Title Page
-
ACE Job No.
-
Conducted on
-
Prepared by
-
Location
-
Personnel Attending
AIMS (Ace IMS)
Information on display
-
Refer to the following Documentation and/or Standard Operating Procedures;
'Health Safety Policy', 'Fitness for Work Policy', 'Equality and Diversity Policy', 'Quality Policy', 'Environmental Policy' & 'Code of Conduct Policy'. -
Are the abovementioned company policy's current & on display?
-
'If you are injured at work' poster on display?
-
Are the RTW Coordinator's contact details correct & on display?
-
(SOP33EA) 'Important Return to Work Imformation' on display?
-
(SOP20A) Site environmental protection plan on display?
-
(SOP37A) Health and safety co-ordination plan on Display?
-
Project Risk Register on Display?
-
(SOP33A) Site emergency evacuation plan & assembly points on display?
-
(SOP33B) Site emergency contact numbers on display?
Administration
-
Refer to the following Documentation and/or Standard Operating Procedures;
-
(SOP09B) PMP (Project Management Plan) current & available onsite?
-
(SOP09) Roles & Responsibilities have been defined and understood?
-
TMP (Traffic Management Plan - incl. Traffic Guidence Scheme) approved & available onsite?
Submission, notification's & permits
-
Current 'Dial before you dig' current?
-
'Notice of intention to perform construction excavation work' current?
-
VicRoads MOA (Memorandum of Authorisation) current & valid?
-
(SOP17V) Confined space entry permit current & valid?
-
(SOP18M) Hot works permit current & valid?
-
(SOP18P) Demolition permit current & valid?
Subcontractor
-
(SOP14C) Subcontractor cababiliity assessement completed?
-
(SPO18K) Review of Subcontractor SWMS current & Valid?
-
(SOP18K1) Subcontractor SWMS field implentation review current?
Project specific requirements
-
Refer to the following Documentation and/or Standard Operating Procedures;
-
(SOP18I) All workers onsite have completed a project induction?
-
(SOP18H) Site induction register current?
-
(SOP18G1) All plant has been inducted onto the project?
-
(SOP18G) All plant has been inducted onto the project?
-
(SOP18G) All plant has been inducted onto the project?
Category
-
Refer to the following Documentation and/or Standard Operating Procedures;
-
Question?
-
Question?
-
Question?
-
Question?
-
Question?
-
Question?
Site Security, Access & Egress
Site Security, Access & Egress
-
Does this section relate to the project at the time of this Inspection?
-
Are fences in place and in good condition?
-
Ace's (Builders/construction) project information board located at the access gates and current?
-
Site signage appropriate placed and current to works being conducted?
-
Is the Emergency Evacuation Point/s identified, marked and signage installed if/when placed outside work zone boundary?
-
Access for Emergency services observed to be unobstructed when request to attend site?
-
Is there Fire Equipment located within the compound/site shed?
Trenching & Excavation
Trenching & Excavation
-
Does this section relate to the project at the time of this Inspection?
-
What is the purpose of the Excavation/Trench works onsite?
- Telecommunications
- Drainage
- Non Destructive Digging
- Electrical
- Gas
- Sewer
- Water
- Other
-
Have all underground services been located?
-
Is earth moving plant being used safely?
-
Are workers protected from trench collapse?
-
Are confined space precautions needed?
-
Are people safeguarded from falling into excavations (i.e. webbing/temp fencing barriers installed)?
-
Is there safe access to trenches and shafts?
-
Is someone else always present when a worker is below ground?
-
Is placement of excavated materials/spoil appropriate?
-
Is there any evidence of surface cracking?
-
Are walkways and bridges in good condition?
Everything
Information on display
-
Refer to the following Documentation and/or Standard Operating Procedures;
'Health Safety Policy', 'Fitness for Work Policy', 'Equality and Diversity Policy', 'Quality Policy', 'Environmental Policy' & 'Code of Conduct Policy'. -
Are the abovementioned company policy's current & on display?
-
'If you are injured at work' poster on display?
-
Are the RTW Coordinator's contact details correct & on display?
-
(SOP33EA) 'Important Return to Work Imformation' on display?
-
(SOP20A) Site environmental protection plan on display?
-
(SOP37A) Health and safety co-ordination plan on Display?
-
Project Risk Register on Display?
-
(SOP33A) Site emergency evacuation plan & assembly points on display?
-
(SOP33B) Site emergency contact numbers on display?
Administration
-
Refer to the following Documentation and/or Standard Operating Procedures;
-
(SOP09B) PMP (Project Management Plan) current & available onsite?
