Audit Information
-
Site
-
Location
-
Conducted on
-
Prepared by
-
Personnel present for audit
Project Information
-
Project Number
-
Project Manager
-
Site Supervisor
-
Scope of works
Scoring Information
-
Rating Scale Compliance
0 Unacceptable 0-25% Immediate action required/ Major non-compliance
1 Poor 25% Attention required before the end of the day
2 Fair 50% Attention required within the next 2 days
3 Acceptable 75% Minimal rectification required
4 Good 100% No action required
Based on:
0 Potential for serious injury/ major damage to equipment
1 Likelihood for an incident occurring
2 General non-compliance with legal or site safety requirements
3 Compliance substantial but not 100%
4 All areas satisfy both legal and site safety requirements
Not applicable:
* - Not Applicable - To be placed in appropriate section when not being audited
Audit Target
80% +
General Comments
-
General Comments
-
OHS Comments
-
Environmental Comments
-
Quality Assurance Comments
-
Target Improvements
Job Site Information (Reg 3.2/3.10) and Communication
-
Site specific Management Plan on site?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Name and location of emergency and medical services for the project posted?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Name of key personnel on site for the project posted?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Emergency/Evacuation procedures posted including an evacuation plan and site specific emergency flow charts been established and displayed?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is the Major Incident flowchart displayed?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is there an emergency and first aid checklist (Form F8.48) and when was it last reviewed?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Name of the first aider posted?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Have emergency drills been executed? Form F8.64
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Name of the Health and Safety Representative posted?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are company policies displayed in site office and crib room?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is relevant OHS information displayed in the site office and crib room or readily available to all personnel
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Have all site personnel and subcontractors received a site induction?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is there a construction "Blue/White Card" induction register on site and is it being used?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is there photocopied records of relevant training/licences for personnel who carry out specific tasks and/or high risk activities?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Site inspections conducted and recorded. Copies kept on site?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Emergency evacuation point identified and displayed on the notice board and site office
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Access to copies of Act 1984 and Regs 1996 on site?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are toolbox meetings held and allow site personnel to participate in the safety effort
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are safety and environmental meetings held and documented?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are safety and environmental issues requiring follow up recorded and/or discussed and/or evaluated at e monthly meeting
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
First Aid Facilities and Amenities (Reg 3.7/3.11)
-
Easy access to first aid box and register
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Contents clean, orderly, stocked and labelled
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Toilets clean, supply of soap, hand towels, toilet paper (Male/Female)
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Trades aware of first aid box location and procedure
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Facility easily identified - Green cross displayed outside of site office
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Clean lunch room with adequate supply of water and facilities
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Fridge and microwave clean
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Bins not overflowing
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Accident/Incident
-
Is there an accident/incident register and is it up to date?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are accident/incidents report and recorded on form F8.47? Are accidents/incident investigated where required and the results recorded on Form F8.01?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is the accident/incident followed up and recorded? Are corrective actions implemented where required?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are accident/incidents statistics recorded on daily OHS&E statistical spreadsheet and is spreadsheet up to date?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Brief description of incidents for the month and record of LTIs and MTIs
Site Conditions (Reg 3.7/3.11)
-
Are all access points onto site clear and unobstructed e.g. General building material and rubbish
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Construction warning signage at each site entry
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Hard hat signage
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Footwear signage
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Eye protection signage (if required)
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Hearing protection signage (if required)
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Hi-Vis vest worn (if required)
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Electrical tagging signage
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Public Safety (OSH Act Sec 20-22)
-
Construction material kept within the workplace. Public area not obstructed.
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
No risk of objects falling into public areas
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
No trip hazards to the public
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Site perimeter fencing or barriers erected
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Roads unobstructed, permits and signage in place
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Hazard Identification
-
Are identified significant hazards recorded on the Project Risk Assessment and a Risk Register prepared where required?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Have design risk assessments been obtained and reviewed?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Job Safety Analysis for work being carried out in the project in place
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Have the JSAs been monitored and reviewed?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
If not which one require reviewing?
-
Are JSAs provided by subcontractors for specific hazardous tasks
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
We're the JSA participants involved in the preparation and review of the JSA prior to the job starting and all operatives involved in the task signed onto the JSA
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Was the JSA referred to during the job and were the job steps followed and effective?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Personal Protective Equipment (Reg 3.32/3.44)
-
PPE supplied
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Training in correct use, maintenance, etc of PPE
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Trades wearing eye protection, safety harness, hard hats, safety footwear, hearing protection, safety gloves and Hi-Vis vests (as required)
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Electrical (Reg 3.59/3.65 and AS3012)
-
Permanent live boards lockable
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Temporary power box tagged and numbered
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Temporary construction power to box tagged
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Covers used correctly and leads through the bottom of the box
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Insulated tie bars in place
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Electrical tools/leads with current testing and tagging and in good condition
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Electrical leads raised off the ground by at least 2m
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Electrical register available on site and filled out
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Power located within 30 metres of work area (no piggy backing)
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Proof of Dial Before You Dig and/or scanning report available on site
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Permit provided to work near overhead power lines or underground services
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Overhead power lines identified
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Electrical danger poster displayed
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Correct extinguishers on site
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Correct step ladders in use for electrical work
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Step ladders used correctly
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Isolation permits and isolation log in place
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Fire Prevention and Protection (Reg 3.9)
-
Access/exits clear and clearly signposted
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Fire extinguishers accessible (around the amenities) and easily identifiable
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are fire extinguishers strategically located around the site , easily identifiable and readily accessible?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are fire extinguishers the right type for the hazard and have relevant operating instructions
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Hydrants clear of materials
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Do fire extinguishers have an up to date inspection tag (6 months)
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Ate fire detection control measures in place if required and what are they
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Welding and Cutting (Reg 3.94)
-
Have all subcontractors carried out a risk assessment for the hot works they are carrying out
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Hot work permit systems available and in place as required
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Good housekeeping maintained
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Double flash back arrestors fitted and current tagging on welder
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Equipment in good condition
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Verify that oxy/acetylene gas bottles are fitted with flashback arresters (at cylinder end for hoses <3 metres. Cylinder and hand piece/torch end for hoses >3 metres)
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
During welding are screens in place?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is there adequate signage in place to warn others of dangers of welding?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Has the area for hot works been barricaded off
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Hand Held Power Tools (Reg 3.6)
-
Proper tools for the job
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Tools in good condition and all safety guards fitted
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
RCD protection in place
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Petrol driven tools not used in poorly ventilated areas
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Petrol driven and concrete cutting tools used in accordance with manufacturer's instructions and Code of Practice
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
http://www.commerce.wa.gov.au/WorkSafe/PDF/Codes_of_Practice/Code_concrete_masonr.pdf -
Drilling & Cutting Permit in place for coring and chasing?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Spotter/barricading, warning signage below slab for coring works
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Warning signage for laser use in place?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Work area barricaded off when laser in use?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Explosive Powered Tools and Nail Guns (Reg 4.50/4.51)
-
Regulations known and being complied with
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Competent instruction and supervision being carried out while EPTO is in use
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Operator wearing eye and ear protection
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Warning signs erected and in place
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Area isolated and/or barricaded
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Mobile Plant
-
Bobcat tractor/forklift used in accordance with manufacturer's instructions, in good/serviceable condition and clean
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are guards in place where required and are they effective
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are SWLs, capacities, tolerances, etc known for equipment, displayed and complied with
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is mobile plant operated well clear of overhead power lines?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is mobile plant operated by trained, competent and certified operators
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Manufacturer's instructions available and log book completed
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are relevant records available for plant being operated on site - plant risk assessment, mobilisation checklist, JSA and daily/weekly checklists
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is the plant and equipment register available and up to date?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Hoists
-
Hoists have overhead operators protection
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Hoist properly erected and operated
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Hoists have base level guard rails
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Safe access and egress to hoist working platform
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Hoists have log books available
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Hoist has isolating device e.g. key
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Hoists have all upper levels with guard rails fitted
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is person certified to operate hoist above 11m or competent to operate hoist under 11m
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Hoist above 11 metres fitted with sign nominating authorised certificated person only and names the person.
