Title Page
-
Date:
-
Project:
-
Client / Site
-
Location
-
Prepared by
-
Personnel
-
First Aider/s:
-
Emergency Evacuation Point:
-
Nearest Medical Facility / Hospital:
-
Emergency Equipment Location:
PPE
-
Site Specific Personal Protective Equipment (PPE) Required
- Hard Hat
- Hearing Protection
- Gloves
- Steel cap boots
- Hi--Vis vest
- Safety Glasses
- Respiratory aid
- Full Length shirts/pants
-
Additional PPE:
Permits and Plant Equipment
Permits and Plans
-
Confined Space Entry
-
Working at Height
-
Excavation and Drill
-
Isolation
-
Hot Work
-
Environmental / Land Access
-
Workbox
-
Other:
Plant and Equipment
-
Pre-start inspection completed on plant?
-
Lifting gear inspected and tagged?
-
Electrical gear tested and tagged?
-
Plant risk assessed, inducted, and accepted?
-
Climbing equipment (including ladders) inspected?
-
Fall arrest equipment inspected?
-
Safety detection (E.G Radman) equipment operational/calibrated?
-
Other:
-
Other:
Tasks
What are the tasks we are doing today?
-
1.
-
2.
-
3.
-
4.
-
5.
Hazards
-
Add a Hazards
-
What are the key risk controls to be implemented?
-
What are the key hazards?
-
Who is responsible?
-
Critical Risk?
-
Note SHEWMS reference no.
Additional considerations
-
Are there any other factors that can affect your work area (i.e. other work crews)? [Note Below]
Please list:
Competencies
Competencies required to complete task (including verification of competency)
-
Add Competencies
-
Name:
-
Competency:
-
Ticket number:
-
VOC Required?
-
Upload evidence
Discussion
-
Are there any incidents, injury concerns, hazard alerts, SHEQ alerts, directives, positive events/news, etc. that require discussing?
Add comment
Specific Topics/issues raised:
-
Add topic/issue:
-
Topic / Issue:
-
Comment or Action:
Emergency Plans:
-
Emergency response plans communicated and well understood by all workers onsite?
Induction / Onboarding / Training / Competency:
-
All workers have been on-boarded/inducted appropriately and are trained and competent to complete all tasks?
Changes to design/plans:
-
Have changes to approved design / construction plans been assessed for risk and communicated to workers?
Weather forecast:
-
Morning:
-
Afternoon:
Pre-start Sign on
Pre-start Sign on
-
I, the undersigned, hereby certify that I have been inducted to this job site by Visionstream or Site Supervisor, and that I have actively participated in the identification of hazards, assessment and control of risks associated with working at this location by way of this pre-start briefing. I agree to implement the control measures identified, including the use of the appropriate PPE:
Add person:
-
Name and Signature:
-
Company:
-
Phone number:
-
Start:
-
Finish:
Authorising signature
-
I certify that this form was completed prior to commencing work on this site, and that all workers and visitors have been inducted to site:
-
Name and signature:
-
Position:
-
Date: