Information

  • Document No.

  • Country

  • Address/Region
  • Project

  • Client / Site

  • Contractor Name

  • Team Leader Name

  • Number of Team Members

  • Conducted on

  • Prepared by

1. Safety

  • 1.1 Safety preparations prior to work start?

  • 1.2 Safety briefing was held with all tema members?

  • 1.3 All required safety equipment?

  • 1.4 Proper safety gear is used?

  • 1.5 Proper tools are used?

  • 1.6 Proper work shoes for all team members?

  • 1.7 All climbing team members climbing certifications are valid?

  • 1.8 Safety procedures are followed throughout the work and all employees participate?

2. Documentation/Delivery

  • 2.1 Site handover and signed RFI is available?

  • 2.2 All link calculation parameters are available?

  • 2.3 Tower and floor layout of equipment room as per approved plan is available?

  • 2.4 Inventory list of all equipment is available?

  • 2.5 Inventory checked prior to start work?

  • 2.6 All equipment was properly unpacked according to instructions per unit?

  • 2.7 Equipment was properly maintained till installation?

3. Outdoor - Professional Antenna

  • 3.1 Mount is sufficient height to clear local obstructions?

  • 3.2 Mount is secure and perpendicular?

  • 3.3 Mount is safely positioned as to not cause a safety hazard?

  • 3.4 Antennas are securely mounted on the antenna pole mount?

  • 3.5 Antennas are installed properly and they have no damage?

  • 3.6 Antennas launch unit polarization is per link requirements?

  • 3.7 Strut is installed properly and cut to length?

  • 3.8 Attach antenna installation photos

4. Outdoor - Professional ODU

  • 4.1 ODU are securely mounted to the antenna or pole mount?

  • 4.2 ODU's are grounded as per installation standards?

  • 4.3 ODU's are installed properly and has no physical damage?

  • 4.4 ODU's polarization is per link parameters?

  • 4.5 IF cables are properly grounded as per specifications?

  • 4.6 N-type connectors are done as per specs and properly connected and sealed?

  • 4.7 Attach ODU installation photos

5. Indoor - Professional

  • 5.1 Floor marking was done according to approved layout plan?

  • 5.2 Rack is properly grounded to internal MGB?

  • 5.4 IDU's installed on 19" rack?

  • 5.5 IDU's installation location have adequate ventilation?

  • 5.6 IDU's and DDF's are installed inside the rack with proper and sufficient cage nuts and screws?

  • 5.7 IDU's and DDF cables are grounded as per installation specifications?

  • 5.8 RSL level compared to link calculation

  • 5.9 Any deviation to planned RSL (note values)

  • 5.10 IF cables are routed properly to their relevant location?

  • 5.11 IF cable loop is up to standards (approx 3m)?

  • 5.12 Power and GND cables are routed properly inside the rack?

  • 5.13 All cables are dressed and bunched with cable ties?

  • 5.14 N-type connector is fastened properly to IDU's?

  • 5.15 Power connectors are properly assembled and connected to the IDU's

  • 5.16 Doors, end frames, system plates are installed as required?

  • 5.17 E1 cables were properly terminated as per customer requirements?

  • 5.18 All cables are labeled properly as per customer requirements?

  • 5.19 Attach Indoor installation and cable layout photos

6. GND - Professional

  • 6.1 Site main GND value has been verified (5Ohm)?

  • 6.2 Tower is properly grounded to MGB?

  • 6.3 Proper color coded cable (yellow/green) has been used for all GND on site?

  • 6.4 All grounding points (IF cable, pole mounts, antennas etc) as per GND standards have been properly done?

  • 6.5 All GND cables have been crimped properly and connected properly?

  • 6.6 Attach relevant GND points locations photos

7. Audit genera comments and observations

  • 7.1 Safety

  • 7.2 Documentation

  • 7.3 Outdoor professional - Antennas

  • 7.4 Outdoor Professional ODU

  • 7.5 Indoor Professional

  • 7.6 GND professional

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.