Title Page
-
Date and time
-
Prepared by
-
Shift
EMBA Daily cleans
-
Please ensure that all daily cleaning tasks are completed thoroughly using the pictures provided as the standard required. Take a picture after each cleaning task is finished. If you are unable to complete any of the cleaning tasks, please provide a reason for the omission. Any additional observations or issues discovered should be documented in the final section with detailed information and, if possible, accompanying pictures.
Slotting Section.
-
Slotting section blown down, all shafts and lead screws lubricated with Rocol dry PFT or equivalent
-
Why?
Feed Section
-
Clean feed section
-
Why?
Glue System and folding section.
-
Clean glue head, nozzle, drip tray, UV light and refill bath with warm water, sweep folding section.
-
Why?
Counter Ejector.
-
Blow down inside counter ejector and sweep floor area
-
Why?
Lay boy belts and doubler
-
Clean under doubler and lay boy belt section, remove any lose tape.
-
Why?
Additional information
-
Any additional observations or issues found during your cleans? provide details.