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Elevated Working Platforms
-
EWP log book available and completed
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are relevant documents and records such as plant risk assessment, mobilisation checklist, inspections, JSAs and maintenance records available
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
EWP's sited on firm and level ground
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
EWP operator trained and have they a high risk licence if operating a boom type EWP
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are harnesses being worn in EWPs/cherry pickers
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are SWLs, capacities and and tolerances, etc known for relevant equipment, displayed and complied with
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is mobile plant kept clean and in a serviceable condition
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Mobile Crane
-
Crane has log book, maintenance records and Worksafe certification available
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Crane with flashing lights, alarms, outriggers?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Crane inspection regularly carried out by competent person (daily inspection)
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
When crane is in operation is it located on compacted or stabilised ground
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
When crane is in operation is the crane and movement of the crane jib well clear of any overhead power lines
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is there a means of restriction or control to prevent persons entering te area or vicinity in which a crane is operating?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Has operator and dogman/rigger relevant high risk licences?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are slings and chains in good condition and tagged
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is there a lifting register in place
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Tower Crane
-
Clear of unnecessary personnel when lifting loads
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Crane operators and riggers have clear communication method
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Has operator and dogman/rigger got relevant high risk licences?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Has the daily checklist been completed and documented? Have the safety devices been checked?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is there documentation to show the crane box, first aid cage and kibble have the appropriate certification and SWL marking on them
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is all the crane documentation available on site to indicate the crane complies with the legislative requirements
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are slings and chains in good condition and tagged
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is there a lifting register in place
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Hazardous Substances and Dangerous Goods
-
Is there a current (five year) MSDS available for all hazardous substances on site and register in place
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Access to register and MSDS sheets by employees
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are subcontractors complying with MSDS in their SWMS
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are risk assessments with the JSAs/SWMS
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is there a sign off by the subcontractors showing all employees working with hazardous substances have been trained in the MSDS
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is there appropriate storage available for Hazardous Substances on site
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Verify that there is a fire extinguisher with oxy/acetylene gas bottles while they are being used
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Verify that gas bottles are stored in a cage while not in use and that the gas bottles are stored separately
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Synthetic fibres controlled in accordance with MSDS
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Road Traffic Management and Management of Site Vehicles
-
Reversing vehicles controlled by trained spotters
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Traffic management plan available on site
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Traffic movement in accordance with the plan implemented on the site
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is all signage in good condition and free from vandalism/tampering
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
System to control movement of traffic onsite (site specific management plan in place and is displayed)
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Operators of vehicles properly trained
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Safe unloading of vehicles implemented on the site
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Does the traffic management plan need to be reviewed for current or future works
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Excavations
-
Adequate access into the excavation e.g. Ladders/ramp
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Shoring in place and adequate for the purpose
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is the depth of the excavation greater than 1.5 metres and if so has risk assessment been carried out
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is there an observer present when workers are in an excavation at least 1.5 m deep
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Excavations greater than 1.5 metres benched, battered or shored
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Adequate barriers erected around the excavations
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Spoil heaps near excavations edge
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Stacking of material near excavation edge
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Passing traffic near excavation edge
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is the stability of buildings/structures adjacent to an excavation maintained
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Permit system in place for excavation
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Diagrams showing locations of utility services
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Housekeeping (Reg 3.17)
-
Regular disposal of rubbish
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Passageways, walkways and access ways clear of building material
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Adequate lighting for task
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Bins provided
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Reo-steel capped
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Work areas tidy
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Slip, trip and fall hazards identified
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Chutes used for waste disposal in good working condition
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Barriers at the base to restrict others from entering bin areas
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Bins covered to contain dust and debris
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Rubbish removed by mechanical means
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Working At Heights (Reg 3.48 - 3.57)
-
Has a risk assessment been carried out before commencement of any work at heights
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are harnesses required to be worn and is there a rescue procedure in place
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
If harnesses in use and do anchor points comply with relevant Australian standards
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is PPE inspected an maintained and all fall restraint register established
