Title Page

  • Conducted on

  • Shift

  • Prepared by

  • Client

  • Principal Contractor

  • Location
  • Inspection Type

  • Byrne Consultants Job Number & Project Name

  • QA Version Control - Version 1 - April 19

WEATHER

  • Weather Conditions

  • Temperature

  • Wind

  • Rainfall in mm

  • Time lost to weather

  • Details/ Area of Works/ QA Lot Number

EOT's and VARIATION's

  • Time lost to variations

  • Details/ Area of Works/ QA Lot Number

DISCUSSIONS

  • Discussions

  • Discussion Type

  • Who is the discussion with?

  • Details of discussion

GENERAL WORKS OBSERVED

    CLEARING AND GRUBBING
  • Clearing and Grubbing being done.

  • Lot Number

  • EARTHWORKS
  • Earthworks in cut

  • Lot Number

  • Testing required

  • Earthworks in fill

  • Lot Number

  • Fill type

  • Testing required

  • SUBGRADE
  • Subgrade

  • Lot Number

  • Material Used

  • Testing required

  • Unsuitable Replacement

  • Lot Number

  • Material used

  • Testing required

  • SUBBASE
  • Subbase

  • Lot Number

  • Material Used

  • Testing required

  • BASECOURSE
  • Basecourse

  • Lot Number

  • Material used

  • Testing required

  • REWORKS
  • Reworks

  • Lot Number

  • Reworks Type

  • WEARING COURSE
  • Prime

  • Lot Number

  • Testing required

  • Seal

  • Lot Number

  • Testing required

  • Asphalt

  • Lot Number

  • Testing required

  • CONCRETE WORKS
  • Concrete works

  • Concrete works type

  • Lot Number

  • Testing required

  • SEWER
  • Sewer works

  • Sewer works type

  • Lot Number

  • Testing required

  • STORMWATER
  • Stormwater works

  • Stormwater work type

  • Lot Number

  • Testing Required

  • WATER
  • Water works

  • Water works type

  • Lot Number

  • Testing required

  • ELECTRICAL
  • Electrical works

  • Electrical works type

  • Lot Number

  • Testing required

  • COMMUNICATIONS
  • Communication works

  • Communication works type

  • LANDSCAPING
  • Landscaping works

  • Landscaping works type

PLANT ON SITE

  • Vac Truck

  • Quantity

  • Excavator

  • Size - Quantity

  • Grader

  • Size - Quantity

  • Roller

  • Type - Quantity

  • Compactor 815

  • Size - Quantity

  • Dozer

  • Size - Quantity

  • Water Truck

  • Type - Quantity

  • Tipper

  • Type - Quantity

  • Loader

  • Quantity

  • Backhoe

  • Quantity

  • Bomag

  • Quantity

  • Profiler

  • Quantity

  • Bobcat

  • Quantity

  • Trencher

  • Quantity

  • Scraper

  • Size & Quantity

  • Crane

  • Type, Size & Quantity

APPRENTICES / TRAINEES ON SITE

  • Quantity

  • Company

  • Role /Task

INDIGENOUS EMPLOYEES ON SITE

  • Quantity

  • Company

  • Role / Task

VISITORS ON SITE

  • Quantity

  • Company

LABOUR / SUPERVISION ON SITE

  • Engineer

  • Supervisor

  • Leading Hand

  • Operator

  • Labourer

  • Concretor

  • Subcontractors Onsite

TRAFFIC MANAGEMENT

  • Traffic Management Required

  • Traffic Management Photos.

  • Comments

ENVIRONMENTAL

  • Environmental concerns

  • Details

  • Photos

SAFETY

  • Safety Concerns

  • Details

  • Photos

GENERAL

  • General Comments

  • General Daily Site Photos

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.