0.0 Previous Audit

  • 0.1 Have all outstanding actions from previous audit been closed out?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 0.2 Have all corrective actions previously issued closed out?

  • Hazard Rating: Date hazard identified to be closed out / rectified by:

  • Date hazard identified to be closed out / rectified by:

1.0 Site

  • 1.1 Is site fully fenced to restrict unauthorised access?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 1.2 Is there safe access and egress to and from work areas, both under normal conditions and an emergency?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 1.3 Is signage displayed up to date? (builder contact details clearly visible from outside the workplace?) (PPE requirements for the site?) (The location of the site office?)

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 1.4 Are work areas kept clean, uncluttered and free of waste?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 1.5 Are there any trip hazards, including steps, potholes and uneven surfaces?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 1.6 Is the ground smooth, dry and free of debris?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 1.7 Are trenches covered or barricaded?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

2.0 Valeo Construction Site Facilities

  • 2.1 Does site have adequate amenities provided for all site personnel? (toilets, wash areas, lunch rooms, etc.)

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 2.2 Sanitary Facilities?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 2.3 First Aid Facilities?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 2.4 Sufficient drinking water available?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 2.5 Washing Facilities?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 2.6 Adequate dining facility?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 2.7 Are site sheds kept clean and free of tools and equipment?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 2.8 Adequate bins on site?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 2.9 Is there adequate to access/egress to sites a amenities?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

3.0 Emergency Response

  • 3.1 Have emergency plans been completed and displayed on site?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 3.2 Has site conducted training and rehearsal of emergency plans in the last 6 months?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 3.3 Does site have adequate first aid kits and equipment?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 3.4 Are all formally trained First Aiders accessible to all workers during all shifts?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 3.5 Unsuitable or inadequate communication in place?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

4.0 Personal Protective Equipment (PPE)

  • 4.1 Do all sites personnel have adequate PPE (including hard hats and safety vests)?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 4.2 Lack of system to issue, inspect, replace and monitor PPE?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 4.3 Lack of training in safe use, clean-up and inspection of PPE?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 4.4 Is PPE in accordance to contractors SWMS?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

5.0 Administrative Procedures

  • 5.1 Lack of/or inadequate Site Safety Plan?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 5.2 Failure to obtain permits (Council i.e. Work Zone/Construction Zone, EPA, Electrical , Confined Space etc)

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 5.3 Lack of, or inadequate, induction for workers, contractors, visitors?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 5.4 Lack or, or inadequate, supervisory arrangements?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 5.5 Lack of/or inadequate Safe Work Method Statements (SWMS) for high- risk work?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 5.6 Lack of, or inadequate system to review SWMS as needed?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 5.7 Lack of/or inadequate incident notification procedures?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 5.8 Lack of, or inadequate, routine inspections, monitoring, audits?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 5.9 Lack of/or inadequate consultative arrangements?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

6.0 Electrical Compliance.

  • 6.1 Access to power boards (secured at base)?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 6.2 Does Power Board meet Industry Standard?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 6.3 Unsafe electrical leads? (damaged, out of test date or untested)

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 6.4 Lack of RCD protection?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 6.5 Contact with overhead electrical lines?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 6.6 Leads placed on ground or metal structures?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 6.7 Electrical equipment near water?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 6.8 Are all RCD boards correctly and securely locked (as per industry standards)?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 6.9 Does site have sufficient lighting (including a battery back system) in place?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

7.0 Plant and Equipment

  • 7.1 Unsafe or damaged plant/equipment? (including missing or damaged guards)

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 7.2 Operator of plant/equipment has proof of competency?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 7.3 Lack of safe work instructions?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 7.4 Site has filled out and competed a Plant register form?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 7.5 Lack of inspection regime?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 7.6 Plant/Equipment daily log book/pre-start check, located and correctly filled in?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

8.0 Demolition

  • 8.1 Does Demolition contractor have adequate supervisory arrangements on site at all times?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 8.2 Building inspected for any hazardous materials ( Asbestos, lead, SMF, ect.)?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 8.3 Is there a demolition plan in place?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 8.4 Lack of/or inadequate, dust suppression system?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 8.5 All services identified (Electrical, Water, Gas, etc.)?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 8.6 - Is the general public protected from dust and debris?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 8.7 Is there any demolition of a structure or part of a structure that is load-bearing?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 8.8 Are all site personnel protected from falls?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 8.9 Demolition tools and equipment used in a safe manor and in accordance to SWMS's?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

9.0 Formwork

  • (Note: All Formwork must be compliant to AS-3610).

