Title Page

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Weather

  • Temperature

  • Wind speed

  • Percipitation

General Details and notes:

  • Daily Activity

Brackin

  • Braken Excavating on site?

  • Manpower

  • Are there any delaying factors?

  • Daily dig permit filled out?

Braken 1st work Inspection:

  • Braken 1st Work Inspection today?

  • Locates have been completed

  • Team Services have reviewed soils

  • Determined process for bridge demolition

  • Properly benched or sloped excavations

  • Is proper rigging in place for re-bar install at C-line footing install

Weitz footing's

  • On site today

  • Manpower

  • Are there any delaying factors?

  • Daily dig permit filled out?

Weitz footings quality check

  • Quality check today?

  • Verify that testing lab has checked bearing at bottom of footing and signed off above.

  • Verify that all excavations are free of mud and standing water.

  • Verify that corners of excavations are square and clean for neat pours.

  • Check reinforcing clearances at sides and bottom of footings.

  • Verify all reinforcing dowels in place and aligned with wall/slab layout.

  • Embeds required-verify that proper type is installed in each location.

  • Check embed locations and verify correct.

  • Verify that non-symmetrical bolt patterns are oriented properly.

  • Is water stop in proper place.

  • Using the proper anchor bolts.

  • Check top of footing and verify that they are level and at correct elevation.

  • Are sleeves installed for future use.

  • Is perimeter insulation installed properly at footings/foundation.

  • Are footing steps properly formed and braced.

  • Rebar inspections signed off on.

  • Concrete deliveries and inspections properly documented and scheduled.

  • Pictures have been taken of reinforcing and embeds.

Weitz concrete walls

  • On site today

  • Manpower

  • Are there any delaying factors?

Weitz concrete wall quality check.

  • Quality check today?

  • Verify proper concrete mix, slump, air entrainment, and admixtures for pour.

  • Verify that forms are cleaned and oiled and cavity is clean.

  • Make sure all reinforcing is in place and proper clearance from for work is checked.

  • Verify all block-outs and sleeves are in place and in proper location. Set prior to rebar installation.

  • Are all blackouts braced properly.

  • Chamfer placed at corners and around openings if required.

  • Verify all brick ledge elevations and shapes if used.

  • Embeds, weld plates, edge angles, mechanical sleeves, drain tile sleeves, conduits all in place and secured properly.

  • Anchor bolts placed in wall-double check location, pattern orientation, and projection.

  • Water stop and key ways in place at footings and bulkheads as required.

  • Bulkheads braced adequately.

  • Verify that formwork is constructed per design with correct placement of ties, stiff backs, whalers, and bracing as required. Verify plumb, aligned.

  • Pour watch individual assigned to pours.

  • Check to see if pour rate in vertical feet per hour is done correctly.

  • Pictures have been taken of reinforcing and embeds.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.