Traffic management plan
-
1.1 is there a Traffic Management Plan in place for the project?
-
Please detail the action necessary that you are taking to rectify this. Advise Supervisor. Rectification actions may include advising worker/s to stop work and discussing requirements prior to recommencing work.
-
1.2 has the Traffic Management Plan been approved for use?
-
Please detail the action necessary that you are taking to rectify this. Advise Supervisor. Rectification actions may include advising worker/s to stop work and discussing requirements prior to recommencing work.
-
1.3 were there any negotiations with relevant authorities?
-
1.4 is there a MOA in place?
-
Please detail the action necessary that you are taking to rectify this. Advise Supervisor. Rectification actions may include advising worker/s to stop work and discussing requirements prior to recommencing work.
-
1.5 does the person(s) that set out the traffic guidance scheme hold a Implement Traffic Management Plan ticket?
-
Please detail the action necessary that you are taking to rectify this. Advise Supervisor. Rectification actions may include advising worker/s to stop work and discussing requirements prior to recommencing work.
-
2.1 is there evidence that an inspection of the traffic control devices and guidance scheme has been completed before works commence?
-
Please detail the action necessary that you are taking to rectify this. Advise Supervisor. Rectification actions may include advising worker/s to stop work and discussing requirements prior to recommencing work.
-
2.2 is there evidence that an inspection of the traffic control devices and guidance scheme has been completed during working hours?
-
Please detail the action necessary that you are taking to rectify this. Advise Supervisor. Rectification actions may include advising worker/s to stop work and discussing requirements prior to recommencing work.
-
2.3 is there evidence that an inspection of the traffic guidance scheme has been completed following removal of the traffic devices?
-
Please detail the action necessary that you are taking to rectify this. Advise Supervisor. Rectification actions may include advising worker/s to stop work and discussing requirements prior to recommencing work.
-
3.1 do the traffic controllers hold a Control Traffic with Stop-Slow Bat ticket?
-
Please detail the action necessary that you are taking to rectify this. Advise Supervisor. Rectification actions may include advising worker/s to stop work and discussing requirements prior to recommencing work.
-
3.2 is there sufficient numbers of traffic controllers to allow for regular breaks to occur?
-
Please detail the action necessary that you are taking to rectify this. Advise Supervisor. Rectification actions may include advising worker/s to stop work and discussing requirements prior to recommencing work.
-
4.1 is a traffic mounted attenuator used?
-
Please detail the action necessary that you are taking to rectify this. Advise Supervisor. Rectification actions may include advising worker/s to stop work and discussing requirements prior to recommencing work.
-
4.2 is the minimum clearance zone of 20m between workers and the truck mounted attenuator maintained?
-
Please detail the action necessary that you are taking to rectify this. Advise Supervisor. Rectification actions may include advising worker/s to stop work and discussing requirements prior to recommencing work.
-
4.3 are shadow vehicles used?
-
Please detail the action necessary that you are taking to rectify this. Advise Supervisor. Rectification actions may include advising worker/s to stop work and discussing requirements prior to recommencing work.
-
4.4 if so are they fitted with an arrow board and revolving amber light(s)?
-
Please detail the action necessary that you are taking to rectify this. Advise Supervisor. Rectification actions may include advising worker/s to stop work and discussing requirements prior to recommencing work.
-
5.1 are the minimum deflection zones maintained?
-
Please detail the action necessary that you are taking to rectify this. Advise Supervisor. Rectification actions may include advising worker/s to stop work and discussing requirements prior to recommencing work.
-
5.2 has the perimeter containment screening been installed as per the manufacturers and VicRoad requirements?
-
Please detail the action necessary that you are taking to rectify this. Advise Supervisor. Rectification actions may include advising worker/s to stop work and discussing requirements prior to recommencing work.
-
5.3 if working on footpaths, is there an appropriate barrier in place to prevent pedestrians inadvertently stepping into traffic?
-
Please detail the action necessary that you are taking to rectify this. Advise Supervisor. Rectification actions may include advising worker/s to stop work and discussing requirements prior to recommencing work.
-
6.1 are emergency contact number posted in areas where temporary traffic controls are in place outside of working hours?
-
Please detail the action necessary that you are taking to rectify this. Advise Supervisor. Rectification actions may include advising worker/s to stop work and discussing requirements prior to recommencing work.
-
6.2 is the process for responding to emergencies outlined in the Work Pack?
-
Please detail the action necessary that you are taking to rectify this. Advise Supervisor. Rectification actions may include advising worker/s to stop work and discussing requirements prior to recommencing work.
-
7.1 is the project/site compound clearly demarcated and sign posted, including access and egress for pedestrians, light vehicles and heavy vehicles?
-