Title Page

  • Site conducted

  • Client

  • Conducted on (Date and Time)

  • Job no.

  • Employee (Full Name)

  • Site Address
  • Job Details

Job sheet

  • Description of works carried out

  • Picture Of Installation

  • Picture of wiring connections, & Data connection including CT's

  • isolator

  • Inverter

  • Car Charger

  • Batteries

  • Immersion controller

  • AC connection point

  • all data labels and meter number and dongle numbers

  • Item
  • Material missing

  • Quantity

Job Completion

  • Installation complete

  • works required to complete if required

  • Timescale of required time on site to complete task

Completed documentation

  • Electrical Installation Certificate EIC if requred

  • PV Sheets

  • Battery commissioning sheet

  • Pictures of product data sheets is inverter serial numbers, meter serial numbers, battery Serial numbers

  • picture of meter seal

  • Sent to Electrical Operations

  • Date sent

Job Personnel

  • Main electrician

  • Assisting personnel

  • Job sign off

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.