Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Main framework in good order? (Check bridges, frame work, all supports, all nuts and bolts and roof)
-
Slide in good order (check surface, nuts and bolts and base)
-
Sub structure in good order (check pole, ramp, all framework, roof and nuts and bolts)
-
Smoking shelter and benches in good order?
-
Completed by?