Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Select date
-
Rail infrastructure west
-
Discipline
- Rail
- traffic
- survey
- construction
- deconstruction
- environment
- laydown
- pedestrian interface
- turnouts
- crossings
- office
- worksite
-
Lead observer
-
Other observer
-
Other observer
-
CRM's
- rollingstock
- plant
- moving loads
- Steel
- extreme weather
- electricity
- pedestrian interface
- isolations
- traffic management
- services
-
Take a photo if you would like
-
Positive behaviours
-
Gaps ( if applicable)
-
Equipment used in task
- Loader
- Excavator
- HiRail
- Tipper
- Watercart
- Service truck
- Flash Butt Welder
- AT welding
- Grinder
- Saw
-
Immediate actions taken in the field
-
Actions required
- equipment required
- PPE required
- housekeeping
- supervision actions
- PPE compliance
- barriers
- cardinal rule breach
- further education
- hazard and control action
-
Action timeframe
-
Actions required
- equipment required
- PPE required
- housekeeping
- supervision actions
- PPE compliance
- barriers
- cardinal rule breach
- further education
- hazard and control action
-
Action timeframe
-
Actions required
- equipment required
- PPE required
- housekeeping
- supervision actions
- PPE compliance
- barriers
- cardinal rule breach
- further education
- hazard and control action
-
Action timeframe