 1.4.4.2 Do the lifting points on bulk bags/dumpy bags appear intact and free from damage?

  • 1.4.4.3 Are damaged bags being disposed of correctly?

  • 1.4.5 Are sheet materials stored flat on the ground on bearers or secured against falling over?

  • 1.4.6 Are windows, doors or glazing stored on suitable frames or secured from falling over?

  • 1.4.7 Are weather sensitive materials protected from the elements?

  • 1.4.8 Are all items and equipment stored safely?

  • 1.4.9 Are wrapping materials, packing, banding being removed to prevent trip hazards?

02 Accident & Incident Reporting

  • 2.1 Have any accidents or incidents which have occurred on site since the last safety inspection been reported to the QHSE and Procurement?

  • 2.1.1 Has a site investigation been completed?

  • 2.1.2 Is a GDPR redacted version of the report available in site folder 5.11?

  • 2.1.3 Have any actions raised in the investigation been completed?

  • 2.2 Is the site manager aware of the RIDDOR process and the types of incidents which require reporting to the HSE or where to get information on the RIDDOR process?

03 Health & Welfare

  • 3.2 Has the QHSE been notified of any reports of work related skin conditions, made since the last safety inspection?

  • 3.2.1 What skin conditions have been reported?

  • 3.2.3 Is the individual recieving any medical treatment

  • 3.2.3 Has this person received an individual risk assessment?

  • 3.2.4 Has this person been issued with any additional PPE?

  • 3.2.5 Has this individual been undertaking health surveillance?

  • 3.3 Has the QHSE been notified of any reports of blood borne diseases, made since the last safety inspection?

  • 3.3.1 What diseases have been reported?

  • 3.3.2 Are they related to a specific area or activity on site?

  • 3.3.3 Have relevant warning signs been displayed highlighting the hazard in the area?

  • 3.3.4 Has the hazard been included in the site induction briefs?

  • 3.4 Has the QHSE been notified of any concerns over the mental health or mental wellbeing of any individuals on site, made since the last safety inspection?

  • 3.4.1 Is a mental health first aider available should the individual request some additional support?

  • 3.4.2 Is the Site Manager aware of how to sign post an individual to relevant support organizations?

  • 3.5 Has the QHSE been notified of any reports of individuals on site being suspected or confirmed as under the influence of drugs or alcohol, made since the last safety inspection?

  • 3.5.1 Has the incident been reported to the Regional Director or Contract or Commercial Manager?

  • 3.5.2 Was it an isolated incident?

04 First Aid & Emergency Procedures

  • 4.1 Is a first aid kit present?

  • 4.1.1 Does the kit contain Plasters, Dressings, Bandages, Scissors, Disposable Gloves, a Face Shield, Cleansing Wipes, Adhesive Tape, Foil Blankets and Eyewash Pods?

  • 4.1.2 Are all items in date?

  • 4.1.3 Have all consumable medications been removed?

  • 4.2 Has a full fire risk assessment been carried out by the SM & QHSE?

  • 4.3 Has a fire management plan been created?

  • 4.3.1 Is it being checked and reviewed by the site team?

  • 4.3.2 Are weekly checks being undertaken and recorded?

  • 4.4 Are emergency actions included in the induction brief and displayed in key areas?

05 Personal Protective Equipment

  • 5.1 Are all personnel wearing hard hats, boots and hi-viz?

  • 5.2 Is eye protection being worn?

  • 5.3 Is hearing protection being worn?

  • 5.4 Is RPE being worn?

  • 5.5 Are harnesses being worn?

  • 5.6 Are gloves being worn?

06 Asbestos

  • 6.1 Are known asbestos containing materials being managed correctly on site?

  • 6.1.1 Has an asbestos survey been carried out?

  • 6.1.2 Are the results included in an asbestos management plan?

  • 6.1.3 Have all employees who could reasonably be exposed to ACM's, read and signed the asbestos management plan and register?

  • 6.1.4 Are there copies of the correct waste transfer notes for any asbestos which has been removed from site?

  • 6.1.1 Has an asbestos survey been carried out?

  • 6.1.2 Are the results included in an asbestos management plan?

  • 6.1.3 Have all employees who could reasonably be exposed to ACM's, read and signed the asbestos management plan and register?

