Information
-
Document No.
-
Country
-
Address/Region
-
Project
-
Client / Site
-
Contractor Name
-
Team Leader Name
-
Number of Team Members
-
Conducted on
-
Prepared by
1. Safety
-
1.1 Safety preparations prior to work start?
-
1.2 Safety briefing was held with all tema members?
-
1.3 All required safety equipment?
-
1.4 Proper safety gear is used?
-
1.5 Proper tools are used?
-
1.6 Proper work shoes for all team members?
-
1.7 All climbing team members climbing certifications are valid?
-
1.8 Safety procedures are followed throughout the work and all employees participate?
2. Documentation/Delivery
-
2.1 Site handover and signed RFI is available?
-
2.2 All link calculation parameters are available?
-
2.3 Tower and floor layout of equipment room as per approved plan is available?
-
2.4 Inventory list of all equipment is available?
-
2.5 Inventory checked prior to start work?
-
2.6 All equipment was properly unpacked according to instructions per unit?
-
2.7 Equipment was properly maintained till installation?
3. Outdoor - Professional Antenna
-
3.1 Mount is sufficient height to clear local obstructions?
-
3.2 Mount is secure and perpendicular?
-
3.3 Mount is safely positioned as to not cause a safety hazard?
-
3.4 Antennas are securely mounted on the antenna pole mount?
-
3.5 Antennas are installed properly and they have no damage?
-
3.6 Antennas launch unit polarization is per link requirements?
-
3.7 Strut is installed properly and cut to length?
-
3.8 Attach antenna installation photos
4. Outdoor - Professional ODU
-
4.1 ODU are securely mounted to the antenna or pole mount?
-
4.2 ODU's are grounded as per installation standards?
-
4.3 ODU's are installed properly and has no physical damage?
-
4.4 ODU's polarization is per link parameters?
-
4.5 IF cables are properly grounded as per specifications?
-
4.6 N-type connectors are done as per specs and properly connected and sealed?
-
4.7 Attach ODU installation photos
5. Indoor - Professional
-
5.1 Floor marking was done according to approved layout plan?
-
5.2 Rack is properly grounded to internal MGB?
-
5.4 IDU's installed on 19" rack?
-
5.5 IDU's installation location have adequate ventilation?
-
5.6 IDU's and DDF's are installed inside the rack with proper and sufficient cage nuts and screws?
-
5.7 IDU's and DDF cables are grounded as per installation specifications?
-
5.8 RSL level compared to link calculation
-
5.9 Any deviation to planned RSL (note values)
-
5.10 IF cables are routed properly to their relevant location?
-
5.11 IF cable loop is up to standards (approx 3m)?
-
5.12 Power and GND cables are routed properly inside the rack?
-
5.13 All cables are dressed and bunched with cable ties?
-
5.14 N-type connector is fastened properly to IDU's?
-
5.15 Power connectors are properly assembled and connected to the IDU's
-
5.16 Doors, end frames, system plates are installed as required?
-
5.17 E1 cables were properly terminated as per customer requirements?
-
5.18 All cables are labeled properly as per customer requirements?
-
5.19 Attach Indoor installation and cable layout photos
6. GND - Professional
-
6.1 Site main GND value has been verified (5Ohm)?
-
6.2 Tower is properly grounded to MGB?
-
6.3 Proper color coded cable (yellow/green) has been used for all GND on site?
-
6.4 All grounding points (IF cable, pole mounts, antennas etc) as per GND standards have been properly done?
-
6.5 All GND cables have been crimped properly and connected properly?
-
6.6 Attach relevant GND points locations photos
7. Audit genera comments and observations
-
7.1 Safety
-
7.2 Documentation
-
7.3 Outdoor professional - Antennas
-
7.4 Outdoor Professional ODU
-
7.5 Indoor Professional
-
7.6 GND professional