Information

  • Davco Electric Daily Safety Inspection Report

  • Client / Site

  • Location
  • Date/ Time:

Disclaimer The safety assessment conducted by Total Safety Training and Consultants, LLC is intended solely as a support document to supplement existing safety procedures and standards already implemented by the company, including but not limited to OSHA, NEC, and NFPA 70 standards. Total Safety Training and Consultants, LLC assumes no liability for any injuries, damages, losses, or other consequences arising directly or indirectly from the use or misuse of this assessment.

Supporting documentation & Sign Off

  • A workplace safety inspection was recently conducted at your jobsite. The following documentation is a written report of all safety concerns & violations observed during the inspection. Please address and abate all noted deficiencies as soon as possible. Serious violations should be addressed and corrected immediately.

    A follow up safety inspection will be conducted by a member of our staff or an officer of your organization within 24 hours of this report to ensure that all corrective actions and measures have been taken.

    If you have any questions regarding this inspection report or request assistance in taking the corrective actions suggested in this report please feel free to contact us directly.

    Juanita Perez
    Total Safety Training & Consultants LLC
    (954) 651-3280

  • Project: PBIA Client: Davco Electrical Services

  • Davco Authorized Competent Person

  • Location:

  • Date & Time:

Pre-Task Safety Procedures

  • Have all Davco Electric employees participated in the daily Tailboard Meeting?

  • Are all scheduled work activities listed on the Pre-Task Plan Huddle Board?

  • Is the approved Job Hazard Analysis (JHA) onsite and signed by all workers?

  • Have all workers signed the daily pre-task sign in sheet?

Personal Protective Equipment (PPE)

  • Are all workers wearing the required PPE? <br><br> Safety glasses, face shields, hard hats, safety shoes, insulating (rubber) gloves with leather protectors, insulating sleeves, and flame-resistant (FR) clothing.

  • Add media

LOCKOUT / TAGOUT Procedures

  • Have all workers received LOTO training ? 1910.147(c)(7)(i)

  • Has the Switchgear or Equipment been LOCKED OUT by the Authorized Competent Person?

  • Add media

  • Has Davco Electric’s authorized Competent Person followed the step-by-step process for LOTO? 1910.147(d) 1. Application of control 2. Preparation for shutdown 3. Machine shutdown 4. Machine isolation 5. LOTO application 6. Release of stored energy 7. Verification of isolation 8. Completion of maintenance 9. Release from LOTO 10. LOTO device removal

  • Photos of LOCKED OUT Equipment

START-UP Procedures

  • Have all equipment, tools and material been removed from the work area?

  • Has the Competent Person conducted a Pre-Start-up inspection?

  • Was the Start-up successful?

  • Add media

Sign Off

  • Final summary of inspection:

  • Are the overall conditions of this jobsite is satisfactory?

  • All deficiencies noted during this inspection must be corrected immediately to bring this jobsite into compliance with OSHA Standards. All violations noted in this report have been discussed with the jobsite superintendent.

    Juanita Perez
    Total Safety Training & Consultants LLC
    (954) 651-3280

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.