  • 6.1.4 Are there copies of the correct waste transfer notes for any asbestos which has been removed from site?

  • 6.2 Are suspected asbestos containing materials being managed correctly on site?

  • 6.2.1 Are the areas outside of any works included in the program outlined in the construction phase plan?

  • 6.2.1.1 Is there a plan in place to have a full R&D survey done before commencing work in these areas?

  • 6.2.1 Are the areas outside of any works included in the program outlined in the construction phase plan?

  • 6.2.1.1 Is there a plan in place to have a full R&D survey done before commencing work in these areas?

07 Dust & Fumes

  • 7.1 Is dust extraction or suppression in place?

  • 7.1.1 Is the correct system in use?

  • 7.1.2 Is it being operated correctly?

  • 7.1.3 Are the procedures effective in reducing dust?

  • 7.2 Is gas/fume detection in place and operating correctly?

  • 7.2.1 Is the detection equipment being manned by a competent person who can trigger an evacuation/rescue?

  • 7.2.2 Have ventilation/fume extraction systems been put in place?

  • 7.2.3 Are the correct types of RPE in use?

  • 7.3 Is internal dust being suppressed or removed so that it does not become a hazard to operatives and site personnel?

  • 7.4 Is external dust being suppressed or removed so that it does not become a hazard to operatives and site personnel?

  • 7.5 Is external dust being suppressed or removed so that it does not become a nuisance to neighbours or the general public?

08 Noise & Vibration

  • 8.1 Are noisy plant or processes being managed correctly?

  • 8.1.1 Are operatives using the correct PPE?

  • 8.1.2 Have noisy items of equipment been positioned away from work areas where possible?

  • 8.1.3 Have alternative options to reduce operatives' exposure to noise been considered by the site team?

  • 8.1.4 Has the impact of noise upon neighbours, clients or guests been considered by the site team?

  • 8.1.5 Have any noise control procedures been put in place by the site team?

  • 8.1.5.1 Are the procedures effective at reducing or controlling noise?

  • 8.1.5.2 Are the procedures being followed by operatives on site?

  • 8.2 Is HAVS monitoring being managed correctly on site?

  • 8.2.1 Has a HAVS risk assessment been carried out?

  • 8.2.2 Have control measures been put in place?

  • 8.2.3 Are the control measures effective at reducing the HAVS risk?

  • 8.2.1 Has a HAVS risk assessment been carried out?

  • 8.2.2 Have control measures been put in place?

  • 8.2.3 Are the control measures effective at reducing the HAVS risk?

09 Hazardous Substances

  • 9.1 Are hazardous substances being managed correctly on site?

  • 9.1.1 Are COSHH data sheets available for each item?

  • 9.1.2 Are the items stored in a suitable location iaw the COSHH data sheet?

  • 9.1.3 Have the items been risk assessed so that the lower risk items have been selected for use?

  • 9.1.4 Are operatives aware of the safety precautions and instructions for safe use?

  • 9.1.5 Are the materials being used correctly?

  • 9.1.6 Has the minimum quantity required been removed from storage?

10 Manual Handling

  • 10.1 Are the correct manual handling techniques, for items over 10kg being used on site?

  • 10.1.1 Have materials been positioned to reduce manual handling where necessary?

  • 10.1.2 Have alternative methods been considered which would remove the need for manual handling?

  • 10.1.3 Are manual handling routes free from obstructions and trip hazards?

11 Safety Signs

  • 11.1 Have additional mandatory signs been erected in the correct areas?

  • 11.2 Have additional prohibition signs been erected in the correct areas?

  • 11.3 Have additional hazard warning signs been erected in the correct areas?

  • 11.4 Have additional safe condition signs been erected in the correct areas?

  • 11.5 Does the site team have access to a selection of common warning or safety signs used on site?

12 Fire Prevention & Control

  • 12.1 Are there sufficient fire points around site?

  • 12.1.1 Does each fire point have a fire stand or fire trolley?

  • 12.1.2 Does each fire point consist of 2 fire extinguishers?

  • 12.1.3 Does each fire point have a horn, bell or alarm call point?

  • 12.1.4 Does each fire point have a fire action notice?

