Title Page
-
Site conducted
-
Prepared by
-
Conducted on
-
Address
-
GPS Location
-
Number of meters inspected at location?
-
Operating Company
-
Service Center
-
Service Center
-
Service Center
-
Asset ID(Meter Number)
-
Meter install date
-
Work Order Number
-
Service line install date
-
Service line install Foreman
-
Photo
-
Is the meter installed?
-
Is the XE shutoff valve locked?
-
Is there a plug or cap installed?
-
Is there a customer valve installed?
-
Is the customer piping connected?
-
Is there a plug or cap installed?
-
Is the shutoff valve accessible?
-
Is above-ground piping properly coated?
-
Is there at least a 3-foot radius clearance between the regulator vent and the building opening? (Should)
-
Is the meter regulator no less than 3 feet from a source of ignition or heat?
-
Is there at least a 6-foot radius clearance between the regulator vent and the building mechanical air intake?
-
Is the vent on the regulator insect and rain-resistant?
-
Is the meter protected from vehicular traffic?
-
In new construction, is the meter at least 6 inches above the final grade(Should)
-
Is the meter in contact with the soil?
-
Is the meter properly supported?
-
Is the meter straight and level?
-
Is the meter protected from overhead hazards?
-
Other Concerns?
-
What is the concern?
-
What is the concern?
-
What is the concern?
-
What is the concern?