Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
0.0 Audit details
-
0.1 Site/Job
-
0.2 Date & Time
1.0 PREVIOUS INSPECTION
-
1.1 Has the last Inspection / Audit been reviewed?
-
1.2 Are there any outstanding issues or actions from the last Audit
2.0 Scope of Works / Specification / Programme
-
2.1 Is the Scope of Works / Project Specification on Site
-
2.2 Are the operatives FULLY briefed and aware of the extent of the scope / spec of works?
-
2.3 Are the works being carried out / installed to the correct manufacturers Specifications?
-
2.4 Have operatives been made aware and clearly briefed of any client variations to the scope of works?
-
2.5 Have there been any "Client Site Based Instructions" relating to our scope of works?
-
2.6 Are there any site issues that are not related to us but will affect our works and programme?
-
2.7 Are ALL required CRS Drawings on site with the operatives and are they up to date/correct issue?
-
2.8 Where are the works in relation to the Programme?
-
2.9 What is the current Programme?
-
2.10 Are there any additional Materials required to be ordered so not to delay works?
3.0 General Works - ROOF SLATE & TILES
-
3.1 All coverings fixed in accordance with manufacturers recommendations?
-
3.2 Correct underlay/breather membrane used?
-
3.3 Correct batten sizes ans staggering of joints?
-
3.4 All Ridge, Verge, Eaves, Hips, Valleys, correctly installed and weather tight?
-
3.5 All Lead Work dressed in accordance with LSA guidlines including patination oil upon completion?
-
3.6 All joinery work set to a true line with recessed valley boards?
-
3.7 Roof Ventilation requirements in accordance with Project Spec / Scope allowing uninterrupted air flow
-
3.8 All Fascia, Soffit & Verges securely fixed and in a true line?
-
3.9 All Rain water goods installed to allow uninterrupted flow of water and left free and clean of debris?
-
3.10 Is the Building Water tight - NO LEAKS?
4.0 Sign off
-
Additional comments by Clients, managers & supervisors
-
Client/Site mangers name
-
Client/Site managers signature
-
CRS Site supervisors name
-
CRS Site supervisors signature
-
CRS managers name
-
CRS managers signature