  • 12.2 Does the site have suitable internal or external fire exit routes?

  • 12.2.1 Are the fire exit routes clearly marked and easy to follow?

  • 12.2.2 Are they free from obstructions?

  • 12.2.3 Are they protected by emergency lighting or glow in the dark signage?

  • 12.2.4 Do the fire escape routes pass by a bell, horn or alarm call point?

  • 12.3 Are flammable materials being placed in bins or skips for removal and disposal?

  • 12.4 Are bins being emptied regularly to prevent the build up of flammable materials?

  • 12.5 Are skips stored sufficiently far enough from the building/structures to reduce the risk of a fire?

13 Electrical Safety

  • 13.1 Are fixed electrical supplies correctly installed on site?

  • 13.1.1 Are 110v supplies correctly installed on site?

  • 13.1.2 Are 240v supplies only available in site offices and welfare cabins?

  • 13.1.3 Are 400v supplies correctly installed on site?

  • 13.1.3.3 Are the correct warning signs displayed for 400v systems?

  • 13.1.4 Are distribution boxes in good physical condition?

  • 13.1.5 Are the correct electrical hazard warning signs displayed on distribution boxes and key equipment?

  • 13.1.6 Are cable routes above head height in pedestrian areas?

  • 13.1.7 Are cable ramps and warning signs used on vehicle routes?

  • 13.1.8 Are cables in a good condition and free from damage?

  • 13.1.9 Are cables run without stretching, pulling tight or excessive bends/twists?

  • 13.1.10 Are cable routes clear of doors, windows or other cutting/chopping hazards?

  • 13.1.11 Is internal lighting provided on main access routes, corridors and thoroughfares?

  • 13.1.12 Is external lighting provided at pedestrian crossings, vehicle loading and unloading areas, around the welfare area, and illuminating other key hazards around site?

  • 13.1.13 Has external lighting been positioned in a way to prevent it becoming a nuisance to neighbours or the general public?

14 Work Equipment & Hand Held Tools

  • 14.1 Are power tools being used correctly on site?

  • 14.1.1 Are the correct tools being used for the task?

  • 14.1.2 Are tools in a good condition and free from damage?

  • 14.1.3 Is the correct RPE/PPE being worn for each tool?

  • 14.2 Are hand tools being used correctly on site?

  • 14.2.1 Are the correct tools being used for the task?

  • 14.2.2 Are tools in a good condition and free from damage?

  • 14.2.3 Is the correct RPE/PPE being worn for each tool?

15 Mobile Work Equipment

  • 15.1 Is mobile work equipment being used correctly on site?

  • 15.1.1 What types of mobile work equipment are in use on site?

  • 15.1.2 Is the equipment in a good condition with no visible faults?

  • 15.1.3 Is the equipment being operated in a safe manner iaw site rules?

  • 15.1.4 Are all operatives qualified to operate the equipment?

  • 15.1.5 Are operatives wearing the correct PPE, using seat belts, ROPS or FOPS as required?

  • 15.1.6 Is the correct equipment being used for the task?

  • 15.1.7 Are personnel clear of the operating areas of mobile equipment?

  • 15.1.8 Are parked items of mobile work equipment left in a safe location?

  • 15.1.1 What types of mobile work equipment are in use on site?

  • 15.1.2 Is the equipment in a good condition with no visible faults?

  • 15.1.3 Is the equipment being operated in a safe manner iaw site rules?

  • 15.1.4 Are all operatives qualified to operate the equipment?

  • 15.1.5 Are operatives wearing the correct PPE, using seat belts, ROPS or FOPS as required?

  • 15.1.6 Is the correct equipment being used for the task?

  • 15.1.7 Are personnel clear of the operating areas of mobile equipment?

  • 15.1.8 Are parked items of mobile work equipment left in a safe location?

16 Lifting Operations & Equipment

  • 16.1 Are lifting operations being conducted safely on site?

  • 16.1.1 Has a lift plan been completed and issued by the lift supervisor?

  • Stop craning activities immediately until a Lift Plan has been completed and briefed to all operatives.

  • 16.1.2 Have all operatives read and signed the lift plan?

  • Stop craning activities immediately until a Lift Plan has been completed and briefed to all operatives.

