Title Page

  • Site conducted

  • Company

  • Site Supervisor

  • Project Number

  • Job Description

  • Inspected by

  • Conducted on

  • Location

Site Control

  • Construction site Board and Signage Up-to Date

  • Safety notice board current

  • Job folder

  • Pre-Start information

  • CMP for Project

  • Permits

  • SWMS available and signed by staff

  • Toolbox talk / Daily team consultation meeting completed

  • Daily inspection checklist

  • Hazard Near Miss Injury & Incident Report Form

  • Safety Inductions completed for all on site

  • High risk training completed

  • Variation Form

  • Sprinkler spill kit on site - question workers

  • Environmental Plans/measures

  • Waste Recycling Tracking Form

  • Environmental report - Div 6

  • Percentage of works completed

  • Site Radios

  • Any hold ups to report

Site Facilities

  • Offices clean, adequate & good lighting

  • Tool/equipment sheds adequate

  • Toilets – clean, washing water

General Site Tidiness and Accessways

  • Clear, safe access to work areas

  • Stairways and accessways clear

  • Hoardings/fence and gates secure

  • Loose materials secure from wind

Competencies

  • Construction card - white card

  • High risk work

  • Onsite training completed

Subcontractors

  • Subcontractors on site

  • Subcontractor SWMS

  • Subcontractor insurance details collected (check subcontractor list)

First Aid

  • First aider - who is it? question workers (check training matrix)

  • First aid kit available - check stock and dates

Personal Protective Equipment

  • Signage displayed and legible

  • Hardhats being worn

  • Correct footwear being worn

  • Glasses/ear muffs/vests/masks used

  • Hazard evaluations been performed and certified

  • Protective equipment adequate for exposure

  • Employees issued with PPE where needed

  • PPE being used and are in good condition

  • Inspections being conducted before and after use of PPE

  • Adequate maintenance and sanitary storage available and used

  • Adequate fall protection provided

  • Eye protection available

  • Face protection (glasses, goggles, shields) available and are in good condition

  • Hearing protection available

  • Respirators and masks provided

  • Respirators used to protect against harmful dust, asbestos, sand blasting, and welding (lead, paint, and galvanized zinc or cadmium)

  • Head protection available

  • Hand and foot protection available

  • Physical exams performed as required

Fire Extinguishers and Fire Protection

  • Fire extinguishers fully charged, operable, and kept in designated places at all times

  • Portable fires extinguishers inspected 6 monthly

  • Employees are expected to use fire extinguishers, they've been trained in the general principles of fire extinguisher use and hazards involved with the incipient stage of firefighting

Emergency Evacuation

  • Evacuation point (shown of CMP)

  • Muster point / Evacuation point - Question Workers

  • Written emergency and fire prevention plans made available to building occupants for review

  • Occupants been trained in emergency evacuation of the building

  • Emergency drills conducted on a routine basis

Heavy Machinery

  • First aid kit

  • Fire Extinguisher

  • Service date

Cranes/Hoist/Lifting Equipment

  • Proper lift assessment plan done

  • Crane certification current

  • Slings/chains certified

  • Operator procedures in place

  • Daily pre-start inspections being completed

  • Man cage available

  • Emergency plan in place

Compressed Air Equipment

  • In good condition

  • Appropriate guards fitted

  • Trained user

Excavations

  • Correctly shored

  • Access controlled

Hot Works

  • Hot work permits being issued

  • Fire extinguishers on hand

  • Operators using PPE

  • Safety data sheet available (SDS)

Electrical Equipment/Plant

  • Main board lockable/weatherproof

  • Equipment Tested and Tagged (check dates) and damage-free leads

  • Current tagged plant

  • Leads safely placed - leads hung off the ground

  • Electrical equipment/plant – good condition

  • Electrical equipment/plant – appropriate guards on plant

  • Adequate temporary lighting

Scaffolding – Planks Secured

  • Notifiable weekly Scaftag/current

  • Daily checks

  • Scaffolding Certified

  • Handrails/mid-rails

  • Toe boards

  • Platforms

  • Ladders/stairs

  • Base sound

  • Work platforms clear

  • Platforms trip free

  • Planks tied down

  • Headroom clear

  • Ties/bracing adequate

Ladders

  • Good condition

  • Secured top and bottom

  • Stays to step ladders

  • Working 2 steps down

Chemicals

  • Dangerous goods on site

  • Hazardous goods on site

  • Appropriate bunding in place

  • Risk assessment completed

  • Safety Data Sheet (SDS) available

  • Chemical spill kit on site and in appropriate location

Vehicles

  • Registration

  • Vehicle damage

  • First aid kit - check contents and expiry dates

  • Fire extinguisher

Completion

  • Additional recommendation

  • Full Name & Signature of Inspector

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.