Title Page

  • Report Number

  • Project Name

  • Location
  • Conducted on

  • Conducted by

  • Main Contractor Company

  • Main Contractor Representative

  • Waterproofing Installer

  • Installer Representative

Introduction

  • The purpose of the site visit is to;

  • Observation and Discussion

Areas

    Observation Area
  • Area Type

  • Area Location

  • Substrate

  • Substrate Preparation

  • Primer

  • Membrane/Coating

  • Topcoat (if required)

  • Accessories (if required)

  • Finish Surfacing Type

  • Observations

  • Action Required?

  • Photo Evidence

Completion

  • Completed By

  • Position

  • Contact Number

  • Contact Email

  • Local GCP Address

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.