Information
-
Paint Shop
-
Maintenance Department (Paint Shop)
-
Daily Log Book
-
Equipment: All Paint shop
-
INSTRUCTIONS : In case of any abnormality Immediately contact with Line maintenance Team Leader / Group Leader
-
MONTH :
Weather
-
Temperature
-
Precipitation
- Dry
- Rain
- Cloudy
On Site
-
Superintendent on Site?
-
Present Member
- M.ZIA
- Zaheer
- M.Usman
- M.Bilal
- Wajid
-
Power OFF Time(Minutes)
-
Time In Minutes
-
Number Of Power Jerk
-
Today Plan Activites
-
Detail
Production
-
Production Status
-
Line In Body
-
Line Off Body
-
Total Down Time
-
Down Time ON line
-
Reason
Daily Inspections
-
Number OF Daily Rounds
-
Reason
-
Take PT Line Daily Round
-
Take ED Line Daily Round
-
Take UF System Daily Round
-
Take DI System Daily Round
-
Take ED Oven Daily Round
-
Take Sealer Line Daily Round
-
Take UBS Oven Daily Round
-
Take Conveyor System Daily Round
-
Take ASU System Daily Round
-
Take Mixing Room Daily Round
-
Take Primer Oven Daily Round
Visitors
-
Any visitors to the site
Preventive Maintenance
-
Today PM Complete
-
PM Plan
-
Why No Reason
-
PM Plan
-
Actually PM
-
Any Abnormality
-
Detail
Conducted By
-
Name