Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Audit Details

  • Site/Job

  • Date & Time

1.0 PREVIOUS INSPECTION

  • 1.1 Has the last Inspection / Audit been reviewed?

  • 1.2 Are there any outstanding issues or actions from the last Audit

  • 1.3 What is the current area of works?

2.0 GENERAL HEALTH AND SAFETY

  • 2.1 Have operatives been signing in and out?

  • 2.2 Are all scaff tags in date and handover on site?

  • 2.3 Safety netting in date and handover on site?

  • 2.4 Are all groundworks safe and accessible?

  • 2.5 Is all equipment/mewps in good working order?

  • 2.6 How is working relationship with site agent, any issues to report?

3.0 SCOPE OF WORKS / SPECIFICATION / PROGRAM

  • 3.1 Are all works being installed to specification requirement's?

  • 3.2 Are all drawings on site , electronically and hard copies?

  • 3.3 Are there any new variations?

  • 3.4 Are there any issues on site that are effecting CRS program, either by us or others?

  • 3.5 Current program / dates?

  • 3.6 Estimated completion date?

  • 3.7 Are there any additional materials needed on site?

4.0 ITP - METAL STRUCTURAL DECK

  • 4.1 Is the steel correctly installed and suitable for CRS installation?

  • 4.2 Is the cladding installed to manufactures instructions?

  • 4.3 Are there any damaged pannels and by who?

  • 4.4 Have the decking sheet end laps achieved 50mm minimum bearing onto steel

  • 4.5 Is the fixing pattern being followed? 1 fixing into every pitch

  • 4.6 Are all stitchers in place to all laps were required?

  • 4.7 Are all cuts consistent and straight?

  • 4.8 Are the decking sheets perpendicular to structural steel beams?

5.0 ITP - Euroclad elite 5 build up

  • 5.1 Have the glavanised tophats been fixed with 4W rivets? 4no. per tophat

  • 5.2 Is there a consistent coverage on the acoustic insulation?

  • 5.3 Does the VCL layer have taped joints and is it free from tears or punctures?

  • 5.4 Have the eurobond brackets got the correct fixings installed to each opposite corner?

  • 5.5 Do the centres of the brackets not exceed 1200mm?

  • 5.6 Does the centres of the rails meet the maximum of 1800mm?

  • 5.7 Is the correct depth of insulation being met (300mm)

  • 5.8 Is the insulation consistent in coverage accross the roof area

  • 5.9 Have the closure flashings been installed at eaves level to prevent slippage of insulation?

6.0 ITP - Membrane coated valleys

Membrane valley check

  • 6.1 Is there consistent insulation packed beneath the valley liners ?

  • 6.2 Do the valley liners have fixings on the wings at 500mm ctrs ?

  • 6.3 Is there a 3mm gap joint between each end of gutter ?

  • 6.4 Are the weld straps installed without creases or over heating ?

  • 6.5 Have the laps of welds been probed ?

7.0 ITP - Euroclad elite 5 seam install

  • 7.1 Have the halters been installed to the rails at 402mm centres ?

  • 7.2 Do the halters align from ridge to eaves ?

  • 7.3 Have the seams been lifted correctly with a lifting beam and free of damage ?

  • 7.4 Are any loaded seams secured sufficiantly before installation ?

  • 7.5 Have the installed seams seated correctly over the halters ?

  • 7.6 Have the starter clips and retention bars been installed to secure the first seam correctly ?

  • 7.7 Are subsequent seams correctly lapped over the previous seam and halter ?

  • 7.8 Are all installed seams zipped together prior to the next seam being installed ?

  • 7.9 Are all perimeter profile fillers installed and sealed under the junction flashings ?

8.0 ITP - Flat roof Bauder install

  • 8.1 Are ALL rolls of felt and Insulation and general materials stored correctly?

  • 8.2 Primers applied correctly

  • 8.3 Underlays/vapour layers installed correctly?

  • 8.5 Is the Flat roof System being installed correctly with staggered laps and joints per layer?

  • 8.5 Are all up-stand details weathered and sealed correctly?

  • 8.6 Is the Deck in good condition and where applicable repaired/replaced correctly

  • 8.7 Are Rooflights sealed and weathered correctly? If applicable.

  • 8.8 Is the Flat Roof finished properly and so the job looks neat and "right"

  • 8.9 Is the Building Water tight - NO LEAKS?

6.0 ADDITIONAL NOTES / PICTURES

  • 6.1 Additional notes / pictures

7.0 SIGN OFF

  • 7.1 CRS Supervisor

  • 7.2 CRS Manager

  • 7.3 Site Manager

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.