Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Please complete as many areas of audit as possible. Please provide corrective actions at end of report along with photographic evidence where possible.
-
Report to be signed off by Senior Management and returned to Site Team and OHS&E Department
Access Roads
-
Road clear of mud and site material?
-
Construction site signage displayed and clean
-
Obstructions clearly identified and controlled
-
Comments
Site Acess
-
Gates secured when not in use?
-
Signage on first fence of gate stating location of site office?
-
Fencing secure and in good order?
-
Comments
Site Car Park
-
Signage displayed to Site Office?
-
Area clear of building materials?
-
Comments
Site Reception
-
NG signage displayed?
-
Visitor sign in book available?
-
NG contact persons details displayed?
-
Emergency procedures displayed?
-
First Aid facilities displayed?
-
Comments
Site Induction
-
Induction register available and to date?
-
Induction process in place for workers?
-
Induction process in place for visitors?
-
Induction process in place for deliveries?
-
Visitors escorted on site?
-
Records kept for site personnel?
-
Comments
PPE
-
All personnel on site wearing minimum PPE?
-
PPE available for visitors?
-
PPE in good order?
-
Additional PPE available?
-
Comments
SWMS/JSA
-
SWMS for each task developed and available for all personnel?
-
JSA developed by site personnel?
-
SWMS and JSA approved by Site Supervisor?
-
SWMS and JSA signed and dated?
-
SWMS and JSA checklist done?
-
Comments
Permits to Work
-
Are PTW in place for activities?
-
Are PTW signed and dated?
-
Are PTW understood by all involved in activities?
-
Are conditions of PTW being met?
-
Are PTW kept with SWMS/ JSA?
-
Comments
Emergency Procedures
-
Are emergency procedures understood by all?
-
Are emergency procedures displayed in workplace?
-
Is there a list of emergency contact numbers?
-
Are client personnel aware of NG ERP?
-
Are NG aware of client ERP?
-
Are muster points identified?
-
Is there a method of accountability for site personnel and visitors?
-
Comments
Storage of Hazardous Materials/ Dangerous Goods
-
Is storage of Hazardous Substances/Dangerous Goods in compliance with regulations?
-
Is Hazardous Substance/Dangerous Goods signage in place at storage areas?
-
Is fire protection available?
-
Is there an inventory/ register of Hazardous Substances/Dangerous Goods?
-
Are fuel containers identified?
-
Are refuel procedures in place?
-
Comments
Pre-Start
-
Are pre-start meetings held?
-
Are meetings documented?
-
Is there an attendance record?
-
Are pre-start checks of machinery and equipment undertaken?
-
Are pre-start checks logged?
-
Comments
Safety and Toolbox Meetings
-
Are regular meetings undertaken?
-
Are meetings minuted?
-
Are meetings available to workforce?
-
Comments
Housekeeping
-
Is site clear of unnecessary obstructions?
-
Is rubbish/ waste contained?
-
Are rubbish containers available?
-
Is there a waste disposal plan in place?
-
Are trip hazards controlled?
-
Are no go areas fenced/ flagged?
-
Are no go areas controlled by signage?
-
Are site signs clean and legible?
-
Comments
Amenities
-
Are toilets available?
-
Are toilets usable and clean?
-
Is crib room available?
-
Are crib facilities clean?
-
Are fridges clean?
-
Are microwaves and warders clean?
-
Are refuse bins emptied regularly?
-
Are chairs and tables in good order?
-
Is potable water available?
-
Comments
First Aid
-
Are first aides clearly identified?
-
Are locations of FAK's identified?
-
Are FAKs checked regularly?
-
Are all first aid treatments reported and recorded?
-
Comments
Incident Reporting
-
Is there an incident reporting procedure?
-
Is this procedure understood by all?
-
Are all incidents investigated?
-
Are all incidents actioned and closed out?
-
Are incidents discussed with site personnel and subcontractors?
-
Are lessons learned included in SWMS?
-
Comments
Contractor Management
-
Is contractor equipment checked before being used on site?
-
Has contractor an approved SWMS in place?
-
Has contractor been made aware of site hazards and risks?
-
Is contractor only allowed on site when NG present ?
-
Is contractor onside when deliveries undertaken?
-
Does contractor attend pre-start and safety briefs?
-
Is contractor equipment maintained?
-
Is there evidence of maintenance?
