Information
-
Document No.
-
UPC Crew Observation Form
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Crew Information
-
Date
-
Name of Contractor
-
Crew Foreman
-
Job Number
-
Location Number
-
Job
- Energized
- De-energized
- Secondary
- Primary
-
Equipment
- Underground
- Trencher
- Excavator
- Pick-up
- Compressor
- Other
- Plow
-
Details of Job
PPE
-
Hard Hat(s)
-
Eye Protection
-
Rubber Gloves
-
Rubber Sleeves
-
Appropriate Cover Up
Job Preparation
-
Lock Out Tag Out/Hot Line Tag?
Grounding
-
Personal Grounds Used
Traffic Control
-
Four Way Flashers
-
Reflective Traffic Vests
-
Cones Adequate
Risk/Hazard Recognition
-
Are there any unrecognized hazards at the jobsite
-
Are there any unsafe work behaviors being demonstrated by employees
-
Is there any unsafe equipment being used at the job
Signatures
-
Comments
-
Picture of job
-
Inspected By