Information
-
Universal Corporation Monthly HSEQ Inspection & Observation Audit Report
-
Site/Project
- Aldo Estate
- GlennCrest
- Harvest Home Road
- Ison Road
- Newbridge Estate
- Riverwalk Estate
- St Genevieve
- Woods Road
-
Conducted on
-
Site/Project Location
-
Site Manager
-
Leading Hand/Foreman
-
Prepared by
- Jackson Desira - HSEQ Officer
- Dain Howe - OH&S Officer
-
UCHSEQ Audit Report No.
1.0 Previous Audit
-
1.1. Have all outstanding actions from the previous audit been closed out?
2.0 Site Entry/Exit
-
Does this section relate to the project at the time of this audit?
-
2.1 Are fences in place and in good condition?
-
2.2 Is the Universal Corporation project information board installed and up to date?
-
2.3 Are site signage appropriate and in place?
-
2.4 Is the site shed identified/accessible and can visitors find it easily?
-
2.5 Is the Emergency Evacuation Point identified, marked and sign installed if placed outside the fence boundary?
-
2.6 Can Emergency Services access the site if required?
-
2.7 Are the Universal's policies listed?
-
2.8 Is there Fire Equipment located within the compound/site shed?
3.0 Site Amenities / Facilities
-
Does this section relate to the project at the time of this audit?
3.0 Site Amenities / Facilities
3.1 Lunch Room / Kitchen Facilities
-
3.1.a. Is the lunchroom clean and in good condition?
-
3.1.b. Has the lunchroom RCD Box been tagged within the last month?
3.2 Toilets / Bathroom Facilities
-
3.2.a. Are the toilets clean and in good condition?
-
3.2.b. Are there adequate supplies available?
3.3 First Aid Facilities
-
3.3.a. Is there a First Aid kit in place?
-
3.3.b. Are the First Aid items regularly checked and restocked?
-
3.3.c. Are the contact details for the First Aider/s on or near the kit?
-
3.3.d. Is there clean running water available?
4.0 Administration
-
Does this section relate to the project at the time of this audit?
-
4.1. All permits (i.e. council, Work Zone/Construction Zone, EPA, Electrical, Confined Space etc) have been obtained and approved for use?
-
4.2. Is the 'If your're injured' poster on display with the correct contact details?
-
4.3. Are Evacuation Plans displayed?
-
4.4 HSEQ Site Folders are in place, set up correctly and being used?
-
4.5. Have Induction Forms been completed for all persons signed in on day of audit?
-
4.6. Adequate supervisory arrangements in place?
-
4.7. Safe Work Method Statements (SWMS) for high- risk work submitted and reviewed?
-
4.8 Are SWMS specific to the task (not generic)?
5.0 Trenching & Excavation
-
Does this section relate to the project at the time of this audit?
-
What is the purpose of the Excavation/Trench works onsite?
- Drainage
- Electrical
- Gas
- Sewer
- Water
- Other
-
5.1. Have all underground services been located?
-
5.2. Is earth moving plant being used safely?
-
5.3. Are workers protected from trench collapse?
-
5.4. Are confined space precautions needed?
-
5.6. Are people safeguarded from falling into excavations (i.e. webbing/temp fencing barriers installed)?
-
5.7. Is there safe access to trenches and shafts?
-
5.8. Is someone else always present when a worker is below ground?
-
5.9. Is placement of excavated materials/spoil appropriate?
-
5.10. Is there any evidence of surface cracking?
-
5.11. Are walkways and bridges in good condition?
6.0 Plant and Equipment
-
Does this section relate to the project at the time of this audit?
Inspected Plant #
-
UC - Plant Identification Number:
-
Plant Type?
- Excavator
- Backhoe
- Compactor
- Dozer
- Articulated/Dump Truck
- Grader
- Loader
- Pad Foot Roller
-
6.1. Has operator correctly filled out & completed the Daily Pre-Start Logbook?
-
6.2. Are 'Owner/Operator Manual' located with plant?
-
6.3. Is the 'Plant Risk Assessment' available & up to date ?
-
6.4. Are 'maintenance records' available & up to date?
-
6.5. Are any incompatible attachments being used with the plant/equipment?
-
6.6. Does the operator have a copy of the SWMS?
-
6.7. Operated by trained/licensed person appropriate for that plant?
-
6.8. Equipment regularly inspected and maintained?
-
6.10. Are clear work areas/exclusion zones defined?
-
6.11. Is a flashing beacon fitted to plant in good condition & functioning as designed?
-
6.12. Is squawker/beeper fitted to plant functioning as designed?
-
6.13. Cabin in good & clean condition?
-
6.14. Plant 'Safe Working Load' (SWL) displayed?
Observation (i.e. hazards and/or faults, ) No.
-
Observation details:
7.0 Electrical Hazards
-
Does this section relate to the project at the time of this audit?
-
7.1. Are electrical tools and extension leads in good condition and compliant? (damaged, out of test date or untested)
-
7.2. Are the RCD's correctly secured and locked?
-
7.3. Contact with underground assets?
-
7.4. Contact with overhead electrical lines?
-
7.5. Overloading outlets?
-
7.6. Leads placed on ground or touching metal?
-
7.7. Electrical equipment near water?
-
7.8. Electrical equipment near flammables?
-
7.9. Electrical equipment near chemicals that could cause damage?
-
7.10. Electrical leads that may be damaged from contact with moving machinery parts?
8.0 Cranes / Lifting Equipment
-
Does this section relate to the project at the time of this audit?
