Information

  • Site

  • Location
  • Conducted on

  • Prepared by

  • Personnel present

General requirements

  • Australian Standards 3850.2003 and Code of Practice for Tiltup and precast concrete available onsite

  • Add media

  • All personnel including supervisors have been trained in accordance to an accreditated Tiltup and precast concrete course

  • Add media

  • All untrained personnel requiring access to tilt panel areas been given authorisation to do so by relevant personnel (use of form F8.83)

  • Add media

  • Has Worksafe been notified of intention to carry out Tiltup work (5 days prior to commencing work)

  • Add media

Panel Construction

  • Shops drawings i.e. drawings signed by a certified engineer

  • Add media

  • Have all structural components in panel been inspected by a competent person prior to casting

  • Add media

  • Safe storage onsite for panels i.e. not leant against temp brace panel

  • Add media

  • Suitable area for onsite casting has been selected and designated

  • Add media

  • JSA for panel construction in place

  • Add media

Setup for erection

  • Riggers and crane operator have high risk licences

  • Add media

  • JSA for rigging and crane operations in place

  • Add media

  • Crane operating in safe manner i.e. clear of OHPLs, setup with barricading, outriggers, etc.

  • Add media

  • Crane and lifting accessories documentation in place i.e. log books, plant risk assessments, mobilisation checklists, lifting register, etc.

  • Add media

  • Safe erection process i.e. fall zones, panel and bracing

  • Add media

  • Interface and traffic management/safety zones in place including appropriate barricades and signage

  • Add media

  • Access and erection area is safe

  • Add media

  • EWP used rather than ladders

  • Add media

Post Erection

  • Braces installed as per documentation i.e. locked 2 per panel and where possible located at two thirds of the height of the panel

  • Add media

  • Braces been inspected and supplied with work loading limits, inspection/maintenance certificate

  • Add media

  • Braces are not removed until final written instruction from design engineer has been obtained

  • Add media

  • Panel tied in at footing

  • Add media

Corrective Actions

    Corrective Actions
  • Description

  • Add media

  • Risk Rating

  • Action by

  • Date completed

  • Completed sign off

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.