Title Page

  • Document No. WT/002(S.I.R.)

  • Site Inspection Name & Address

  • Client

  • Report Date

  • Carried out by

In Build Site Quality Check List

  • 1). Have actions been completed from last visit?

  • Type of installation:-

  • Wiring types used:-

  • If wiring type is 'Other' please list

Containment:

  • Correctly installed

  • Adequate for installation?

  • Lids, lock rings etc. Ok?

  • Sharp edges/extra added protection?

  • All swarm and debris removed?

  • Fire rated/metal cable ties used on cable ties?

  • Fire Stop?

  • Bonded as necessary?

  • Add 'Good Example' photo(s)

Back boxes:

  • Correct type used?

  • Fixings adequate (level)?

  • Installed in permitted zone?

  • Cable entry hole(s) protected?

  • Add 'Good Example' photo(s)

Cabling:

  • Correct cable used for the installation?

  • Cable support correct?

  • Correct cable segregation?

  • Cable routing?

  • Mechanical protection installed as required?

  • Fire rated cable supports?

  • Add 'Good Example' photo(s)

Earthing & Bonding:

  • Correctly installed?

  • Cabling adequately sized?

  • Cables correctly labelled?

  • M.E.T. / Test link present?

  • Supplementary Bonding?

  • Add 'Good Example' photo(s)

Distrbution Boards/Panels:

  • Adequate for installation?

  • Fixings adequate?

  • Location adequate?

  • Accessibility?

  • Cable entry glanced/hole(s) protected?

  • Temporary distribution board chart?

  • CPD's correct and RCD afforded?

  • Conductors sleeved & colour identified?

  • Conductor circuit identification in place?

  • Required distribution board labelling in place?

  • Polarity and Phase sequencing correct?

  • Safe isolation in place?

  • Completed circuit chart present?

  • Correctly terminated/No copper visible?

  • Add 'Good Example' photo(s)

Face Plates:

  • Secured and level?

  • Fixing adequate?

  • Correct type used?

  • Wires sleeved where applicable?

  • Correctly terminated/no copper visible at terminals?

  • Wires terminated in correct terminals?

  • Labelled where applicable?

  • Add 'Good Example' photo(s)

Lighting:

  • Lamps fitted and checked?

  • Diffusers fitted & checked?

  • Correct switching locations?

  • Downlights inspected?

  • Adequate fireguard of downlights?

  • Add 'Good Example' photo(s)

Emergency & Exit lighting:

  • Lamps fitted and checked?

  • Diffusers fitted and checked?

  • Installed in appropriate locations?

  • Testing facilities installed and labelled?

  • Identification numbers on luminaries?

  • Add 'Good Example' photo(s)

Fire Alarm:

  • Fixings adequate on cable runs?

  • Fire alarms interlinked?

  • Domestic: alarms installed due to Part P?

  • Add 'Good Example' photo(s)

Site Health & Safety Folder:

  • Relevant sections are present and filled in?

  • Installation test sheets present and up to date?

  • Safe isolation - 'Request for isolations' completed?

  • Safe isolation - 'Request for power' completed?

  • Any other Comments:

  • Inspector Signature:

  • Contract Managers Signature:

  • Site Managers Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.