Information
-
Document No.
-
Crane Permit
-
Client / Site
Identification
-
Project Name
-
Location
-
Date and time
-
Controlling Contractor
-
Subconcractor
-
Crane Contractor
Attachments
-
Are the Crane Operators certifications on site and up to date?
-
Are the Signal Persons certifications on site and up to date?
-
Is there a Qualified Rigger on site.?
-
Is a copy of the Hand Signal Charts on site?
Pre-Lift Checklist
-
Have the weather conditions been considered?
-
Have the general safety precautions been reviewed?
-
Has the stability of the ground been assured?
-
Has all rigging equipment been inspected?
-
Is swing rotation open and barricaded?
-
Are outriggers fully extended?
-
Is a tag line going to be used?
-
What is the reason for no tag line?
-
Are crane inspection records on site?
-
Will any section of the crane operation or lift structure be within 20 feet of a power line?
-
Do not proceed with lifting operations. Contact Henry Bros. Co. Safety representative.
Approvals (Signature Required)
-
By signing below you acknowledge this as a Pre-Lift Meeting and give approval for the lift to proceed.
-
HBC Superintendent
-
Contractor Lift Supervisor
-
Crane Operator
Additional Information
-
Notes
-
Progress Photos