Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location on site
-
Photo of site plan showing location of crane
-
Reason for lifting operation
Crane
-
Crane Type
-
Crane Serial number
-
Does this match the lifiting plan
-
Date of last Thorough inspection for the crane
-
Photo of the inspection Certificate
-
Date of the last weekly inspection (LOLAR)
-
Photo of last weekly inspection
Lifting accessories
-
Last lifting accessories 6 monthly inspection report
-
Photo on inspection report
Lifiting Items to be used
-
Item description 1
-
Serial number
-
Is this item recorded on the 6 monthly report?
Site Pre-Lift Checks
-
Banksman Available
-
Can the Banksman Communicate Clearly with the crane
-
Are the out-riggers correctly deployed and based as per the lift plan
-
Are their any over head hazzards
-
Are their any underground hazards - Culverts, Manholes etc
-
Will the Jib and /or load oversail public areas or other operatives
-
is access to the materials to be lifted clear
-
What are the weather conditions?
-
Is the wind speed with in the cranes safe working limit
Signatures / Authorisation
-
Is the crane lifting authorised today?
-
Crane Operator signature
-
Lifting Supervisor Signature
-
Site manager Signature