  • 16.1.3 Is the crane suitable for the type of lift?

  • Stop craning activities immediately while an assessment of the crane and lift plan is undertaken.

  • 16.1.4 Is the crane in date for inspection?

  • Stop craning activities immediately until the inspection date has been confirmed.

  • 16.1.5 Are the lifting slings, strops, chains or equipment in date for test?

  • Stop craning activities immediately until the lifting equipment has been tested and confirmed as safe to use?

  • 16.1.6 Are the ground conditions suitable for the type of crane and lift plan?

  • Stop craning activities immediately until the ground conditions have been assessed.

  • 16.1.7 Are the weather conditions suitable for the lift taking place?

  • Stop craning activities immediately until a full assessment of the weather has been made.

  • 16.1.1 Has a lift plan been completed and issued by the lift supervisor?

  • Stop craning activities immediately until a Lift Plan has been completed and briefed to all operatives.

  • 16.1.2 Have all operatives read and signed the lift plan?

  • Stop craning activities immediately until a Lift Plan has been completed and briefed to all operatives.

  • 16.1.3 Is the crane suitable for the type of lift?

  • Stop craning activities immediately while an assessment of the crane and lift plan is undertaken.

  • 16.1.4 Is the crane in date for inspection?

  • Stop craning activities immediately until the inspection date has been confirmed.

  • 16.1.5 Are the lifting slings, strops, chains or equipment in date for test?

  • Stop craning activities immediately until the lifting equipment has been tested and confirmed as safe to use?

  • 16.1.6 Are the ground conditions suitable for the type of crane and lift plan?

  • Stop craning activities immediately until the ground conditions have been assessed.

  • 16.1.7 Are the weather conditions suitable for the lift taking place?

  • Stop craning activities immediately until a full assessment of the weather has been made.

17 Working at Height

  • 17.1 Are ladders being used correctly site?

  • 17.1.1 Is the correct type of ladder in use?

  • 17.1.2 Is it on stable ground?

  • 17.1.3 Is it in good condition with no visible signs of damage?

  • 17.1.1 Is the correct type of ladder in use?

  • 17.1.2 Is it on stable ground?

  • 17.1.3 Is it in good condition with no visible signs of damage?

  • 17.2 Are scaffold towers being used correctly on site?

  • 17.2.1 Is the correct type of tower being used?

  • 17.2.2 Is the tower covered by a valid MAT permit?

  • 17.2.3 Is it on stable ground?

  • 17.2.4 Are the platform and handrails fitted at the correct height for the task?

  • 17.2.5 Is it being accessed correctly?

  • 17.2.1 Is the correct type of tower being used?

  • 17.2.2 Is the tower covered by a valid MAT permit?

  • 17.2.3 Is it on stable ground?

  • 17.2.4 Are the platform and handrails fitted at the correct height for the task?

  • 17.2.5 Is it being accessed correctly?

  • 17.3 Is scaffolding installed and being used safely on site?

  • 17.3.1 Is the correct type of scaffolding being used?

  • 17.3.2 Is it on stable ground?

  • 17.3.3 Is it in date for inspection?

  • 17.3.4 Is it being accessed correctly?

  • 17.3.5 Does it have the correct toe boards, brick guards or debris netting fitted?

  • 17.3.6 Are the top rails fitted 950+ mm above platform height and mid rails at intervals of 470 mm max?

  • 17.3.7 Are the scaffold boards fitted correctly and in good condition?

  • 17.3.8 Is the scaffolding secured to the building or braced sufficiently?

  • 17.3.9 Are rakers fitted as high as possible and tied into the lowest lift to prevent rotation?

  • 17.3.10 Are sole plates founded at an angle of resistance to the ground slope?

  • 17.3.11 Is the safe working load of loading bays displayed at ground level and on the swing gate?

  • 17.3.1 Is the correct type of scaffolding being used?

  • 17.3.2 Is it on stable ground?

  • 17.3.3 Is it in date for inspection?

  • 17.3.4 Is it being accessed correctly?

  • 17.3.5 Does it have the correct toe boards, brick guards or debris netting fitted?

  • 17.3.6 Are the top rails fitted 950+ mm above platform height and mid rails at intervals of 470 mm max?