-
8.1. Has the plant been checked to ensure it is not unsafe or damaged?
-
8.2. Are loads lifted over persons, close proximity to obstacles incl. overhead power lines?
-
8.3. Is the lifting equipment in good condition?
-
8.4. Is the SWL information displayed?
-
8.5. Is there a daily inspection protocol?
-
8.6. Have ropes, slings, chains & hooks been checked to ensure they are in good condition?
-
8.7. Lifting equipment labelled?
9.0 Harness and Equipment
-
Does this section relate to the project at the time of this audit?
-
9.1. Unsafe or damaged harness or equipment?
-
9.2. Incompatible hooks/equipment?
-
9.3. Unlabelled or does not meet AS?
-
9.4. Unsafe or uncertified anchor points?
-
9.5. Lack of inspection protocol for equipment?
-
9.6. Lack of or inadequate formal training for operators?
10.0 Work Environment & Housekeeping
-
Does this section relate to the project at the time of this audit?
-
10.1. Adequate amenities for the amount of workers on site?
-
10.2. is there clear access throughout the project?
-
10.3. Is the ground stable and at a condition where it will not present a hazard for anyone working on site?
-
10.4. Slip/trips hazards addressed?
-
10.5. Sharp edges capped?
-
10.6. Is rubbish/debris being removed frequently?
-
10.7. Trenches and pits are barricaded/shored/battered?
-
10.8. Is rubbish being stockpiled and not interfering with access?<br>
11.0 Hazardous Manual Handling
-
Does this section relate to the project at the time of this audit?
-
12.1. Has hazardous manual handling tasks been identified?
-
12.2. Has the manual tasks been assessed?
-
12.3. Risk controls in place (examples: job rotation, lighter loads, trolleys, lifting equipment, etc)?
-
12.4. Have workers been trained in risk controls and safe lifting/ team lifting techniques?
12.0 Hazardous Chemicals / Dangerous Goods
-
Does this section relate to the project at the time of this audit?
-
12.1. Safe storage location (e.g. flammables not near ignition sources, spills entering stormwater drains, etc)?
-
12.2. Incompatible chemicals not stored near each other?
-
12.3. Is spill containment equipment required for the chemicals present on site?
-
Is the spill containment equipment on site?
-
12.4. MSDS's available on site?
-
12.5. Emergency procedures for injury/spills/fire etc?
-
12.6. Excessive quantities stored on site or in vehicles?
-
12.7. Is there sufficient ventilation?
-
12.8. Is the correct type of PPE available for the types of chemicals stored on site?
-
12.9. Suitable storage containers (unlabeled or stored in food containers)?
13.0 Emergency Response
-
Does this section relate to the project at the time of this audit?
-
13.1. Is there an emergency plan or procedure for the site?
-
13.2. Evacuation Point is communicated during the induction?
-
13.3. Emergency wardens identified and introduced to all personnel?
-
13.4. Communication equipment working?
-
13.5. Emergency Numbers are displayed in prominent positions?
14.0 Traffic Management
-
Does this section relate to the project at the time of this audit?
-
14.1. Traffic Management Plan (TMP's) in place?
-
14.2. TMP's communicated to all persons on site (contractors and visitors)?
-
14.3. TMP's controls in place (physical barriers, bollards, speed limits, flashing lights, spotters, etc)?
15.0 Personal Protective Equipment (PPE)
-
Does this section relate to the project at the time of this audit?
-
Are all workers wearing the Following;
-
15.1. High Visibility Tops?
-
15.2. Safety Boots?
-
15.3. Hearing Protection when excessive or prolonged noise is generated?
-
15.4. Dust Masks when hazardous cutting is being undertaken?
-
15.5. Eye protection when there is a chance of foreign bodies entering the eyes?
-
15.6. Is UV protection required?
-
Is UV protection being used either by sunscreen or by protective clothing?
-
15.7. Hard hats are worn?
16.0 Environmental Hazards
-
Does this section relate to the project at the time of this audit?
-
16.1. Is there an Environmental Management plan (EMP)?
-
16.2. Adequate, dust suppression system?
-
16.3. Adequate systems to prevent contaminants entering storm-water drains?
-
16.4. Are there emergency procedures for injury/spills/fire etc?
-
16.5. Insufficient ventilation?
-
16.6. Are current MSDS's (material safety data sheets) for all hazardous materials/chemicals on site and easily accessible?
-
16.7. Insufficient, and/or incorrect safety equipment/PPE?
-
16.8. Are workers correctly supervised and trained in the handling of hazardous materials/chemicals?
17.0 Other safety items identified and/or to be addressed.
-
17.1. Are there any other safety items that need to be addressed which have not been identified in the audit?
-
Please list other safety items required to be addressed.
Further Observations, Notes & Comments:
-
Auditors notes / comments
18.0 Complete & Signed Audit
18.1. Project Team Sign Off
-
Site Supervisor/HSR
18.2. Auditor Sign Off
-
Auditor