-
Comments
Site Inspections
-
Does NG undertake regular formal site inspections?
-
Does NG undertake regular site audits?
-
Are inspection and audit action items closed out
-
Is there evidence of of audit/inspections close outs?
-
Do subcontractors undertake formal inspections and audits?
-
Is there evidence of subcontractor audits/inspections?
-
Comments
Environmental Impacts
-
Is spills procedure displayed?
-
Are all personnel aware of spill procedure?
-
Are spill kits available?
-
Have environmental inspections been done?
-
Is there a wash out bund in place?
-
Are drains and waterways protected from spillage?
-
Are environmental incidents reported?
-
Comments
Underground Services
-
Are all services identified on plans?
-
Are all new services identified on plans?
-
Are services isolated before excavation commences?
-
Comments
Access to Work Areas
-
Are access paths clearly identified?
-
Are no go areas flagged and signed?
-
Is access and egress clear of hazards and risks?
-
Is vehicular access clear?
-
Comments
Electrical
-
Are all electrical services identified?
-
Are power tools and leads tagged and tested?
-
Are power lines identified?
-
Are leads elevated?
-
Are generators positioned away from workers/windows?
-
Comments
Hot Work
-
Is HW Permit used for all hot work?
-
Is spotter used for all hot work?
-
Are flash arrestors fitted to Oxy sets?
-
Are gas hoses in good order?
-
Is there a fire extinguisher immediately available when HW undertaken?
-
Is client advised when HW taking place?
-
Comments
Noise Pollution
-
Are personnel aware of noise levels for equipment?
-
Is hearing protection available?
-
Is signage erected in noisy work areas?
-
Is noise controlled to working hours only?
-
Is consideration given to residents when noisy equipment used?
-
Comments
Dust
-
Are dust controls in place?
-
Is water cart available when required?
-
Are roads kept free of dust?
-
Comments
Scaffolding
-
Is scaffolding erected in compliance with Code of Practice
-
Are kick boards in place?
-
Are access points to scaffold secure?
-
Is scaff-tagg in place and signed off?
-
Warning signs/barriers for incomplete scaffolds?
-
Comments
Capping
-
Are reo starter bars capped?
-
Are star pickets capped?
-
Comments
Excavations
-
Do excavations meet NG and Code of Practice ?
-
Are excavations flagged/fenced?
-
Is there signage on deep excavations?
-
Are batters within requirements?
-
Is there a means of access and egress from excavations?
-
Is excavated material away from edge of cut?
-
Comments
Corrective Actions
-
HIGH RISK: Does hazard have the potential to kill, or permanently disable you? Action required Immeadiately
-
MEDIUM RISK: Does the hazard have the potential to cause serious injury which will temporarily disable you? To be actioned within 24 hours
-
LOW RISK: Does the hazard have the potential to cause a minor injury which would not disable you? To be actioned within 7 days
CAR 001
-
Corrective Action Required
-
Photographic evidence of CAR
-
Risk level
-
Actioned by:
-
Effectiveness of action:
-
Action completion sign off
-
Action completion date
CAR 002
-
Corrective Action Required
-
Photographic evidence of CAR
-
Risk level
-
Actioned by:
-
Effectiveness of action:
-
Action completion sign off
-
Action completion date
CAR 003
-
Corrective Action Required
-
Photographic evidence of CAR
-
Risk level
-
Actioned by:
-
Effectiveness of action:
-
Action completion sign off
-
Action completion date
CAR 004
-
Corrective Action Required
-
Photographic evidence of CAR
-
Risk level
-
Actioned by:
-
Effectiveness of action:
-
Action completion sign off
-
Action completion date
CAR 005
-
Corrective Action Required
-
Photographic evidence of CAR
-
Risk level
-
Actioned by:
-
Effectiveness of action:
-
Action completion sign off
-
Action completion date
CAR 006
-
Corrective Action Required
-
Photographic evidence of CAR
-
Risk level
-
Actioned by:
-
Effectiveness of action:
-
Action completion sign off
-
Action completion date
CAR 007
-
Corrective Action Required
-
Photographic evidence of CAR
-
Risk level
-
Actioned by:
-
Effectiveness of action:
-
Action completion sign off
-
Action completion date
Report Sign Off
-
Report writer signature
-
Date of Report
-
Report to be signed off by Senior Management and distributed to Site Team and OHS&E Deaprtment.