Health and Safety
-
Names of Operatives on site
-
Risk and method statement on site
-
Have all operatives on site signed the Risk and method statement ? Task specific to current and future works?
-
Hot works
-
Have Hot works permits been issued by the builder ?
-
Evidence of Hot work Permits ( Picture )
-
Add media
-
If NO evidence is available please give tool box talk on Hot works to all operatives
-
Add media
-
The operatives have the following
- Fire Extinguisher ( fully pressurised )
- Heat Mat
-
Do all operatives have a valid and job specific cscs card ?
-
Do we have a valid PAT test record sheet?
-
Are site Welfare facilities adequate?
-
Is Access and Egress safe for operatives?
-
Personal Protective equipment of operatives evident and acceptable,
-
Manual Handling training required for employed operatives ?
-
Cylinder storage, for example LPG cylinders stored correctly?
-
First Aider and First station available on site for operatives
-
Scaffolding, mobile towers etc have scaff tags present being signed off or withdrawn from use as required?
-
Moving plant, segregated from work force as per traffic management plan?
-
Noise, Are operatives exposed to high levels of noise? Suitable protective equipment supplied?
-
Control of chemical spillages, Geratator spill kits are supplied and being used?
-
Cable management, trailing leads are elevated and not causing trip hazards.
-
House keeping of operatives
-
Coshh file present and items segregated/stored in a lockable store.
-
Any electrical hazards identified
-
Copy of last Tool box talk given
-
Add media
-
Copy of Plant and Equipment register
-
Add media
-
Please document any Health and Safety issues found
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
Project Report
-
Copy of Site program
-
Upcoming Program of works
-
Site Progress, note all completed works
-
Material Requirements
-
Material issues
-
Labour issues
-
Labour Requirements
-
Day work carried out
-
Note any site variations required / carried out
-
Other comments , sequence of works correct ?