Information
-
Site
-
Location
-
Conducted on
-
Prepared by
-
Personnel present
General requirements
-
Australian Standards 3850.2003 and Code of Practice for Tiltup and precast concrete available onsite
-
Add media
-
All personnel including supervisors have been trained in accordance to an accreditated Tiltup and precast concrete course
-
Add media
-
All untrained personnel requiring access to tilt panel areas been given authorisation to do so by relevant personnel (use of form F8.83)
-
Add media
-
Has Worksafe been notified of intention to carry out Tiltup work (5 days prior to commencing work)
-
Add media
Panel Construction
-
Shops drawings i.e. drawings signed by a certified engineer
-
Add media
-
Have all structural components in panel been inspected by a competent person prior to casting
-
Add media
-
Safe storage onsite for panels i.e. not leant against temp brace panel
-
Add media
-
Suitable area for onsite casting has been selected and designated
-
Add media
-
JSA for panel construction in place
-
Add media
Setup for erection
-
Riggers and crane operator have high risk licences
-
Add media
-
JSA for rigging and crane operations in place
-
Add media
-
Crane operating in safe manner i.e. clear of OHPLs, setup with barricading, outriggers, etc.
-
Add media
-
Crane and lifting accessories documentation in place i.e. log books, plant risk assessments, mobilisation checklists, lifting register, etc.
-
Add media
-
Safe erection process i.e. fall zones, panel and bracing
-
Add media
-
Interface and traffic management/safety zones in place including appropriate barricades and signage
-
Add media
-
Access and erection area is safe
-
Add media
-
EWP used rather than ladders
-
Add media
Post Erection
-
Braces installed as per documentation i.e. locked 2 per panel and where possible located at two thirds of the height of the panel
-
Add media
-
Braces been inspected and supplied with work loading limits, inspection/maintenance certificate
-
Add media
-
Braces are not removed until final written instruction from design engineer has been obtained
-
Add media
-
Panel tied in at footing
-
Add media
Corrective Actions
- Corrective Actions
-
Description
-
Add media
-
Risk Rating
-
Action by
-
Date completed
-
Completed sign off