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Has safe access been provided - Stair or ladder access
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is edge protection erected to comply with regulations
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are all materials secured from movement
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are all trades trained and holding current certificate for Working at Heights
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are there guard rails on all stairs and above ground level landings and fixed platform
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is there a permit system in place for Working at Heights
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are any holes or openings in any floor appropriately covered, have appropriate signage "Danger Hole Beneath" and / or is protected using guard rails
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Scaffold (Reg 3.67/3.74)
-
Scaffolds properly constructed to AS 1576.1.6
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is scaffold erected by a certified scaffolder
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
As there handover certificates or checklists in place
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is scaffold erected on a stable foundation and secured to the structure in accordance with the code of practice
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Standards on concrete fitted with base plates
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Standards with screw jacks and sole boards
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Scaffold tied in to prevent collapse of scaffold (adequate bracing in place)
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Edge protection in place for all scaffolding over 2 metres in height
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Kick boards/mesh guards fitted to platforms
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Sheeted or netted scaffolds fitted with additional ties to resist wind loads
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Tagging system on scaffolds above 4 metres (scaffold sign off)
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Tagging system fitted on each access point (access ladder)
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Tagging system legible, durable and up to date
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Warning signs/barriers in place for incomplete scaffolds
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Planks secured from uplift/movement
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Working platforms fully decked
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Platforms of a suitable width for the work being carried out
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Safe access provided to working platform
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
During construction of the scaffold is the immediate area around the base barricaded off or otherwise controlled to minimise risk of injury from falling objects
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is there protection for scaffold within 6 metres of electrical conductors?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Loading bays evenly distributed with loads? SWL sign fitted?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are harnesses required for the tasks being carried out
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Have scaffold trades completed a Working at Heights Course
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Mobile Scaffold (Reg 3.67/3.74)
-
Mobile scaffold complies with suppliers specifications
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Mobile with equipment and components in place
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Edge protection with top rail, mid rail and kick board fitted for mobile scaffold above 2m
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Mobile with ladder correctly fitted
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Scaffold braced correctly
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Tagging system on scaffolds above 4 metres (scaffold sign off)
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Tagging system fitted on each entry point (access ladder)
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Tagging system legible, durable and up to date
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are there checklists in place
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Warning signs/barriers in place for incomplete scaffolds
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Castors fitted and locked
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Working platforms fully decked
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Outriggers/ties fitted where required
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Ladders / Step Ladders (Reg 3.26)
-
Are ladders erected and compliant with regulations
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are access ladders appropriate and secured at the top and bottom
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Do ladders extend a minimum of 1m above the platform
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are ladders angled at the correct distance from the structure to be accessed, 1 out and 4 up
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are ladders maintained in good condition
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are all step ladders auto locking and/or platform ladders
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are step ladders being used for the appropriate work tasks being carried out (i.e. electrical work)
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are all access points clear and unobstructed
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is the area around the ladder clear of all fall hazards
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Has there been a documented ladder inspection checklist during the last 30 days
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Formwork (Reg 3.48/3.57)
-
Is there a risk of fall from height
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Written procedures developed and followed for working at heights (JSA)
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Permit system for working at heights
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
If stay harnesses are in use, do they and the anchor points comply with relevant Australian Standards
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Personnel trained in use of PPE e.g. safety harness if required
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
PPE inspected and maintained and fall restraint register established
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Safe access/egress provided to all work places
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Objects removed from fall zones
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Edge protection as required
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Catch platforms provided to prevent persons from falling from a height
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Formwork progressing in a systematic manner
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Formwork checked by a competent person
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Barriers erected in work areas
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Warning signs erected to prevent persons walking into fall zones
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Ladder/stair access provided
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Fall zones barricaded off
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Penetrations meshed, covered with warning signs
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Tilt Panel and Pre-cast Concrete (Reg 3.88)
-
Personnel i.e. riggers/crane operators are trained
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Crane operations i.e. setup, power lines, slings, etc.
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Documentation i.e. logbooks, JSAs, etc.
