Information
-
Document number
-
Site
-
Direct Control / Council or Contactor
-
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1.0 - WHS
-
1.1 - Has a risk assessment been undertaken?
-
1.2 - Is there document evidence that personnel have been inducted into the site specific risks, hazards & agreed controls?
-
1.3 - Are SWMS available for all activities onsite?
-
1.4 - Is there a first aid officer & stocked first aid kit available?
-
1.5 - Is housekeeping on site acceptable, in fire extinguisher and electrical equipment tagged for the current period?
-
1.6 - Are Safety Data Sheet (SDS) available?
-
1.7 - Compliance with personal protective equipment (PPE)
-
1.8 - Are daily plant pre-start inspections being complete?
-
1.9 - Is there evidence of Weekly WHS inspections being complete?
2.0 - Environmental
-
2.1 - Has environmental risks been assessed and documented?
-
2.2 - Are site specific environmental requirements known by the Contractor's personnel and documented?
-
2.3 - Is the limit of works known by site personnel and protections put in place for No Go Zones?
-
2.4 - Is housekeeping onsite acceptable, including the installation of effective erosion & sedimentation protection measures?
-
2.5 - Are erosion & sediment controls checked as required? Are environmental inspections being completed as required?
-
2.6 - Are wastes being recorded & managed correctly?
-
2.7 - Are fuels and chemicals appropriately bunded?
-
2.8 - Is wastewater being managed appropriately?
-
2.9 - Is there evidence of equipment been regularly checked for defects? (oil spills,leaks, damaged hoses etc).
-
2.10 - Do site personnel know the procedure for reporting of environmental incidents?
-
2.11 - Is there a spill kit on site and have all personnel been trained in spill management?
3.0 - Quality
-
3.1 - Does the contractor understand the requirements of the Specifications for the activity that they have been engaged to undertake?
-
3.2 - Are inspection and test plans being used and followed?
-
3.3 - Is the inspection and status known ( including witness points and hold points submitted and signed off)?
-
3.4 - Are in coming products checked for compliance?
-
3.5 - Are work quantities recorded accurately?
-
3.6 - Is rectification documented & work undertaken to achieve conformance?
-
3.7 - Are non conformances / nonconforming products identified and documented?
-
3.8 - Is a lot numbering system being used?
-
3.9 - Is monitoring & measuring equipment maintained and calibrated?
4.0 - Traffic
-
4.1 - Has a Traffic Control at work sites location Checklist been complete?
-
4.2 - Is a standard TCP being used?
-
4.3 - Has a site specific TCP been approved correctly and appropriate for the site conditions?
-
4.4 - Has a VMP been approved and appropriate for the site?
-
4.5 - Has a WoF plan been developed that is appropriate to to activity & has it been communicated to site personnel?
-
4.6 - Are the needs of pedestrians and cyclists through the works considered?
-
4.7 - Are Traffic control inspections records being completed accurately?
-
4.8 - Are signs and devices clean, well maintained and installed in accordance with the TCP?
-
4.9 - If required, is the ROL & SZA/DTR documentation in place with records kept? Are the requirements of the ROL known and being met?
-
4.10 - Is there evidence that signs are covered when not in use? e.g. contradictory signs covered
Sign Off
-
On site representative
-
Auditor's signature