  • 9.1 Does formwork contractor have adequate supervisory arrangements on site at all times?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 9.2 Are designer/engineer drawings available on site?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 9.3 Has an engineer signed off on any alterations and/or modifications as compared to the original design?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 9.4 Is appropriate signage erected to restrict unauthorised entry?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 9.5 Are form workers properly trained to erect formwork using safe methods?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 9.6 Are braces installed and secured to prevent movement?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 9.7 Are bearers and joists in good condition?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 9.8 Is edge protection installed as soon as possible?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 9.9 Are designated access ways defined?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 9.10 Are any gaps in false decks wider than 250mm?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 9.11 Are work platforms at least 450mm wide?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 9.12 Are penetrations immediately covered, secured and marked?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 9.13 Has an engineer inspected, approved and signed off on the Formwork/false work immediately prior to the concrete pour commencing?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 9.14 Is access under Formwork physically prevented during pours, and restricted during erection and stripping?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

10.0 Working at Heights

  • 10.1 Fall risks of 2m or more? (including voids, pits, trenches and penetrations) ?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 10.2 Lack of or incomplete edge protection?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 10.3 Handrails and kick boards in place?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

11.0 Ladders

  • 11.1 Unsafe or damaged ladders?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 11.2 Unsafe positioning of ladders?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 11.3 Ladder not properly secured?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 11.4 Ladder unsuitable for job? (e.g. metal ladder used for electrical work)

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 11.5 A Frame ladders used on site?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

12.0 Lifting Equipment

  • 12.1 Loads lifted over persons, close proximity to obstacles incl. overhead power lines?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 12.2 Lack of maintenance, testing and inspection?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 12.3 Lack of SWL information displayed?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 12.4 Lack of daily inspection protocol?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 12.5 Unsafe or damaged plant?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 12.6 Unsafe or damaged lifting equipment, including ropes, slings, chains, hooks?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 12.7 Lifting equipment unlabelled, does not meet AS, no SWL displayed?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 12.8 Unlicensed operators?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 12.9 SWL of plant or any lifting equipment exceeded?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

13.0 Scaffolds

  • 13.1 Unlicensed persons erecting scaffold above 4m?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 13.2 Unsafe or incomplete scaffold?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 13.3 Lack of inspection protocol for scaffold?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 13.4 Incompatible scaffold components? Unlabelled or do not meet AS?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 13.5 Safe Work Load (SWL) exceeded? (tools, stored materials, number of persons)

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

14.0 Traffic Management

  • 14.1 Lack of, or inadequate, Traffic Management Plan (TMP) in place?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 14.2 Lack of training in TMP for all persons on site? <br>(contractors and visitors)

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 14.3 Inadequate controls for TMP? (physical barriers, bollards, speed limits, flashing lights, spotters, etc)

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

15.0. Environmental & Chemical Hazards.

  • 15.1 Are current MSDS's (material safety data sheets) for all hazardous materials/chemicals on site and easily accessible?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 15.2 Lack of emergency procedures for injury/spills/fire etc?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 15.3 Insufficient ventilation?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 15.4 Insufficient, and/or incorrect safety equipment/PPE?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 15.5 Are workers correctly supervised and trained in the handling of hazardous materials/chemicals?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 15.6 Lack of/or inadequate Environmental Management plan (EMP)?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

  • 15.7 Lack of/or inadequate, dust suppression system?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

Safety items to be addressed

  • Other Hazards

  • Hazards
  • Description of hazard?

  • Hazard Rating:

  • Date hazard identified to be closed out / rectified by:

Project Team Sign Off

  • Site Manager Sign off:

  • Project Manager Sign off:

Auditor Sign Off

  • Auditor's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.