Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Audit Details

  • Site/Job

  • Date & Time

1.0 PREVIOUS INSPECTION

  • 1.1 Has the last Inspection / Audit been reviewed?

  • 1.2 Are there any outstanding issues or actions from the last Audit

  • 1.3 What is the current area of works?

2.0 GENERAL HEALTH AND SAFETY

  • 2.1 Have operatives been signing in and out?

  • 2.2 Are all scaff tags in date and handover on site?

  • 2.3 Safety netting in date and handover on site?

  • 2.4 Are all groundworks safe and accessible?

  • 2.5 Is all equipment/mewps in good working order?

  • 2.6 How is working relationship with site agent, any issues to report?

3.0 SCOPE OF WORKS / SPECIFICATION / PROGRAMME

  • 3.1 Are all works being installed to specification requirement's?

  • 3.2 Are all drawings on site , electronically and hard copies?

  • 3.3 Are there any new variations?

  • 3.4 Are there any issues on site that are effecting CRS program, either by us or others?

  • 3.5 Are we on program?

  • 3.6 Estimated completion date?

  • 3.7 Are there any additional materials needed on site?

4.0 GENERAL WORKS - CLADDING

  • 4.1 Is the steel correctly installed and suitable for CRS cladding installation?

  • 4.2 Is the cladding installed to manufactures instruction's?

  • 4.3 Are there any damaged panels?

  • 4.4 Are the joints in the panels even and regular?

  • 4.5 Are all air seals in place were required?

  • 4.6 Are all flashings, ridges, verges, and eaves done correctly and properly weathered and sealed?

  • 4.7 Are all downpipes installed straight with correct amount of brackets and riveted?

  • 4.8 Is the cladding finished properly and so the job looks neat and right?

5.0 GENERAL WORKS - ROOF COVERINGS

  • 5.1 Is the steel correctly installed and suitable for CRS cladding installation?

  • 5.2 Is the cladding installed to manufactures instructions?

  • 5.3 Are there any damaged pannels?

  • 5.4 Are the joints in the panels even and regular?

  • 5.5 Are fixings evenly set out?

  • 5.6 Are all stitchers in place to all laps were required?

  • 5.7 Are all seals and tapes in place to sheet laps were required?

  • 5.8 Are all gutter welds and outlets welded and secure (probed)?

  • 5.9 Have the gutters been installed with the correct falls and all joints leak free?

6.0 ADDITIONAL NOTES / PICTURES

  • 6.1 Additional notes / pictures

7.0 SIGN OFF

  • 7.1 CRS Supervisor

  • 7.2 CRS Manager

  • 7.3 Site Manager

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.