Title Page
-
Project No.
-
Project:
-
Work Pack Activity /Task
-
Work Pack Number
-
Conducted on
-
Location
-
Personnel
-
Prepared by
-
Work sequence undertaken as per Work Pack
-
Compliance with Safety Essentials
-
Access/egress acceptable
-
Working environment acceptable I.e dust, light, noise
-
Housekeeping is well controlled
-
Plant, tools and equipment being used are correct
-
"Above the line"controls in place for high risk work
-
Materials used are verified as acceptable
-
Inspection, test and control points being observed
-
Environmental controls in place
SWMS Review Checklist
-
Has SWMS been signed off by the Project Manager?
-
Have all the workers signed onto the SWMS?
-
Have there being any changes to the SWMS?
-
Has the Project Manager authorised the changes?
-
Are all the controls in place?
-
Are there any new hazards?
-
Is work proceeding in compliance to the SWMS?
-
Do the workers know to stop work if a non compliance is identified, and only restart when the SWMS can be complied with?
-
Action required:
-
Assigned to:
-
Date due
-
Lead observer to sign