Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Audit Details
-
Site/Job
-
Date & Time
1.0 PREVIOUS INSPECTION
-
1.1 Has the last Inspection / Audit been reviewed?
-
1.2 Are there any outstanding issues or actions from the last Audit
-
1.3 What is the current area of works?
2.0 GENERAL HEALTH AND SAFETY
-
2.1 Have operatives been signing in and out?
-
2.2 Are all scaff tags in date and handover on site?
-
2.3 Safety netting in date and handover on site?
-
2.4 Are all groundworks safe and accessible?
-
2.5 Is all equipment/mewps in good working order?
-
2.6 How is working relationship with site agent, any issues to report?
3.0 SCOPE OF WORKS / SPECIFICATION / PROGRAMME
-
3.1 Are all works being installed to specification requirement's?
-
3.2 Are all drawings on site , electronically and hard copies?
-
3.3 Are there any new variations?
-
3.4 Are there any issues on site that are effecting CRS program, either by us or others?
-
3.5 Are we on program?
-
3.6 Estimated completion date?
-
3.7 Are there any additional materials needed on site?
4.0 GENERAL WORKS - CLADDING
-
4.1 Is the steel correctly installed and suitable for CRS cladding installation?
-
4.2 Is the cladding installed to manufactures instruction's?
-
4.3 Are there any damaged panels?
-
4.4 Are the joints in the panels even and regular?
-
4.5 Are all air seals in place were required?
-
4.6 Are all flashings, ridges, verges, and eaves done correctly and properly weathered and sealed?
-
4.7 Are all downpipes installed straight with correct amount of brackets and riveted?
-
4.8 Is the cladding finished properly and so the job looks neat and right?
5.0 GENERAL WORKS - ROOF COVERINGS
-
5.1 Is the steel correctly installed and suitable for CRS cladding installation?
-
5.2 Is the cladding installed to manufactures instructions?
-
5.3 Are there any damaged pannels?
-
5.4 Are the joints in the panels even and regular?
-
5.5 Are fixings evenly set out?
-
5.6 Are all stitchers in place to all laps were required?
-
5.7 Are all seals and tapes in place to sheet laps were required?
-
5.8 Are all gutter welds and outlets welded and secure (probed)?
-
5.9 Have the gutters been installed with the correct falls and all joints leak free?
6.0 ADDITIONAL NOTES / PICTURES
-
6.1 Additional notes / pictures
7.0 SIGN OFF
-
7.1 CRS Supervisor
-
7.2 CRS Manager
-
7.3 Site Manager