Daily Site Audit
-
1. Site security – controlled access, fenced
-
2. Site access – traffic / pedestrian segregation in place, safe routes provided, suitable barriers and the correct signage?
-
3. Safety barriers / fences are adequate and secure?
-
4. Access and egress routes are kept clear?
-
5. Site Welfare – suitable and sufficient, clean and tidy, maintained?
-
6. Site storage – safe – adequate – secure. Safe lay down areas, materials stacked safety?
-
7. 5-point PPE rule – hard hat – safety boots – high viz – safety glasses – gloves -correct for task, being worn & in good condition?
-
8. Task specific personal protective equipment is worn where identified in RAMS?
-
9. High-risk activities – adequately controlled and permitted?
-
10. Hot work – permitted, fire extinguisher(s) present, combustibles reduced to a minimum, shielding in place, welding fume controlled?
-
11. Electrical procedures – RAMS in place, work permitted, isolations procedures followed with lock offs in place?
-
12. Confined space entry – permitted, supervised workers, serviced equipment?
-
13. Trenches/excavations – inspected correctly, guarded & suitably protected, signage in place?
-
14. Access equipment (ladders, steps, scaffold) is adequate and secure, pre use inspections completed?
-
15. Are ladders and stepladders used only for light work of short duration and when there is no other choice?
-
16. Scaffolding – scaffold tags in place, fit for purpose, edge protection fitted, structure(s) built by competent person?
-
17. Are scaffolds inspected at least weekly by a competent person and the results recorded?
-
18. MEWPS & FLT’s – pre use checks carried out, added to the plant and equipment register, correctly used, in date LOLER cert?
-
19. Site plant and equipment – tagged, maintained, serviceable, keys removed when not in use?
-
20. Keys removed from mobile plant when not in use?
-
21. Tools (including hand tools) are in a good condition?
-
22. Tools are stored in a safe area?
-
23. Portable electrical equipment is ‘in test’?
-
24. Is 110v supply being used on site and are there adequate transformers available on site?
-
25. Floor / work surface is in as good a condition as practicable?
-
26. Lighting (natural and artificial) is good?
-
27. Temporary lighting – suitable & sufficient for the task?
-
28. Site signage – in place, suitable & sufficient, site specific – consider CDM area signage. Fire points, pedestrian routes, PPE?
-
29. Waste streams segregated and adequately controlled?
-
30. Housekeeping – all safe routes clear, work areas clean & tidy, waste removed?
-
31. COSHH substances appropriately controlled on site?
-
32. Spill kits available at appropriate locations?
-
33. Noise hazards on site appropriately controlled?
-
34. Dust hazards on site appropriately controlled?
-
35. Fume hazards on site appropriately controlled?
-
36. Covid control measures in place and monitored?
-
37. Procedures
-
38. Accidents and Incidents