  • 17.3.7 Are the scaffold boards fitted correctly and in good condition?

  • 17.3.8 Is the scaffolding secured to the building or braced sufficiently?

  • 17.3.9 Are rakers fitted as high as possible and tied into the lowest lift to prevent rotation?

  • 17.3.10 Are sole plates founded at an angle of resistance to the ground slope?

  • 17.3.11 Is the safe working load of loading bays displayed at ground level and on the swing gate?

  • 17.4 Are MEWPs being used correctly on site?

  • 17.4.1 Is the correct type of MEWP being used?

  • 17.4.2 Is it on stable ground?

  • 17.4.3 Is it in date for inspection?

  • 17.4.4 Is it being accessed correctly?

  • 17.4.5 Are harnesses being worn and secured correctly inside the basket (boom lifts only)?

  • 17.4.5.1 Are harnesses in date for inspection?

  • 17.4.5.2 Are harnesses secured correctly to an anchor point within the basket?

  • 17.4.1 Is the correct type of MEWP being used?

  • 17.4.2 Is it on stable ground?

  • 17.4.3 Is it in date for inspection?

  • 17.4.4 Is it being accessed correctly?

  • 17.4.5 Are harnesses being worn and secured correctly inside the basket (boom lifts only)?

  • 17.4.5.1 Are harnesses in date for inspection?

  • 17.4.5.2 Are harnesses secured correctly to an anchor point within the basket?

  • 17.5 Is fall arrest being used correctly on site?

  • 17.5.1 Is the correct type being used?

  • 17.5.2 Is it in date for inspection?

  • 17.5.3 Is a recovery plan in place to retrieve personnel from the fall arrest system?

  • 17.5.4 Are the site team aware of the key times for emergency treatment following a person being suspended in a harness?

  • 17.5.1 Is the correct type being used?

  • 17.5.2 Is it in date for inspection?

  • 17.5.3 Is a recovery plan in place to retrieve personnel from the fall arrest system?

  • 17.5.4 Are the site team aware of the key times for emergency treatment following a person being suspended in a harness?

  • 17.6 Is fall prevention installed correctly on site?

  • 17.6.1 Is fall prevention in place around stairwells and open landings?

  • 17.6.2 Is fall prevention in place around unsecured edges of all upper floors?

  • 17.6.3 Is fall prevention in place around all floor openings?

  • 17.6.4 Is fall prevention in place around all skylights or roof openings?

  • 17.6.5 Is fall prevention in place across all door and window openings?

  • 17.6.1 Is fall prevention in place around stairwells and open landings?

  • 17.6.2 Is fall prevention in place around unsecured edges of all upper floors?

  • 17.6.3 Is fall prevention in place around all floor openings?

  • 17.6.4 Is fall prevention in place around all skylights or roof openings?

  • 17.6.5 Is fall prevention in place across all door and window openings?

18 Excavations

  • 18.1 Are open excavations, trenches or pits present on site and being correctly managed?

  • 18.1.1 Is the work covered by a Permit to Excavate or included on the open excavations checklist?

  • Order all work to stop and operatives to exit the excavation until a PTW is open and pre work checks are complete.

  • 18.1.1.2 Does the supervisor have a copy of the PTW?

  • 18.1.1.3 Have all operatives read and signed the RAMS for the excavation works?

  • 18.1.2 Have edge protection barriers, fencing or blocks been put in place?

  • 18.1.3 Have vehicles and materials been prevented from encroaching on the excavation?

  • 18.1.4 Have appropriate methods been used to prevent collapse?

  • 18.1.5 is there a suitable method to access and egress the excavation?

  • 18.1.6 Do operatives know the signs of excavation collapse?

  • Common signs are parallel cracks adjacent to the trench, crumbling material, bulging sides, water springing up out of the ground, bending pipes or ducts.

  • 18.1.7 Have generators, plant and vehicles been kept away to prevent gasses building up in the excavation?

  • 18.7.8 Have measures been put in place to prevent liquids or materials from rushing into the excavation?

19 Underground & Overhead Services

  • 19.1 Are overhead services present on site or near the site boundaries being managed correctly?