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Shop drawings i.e. drawings signed by certified engineer
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Australian Standards 3850-2003 and Code of Practice for Tiltup and Precast Concrete available onsite
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
http://www.commerce.wa.gov.au/WorkSafe/PDF/Codes_of_Practice/Code_Tiltup_Precast_.pdf -
Safe erection process i.e. fall zones, panels and bracing
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Braces i.e. locked 2 per panel
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
EWP used rather than ladders
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Safe storage onsite for panels i.e. not leant against temp brace panel
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
All personnel including supervisors have been trained in accordance to an accredited Tiltup and precast concrete course
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
All untrained personnel requiring access to tilt panel areas been given authorisation to do so by relevant personnel (use of form F8.83)
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Safety signage and barricades erected
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Health Hazards
-
Is noise monitored in the workplace to determine the requirement for PPE
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are there any work activities that require personal exposure monitoring/health surveillance
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are personnel protected from exposure to excessive vibration
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is ventilation, lighting and temperature in confined spaces and site offices monitored and controlled to ensure the health and safety of personnel
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Environmental/Green Star
-
Is there an environmental plan for the site
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Has the environmental plan been signed by the project manager
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is there a complete spill kit available on site
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is the site maintained in a clean and tidy state to minimise the occurrence of environmental incidents
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are drains inside the site free from building materials
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is dust generated by vehicle movement minimised using appropriate road base or the application of water?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is dust generated by the cutting of concrete, bricks, tiles, etc minimised using wet cutting where applicable, vacuum or dustless cutters?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are emissions produced from fixed or mobile plant minimised in accordance with the relevant code?
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are gutters outside the project free of building materials
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are the gutter drains protected by enviro socks or other means
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are the sedimentation fences in place and being maintained around the site
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Have the bricklayers a system to prevent waste when using their equipment e.g. Brick saw or mixer
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Does the painter have a system in place for disposal of excess paint
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are waterways (sewers, storm water drains, etc) and soil protected from contamination by the discharge of any polluting substances i.e. the washing down of plant and equipment and concrete trucks
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are chemicals stored and used responsibly, and chemical wastes disposed of according to best industry practice
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is noise minimised to comply with the local authority requirements and specific client requirements e.g. Restricted working hours
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is equipment that causes excessive vibration assessed and selected to minimise any structural damage to the project or surrounding buildings
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are materials used in an economical manner
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are all recyclable materials segregated and stored appropriately for reuse or off site recycling
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are all water supplies turned off when not in use
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Is all electrical equipment turned off when not in use
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Have the weekly inspection sheets been completed and actioned
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Has there been a quarterly environmental inspection done and documented
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Has there been any training in the environmental plan
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
-
Are the dewatering pits in good condition and is fencing adequate
- Unacceptable
- Poor
- Fair
- Acceptable
- Good
- Not Applicable
-
Observation
-
Add media
Quality
-
RFI register in place and up to date
-
Observation
-
Add media
-
RFI hard copy on site with answers
-
Observation
-
Add media
-
Drawing register in place and up to date
-
Observation
-
Add media
-
Do drawings match register
-
Observation
-
Add media
-
Permit system in place and is register up to date
-
Observation
-
Add media
-
Meeting minutes maintained on site
-
Observation
-
Add media
-
Building licence on site and displayed
-
Observation
-
Add media
-
ITPs established and maintained (i.e. pre-pour checklists, etc)
-
Observation
-
Add media
-
Product Registers in place and maintained (i.e. concrete register, etc)
-
Observation
-
Add media
Corrective Actions
-
High Risk: Does the hazard have the potential to kill or permanently disable you? - Action immediately
Medium Risk: Does the hazard have the potential to cause a serious injury which will temporarily disable you? - Action within 24 hours
Low Risk: Does the hazard have the potential to cause a minor injury which would not disable you? - Action within 7 days -
Corrective Actions/Recommendations Report
Corrective Action
-
Corrective Action description
-
Add media
-
Risk Level
-
Action by who?
-
Action complete
-
Action complete sign off
-
Action complete date
-
Opportunity for Improvement
OFI
-
OFI description
-
Add media
-
Notes/comments
-
This site safety inspection report is advisory and is for the use of the party to whom it is addressed and for no other purpose. No responsibility is accepted or undertaken to any third party who may use or rely on the content of this report. No responsibility is accepted or undertaken for any decisions made by the addressee in relation to sit e safety, whether made on the basis of this report or otherwise.
Additional Comments