Title Page
-
Document No.
-
Conducted on
-
Prepared by
-
Location
Mobilization and Initial Work Design
-
Card in pouch and hazard board understood
-
Correct PPE worn for the situation and in good condition
-
Employee understands the task they have been given
-
Work order document on person
-
Correct functional location
Critical Control
-
Electrocution
-
For electrical work?
-
Has the installation been tested to AS3000?
-
Are barriers in place for exposed live electrical conductors?
-
Is test equipment and tools in good working order?
-
Was the isolation and proving process followed (including test before touch)?
-
Is insulating PPE is being worn for testing?
-
Are permit conditions and work instructions being adhered to?
-
Are controls in place for working in a lighting prone environment?
-
Is the correct supervision in place for apprentices and contractors?
-
Does the work team have the required qualifications?
-
For electrical appliances?
-
Have portable RCD devices been tested prior to use?
-
Are portable appliances tagged and in good order?
-
For arc welding?
-
Are arc welding machines fitted with Voltage Reduction Devices?
-
Is the return clamp adjacent to the activity?
-
Is the welding PPE dry?
Critical Control
-
Switchboard Explosion or Arc Flash
-
For Operator Switching?
-
Is CAT4 PPE being worn?
-
Is the correct remote racking device being used?
-
Does the work team have the required qualifications?
-
For Electrical work?
-
Is PPE being worn in accordance with the Arc Flash Dossier?
-
Is the correct isolation process being followed?
-
Are mitigating controls in place (Maintenance mode used)?
-
Are the correct testing for dead and earthing practices being followed?
-
Does the work team have the required qualifications?
Critical Control
-
Work at Heights & Dropped Objects
-
Are identified anchor points being used, 100% hookup, equipment fitted correctly, tagged and compliant to site standard.
-
Has a quality prestart been conducted on the EWP?
-
Dropped objects hazard is controlled; minimal risk of dropping objects below, or having objects dropped from other workgroups above.
-
Is the barricade and drop protection erected as per design?
-
Does the work group understand the no go zone?
-
Does the work team have the required qualifications?
Critical Control
-
Confined Space
-
Is a positive isolation in place to cover the work scope and all energy sources included?
-
Is there a safe atmosphere - Ventilation plan in place, current atmospheric test, no introduced hazards?
-
Stored energy managed, hangups, dropped object potential etc
-
Access points have hard barricading and signs, standby person to be used and conpetent
-
Does the work team have the required qualifications?
Critical Control
-
Lifting Operations
-
Is the lift being executed as per lift study design?
-
Is the crane in the designated location?
-
Is the landing area identified being used?
-
Has a quality prestart been conducted on the crane?
-
Is the rigging gear tagged and rated, and has it been inspected prior to use?
-
Does the work group understand the no go zone?
-
Is the barricade erected as per design?
-
Does the work team have the required qualifications?
Critical Control
-
Isolation of Hazardous Energy
-
Recipient has checked isolation points exist and are locked and check integrity
-
Equipment ID tag hung on correct equipment
-
Electricians are Isolation officer trained if doing isolations
-
WOLE: All conditions of WOLE are being met
Task Photo
-
Task Photo