  • 19.1.1 Are the services marked with warning signs, goal posts or hazard bunting?

  • 19.1.2 Are the service locations covered in the site induction brief?

  • 19.1.3 Are operators or banskmen aware of the location of over head services?

  • 19.1.4 Are stores and materials kept away from service locations to remove craning/lifting requirement near supplies?

  • 19.1.1 Are the services marked with warning signs, goal posts or hazard bunting?

  • 19.1.2 Are the service locations covered in the site induction brief?

  • 19.1.3 Are operators or banskmen aware of the location of over head services?

  • 19.1.4 Are stores and materials kept away from service locations to remove craning/lifting requirement near supplies?

  • 19.2 Are underground services present on site or near the site boundaries being managed correctly?

  • 19.2.1 Has a ground survey been completed or information requested from local utility companies to locate services?

  • 19.2.2 Has a site grid been compiled in the site office, showing the location of all known underground services?

  • 19.2.3 Have the locations of any known services been marked on the ground and identified to ground workers or persons operating heavy machinery on site?

  • 19.2.4 Have the locations of underground services been considered against craning activities, storage locations, excavations or other ground works?

  • 19.2.5 Are the site team aware of the immediate actions to take following a service strike?

  • 19.2.1 Has a ground survey been completed or information requested from local utility companies to locate services?

  • 19.2.2 Has a site grid been compiled in the site office, showing the location of all known underground services?

  • 19.2.3 Have the locations of any known services been marked on the ground and identified to ground workers or persons operating heavy machinery on site?

  • 19.2.4 Have the locations of underground services been considered against craning activities, storage locations, excavations or other ground works?

  • 19.2.5 Are the site team aware of the immediate actions to take following a service strike?

20 Confined Spaces

  • 20.1 Is confined space access being controlled correctly on site?

  • 20.1.1 Has a PTW been raised for Confined Space Access?

  • Stop the work and ask all personnel to vacate the confined space until a thorough assessment of the work has been completed and a permit is in place.

  • 20.1.2 Are RAMS available and signed by all operatives?

  • 20.1.3 Has a rescue plan been put in place to cover emergency situations?

  • 20.1.4 Is a safety supervisor in position at the entrance to the confined space?

  • 20.1.1 Has a PTW been raised for Confined Space Access?

  • Stop the work and ask all personnel to vacate the confined space until a thorough assessment of the work has been completed and a permit is in place.

  • 20.1.2 Are RAMS available and signed by all operatives?

  • 20.1.3 Has a rescue plan been put in place to cover emergency situations?

  • 20.1.4 Is a safety supervisor in position at the entrance to the confined space?

21 Environmental Awareness & Waste Control

  • 21.1 Are waste materials being segregated correctly?

  • 21.2 Is waste storage effective?

  • 21.3 Are hazardous liquids or fuels stored correctly on site?

  • 21.3.1 Are the storage provisions suitable?

  • 21.3.2 Are spill kits and foam fire extinguishers available near by?

  • 21.3.3 Are the storage areas protected by appropriate bunds or containment?

  • 21.3.4 Are the storage areas positioned to reduce fire risks to the building, plant, equipment or personnel on site?

  • 21.3.1 Are the storage provisions suitable?

  • 21.3.2 Are spill kits and foam fire extinguishers available near by?

  • 21.3.3 Are the storage areas protected by appropriate bunds or containment?

  • 21.3.4 Are the storage areas positioned to reduce fire risks to the building, plant, equipment or personnel on site?

  • 21.4 Are COSHH regulated substances stored in appropriate containers?

  • 21.5 Do materials mixing areas include effective control against spills and leakage?

  • 21.6 Are waste transfer notes being checked and recorded correctly?

22 Demolition

  • 22.1 Are demolition activities being undertaken safely on site?

  • 22.1.1 Has a thorough risk assessment and method statement been created for the works and reviewed by the SM and QHSE?

  • Stop work immediately until the necessary RAMS have been reviewed.

  • 22.1.2 Are the works being conducted iaw the scope of the RAMS?

23 Highway Works

24 Specialist Work at Height

25 Lifts and Escalators

26 Tunneling

27 Plumbing (JIB)

28 Heating, Ventilation, Air-Con & Refrigeration

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.