Title Page

  • Engineers name

  • Client Ref:

undefined

  • Building

  • Date of Inspection

  • Location

  • PPM / Survey / RA

Pre inspection checklist

  • Asbestos register checked

  • Building pre dates year 2000?

  • Evidence of Rodents / Pigeon droppings?

Confined space?

  • Permit to work required?

  • Confined space permit agreed with client?

  • Confined space training up to date for persons involved in task?

  • Rescue team required for confined space?

  • RPE / ESCAPE SET / O2 DETECTION/TRIPOD REQUIRED?

  • CoSHH Data available- If required?

  • Up to date LRA Available for site / system(s)?

  • Spill kit available if chemicals in use?

  • Appropriate PPE in use for task?

  • Eye wash available?

  • RAMS available / accessible by Client & Operative?

  • First aid available?

  • Lighting adequate?

  • 220-240 VAC power available / distance from tank?

  • Boarding around tank adequate / stable for safe access?

  • Tank situated on load bearing wall / solid firm base throughout?

  • Lone working risk?

  • Loft boarding fitted and adequate - Loft space / WAH?

  • Working at Height required? (WAH)

  • WAH to be completed safely via approved access equipment?

  • Two persons required for task?

  • Valves locked out / tagged out before access by personell?

Tank externals

  • Tank material of construction?

  • Tank size - M3 / LXWXH (Metres)

  • Picture of the tank external

  • Tank linked?

  • Drain off / drain cock at tank base / size (mm)?

  • Dead leg pipework evident? Size,material, length, location, photo ?

  • Tanks linked in parallel fashion?

  • Tightly fitted lid at tank?

  • Size/shape required

  • Distance to drain / External ground (M)

  • Ambient room temp °C ?

  • Ventilation / air changes appear adequate?

  • Ingress / Egress sufficient or >350mm @ hatch?

  • Inlet size?

  • Inlet material?

  • Inlet opposite Outlet(s)?

  • Tank isolation in place and working at inlet & outlet?

  • Screened Breather fitted on lid in good order / clean?

  • Size of breather / connection to tank?

  • Warning pipe fitted (>1M3) ?

  • Warning pipe material & size?

  • Warning pipe in good condition / run to drain?

  • Warning pipe insect screen in good condition?

  • Overflow air gap at supply correct / connection above warning pipe (>1M3 CWST)

  • Overflow material / size?

  • Overflow/ warning pipe terminates to prominent position?

  • Overflow / rodent screen in good condition?

  • Insulation type?

  • Insulation thickness (mm)?

  • Outlet size?

  • Outlet material?

  • Outlet connection size / flange type?

  • Number of outlets connected to CWST?

  • Boosted outlet(s)? Type / serial No. Of equipment?

  • Open vent termination above tank?

  • Open vent with clearance per BS6700/BS8558?

  • Open vent discharging?

  • Open vent pipework size?

  • Open vent insulated?

  • Open vent grommet fitted at seal to tank lid?

  • Open vent re - route to external via tundish / hopper preferable?

Internal checks

  • Sediment within tank?

  • Scale within tank?

  • Mould evident within tank / tank walls or under lid ?

  • Tank float operated valve in good working order?

  • Float type? e.g: Keraflow, Portsmouth pattern etc..

  • Float diameter / size (mm)?

  • Tank inlet temperature °C

  • Tank stored temperature @ outlet side °C (<2°C differential from inlet required)

  • Evidence of stagnation / biofilm within tank?

Recommendations

  • Recommendations

  • Recommendations #2

Sign Off

Engineer sign off

  • Engineers name

  • Engineers signature

Supervisor sign off

  • Supervisors name

  • Supervisors signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.