-
(SOP09) Roles & Responsibilities have been defined and understood?
-
TMP (Traffic Management Plan - incl. Traffic Guidence Scheme) approved & available onsite?
Submission, notification's & permits
-
Current 'Dial before you dig' current?
-
'Notice of intention to perform construction excavation work' current?
-
VicRoads MOA (Memorandum of Authorisation) current & valid?
-
(SOP17V) Confined space entry permit current & valid?
-
(SOP18M) Hot works permit current & valid?
-
(SOP18P) Demolition permit current & valid?
Subcontractor
-
(SOP14C) Subcontractor cababiliity assessement completed?
-
(SPO18K) Review of Subcontractor SWMS current & Valid?
-
(SOP18K1) Subcontractor SWMS field implentation review current?
Project specific requirements
-
Refer to the following Documentation and/or Standard Operating Procedures;
-
(SOP18I) All workers onsite have completed a project induction?
-
(SOP18H) Site induction register current?
-
(SOP18G1) All plant has been inducted onto the project?
-
(SOP18G) All plant has been inducted onto the project?
-
(SOP18G) All plant has been inducted onto the project?
Site Security, Access & Egress
-
Does this section relate to the project at the time of this Inspection?
-
Are fences in place and in good condition?
-
Ace's (Builders/construction) project information board located at the access gates and current?
-
Site signage appropriate placed and current to works being conducted?
-
Is the Emergency Evacuation Point/s identified, marked and signage installed if/when placed outside work zone boundary?
-
Access for Emergency services observed to be unobstructed when request to attend site?
-
Is there Fire Equipment located within the compound/site shed?
Trenching & Excavation
-
Does this section relate to the project at the time of this Inspection?
-
What is the purpose of the Excavation/Trench works onsite?
- Telecommunications
- Drainage
- Non Destructive Digging
- Electrical
- Gas
- Sewer
- Water
- Other
-
Have all underground services been located?
-
Is earth moving plant being used safely?
-
Are workers protected from trench collapse?
-
Are confined space precautions needed?
-
Are people safeguarded from falling into excavations (i.e. webbing/temp fencing barriers installed)?
-
Is there safe access to trenches and shafts?
-
Is someone else always present when a worker is below ground?
-
Is placement of excavated materials/spoil appropriate?
-
Is there any evidence of surface cracking?
-
Are walkways and bridges in good condition?
Plant
-
Does this section relate to the project at the time of this inspection?
Asset/Plant No.
-
Asset/Plant Image (for refernce only)
-
Asset/Plant Identification Number :
-
Plant Type?
- Excavator
- Backhoe/Loader
- Compactor
- Dozer
- Articulated/Dump Truck
- Grader
- Pad Foot Roller
- Water Cart
- Road Sweeper
- Scraper
- Posi Track/Skid Steer
- Elevated Work Platform
- Telescopic Handler
- Forklift
- Mobile Crane
-
Has operator correctly filled out & completed the daily pre-start?
-
Are the 'OEM (original equipment manufacturers) manual' available to operator/service person and in English?
-
Is the 'Plant Risk Assessment' available & current (no older than 2 years available on site)?
-
Are 'maintenance records' available & current (incl. Date/Hrs/Kms of last service)?
-
Have all and any previous faults with the plant or equipment all been repaired and signed off?
-
Is plant using incompatible or unsafe attachments?
-
Flashing lights/beacons & movement warning alarms (squawker/beeper) fitted to plant in good condition & functioning as designed?
-
Are 'ROPs (rollover protection structures)'/'FOPs (falling object protective structures)' provided on all mobile plant that require ROPs/FOPs?
-
Is fire extinguisher mounted in cab or externally & inspected within last 6 months?
-
Is the 'SWL (Safe Working Load)' of the plant clear & displayed?
-
Are 'seat belt/s' available for all plant in good condition & functioning as designed?
-
Other safety features operable? E.g. Emergency STOP, reversing camera or sensors?
Observation (i.e. hazards and/or faults, ) No.
-
Observation details:
SIgn Off
Inspection Sign Off
-
Refer to the following Documentation and/or Standard Operating Procedures
- SOP03 Management System
- SOP19 Quality Management
- SOP30 Communication & Consultation -
HSEQ Advisor
-
Project Manager
-
Site Manager
Other
-
Name & Sign
Template Section
Category
-
Refer to the following Documentation and/or Standard Operating Procedures;
-
Question?
-
Question?
-
Question?
-
Question?
-
Question?
-
Question?