Title Page
-
Conducted on
-
Add signature
-
Engineers name
-
Location
Milk intake
-
Speak to operator regarding any issues
-
General inspection (Leaks, noises, alarms, hazards, tracked valves)
Vats condensate (Report issues)
-
Vat 1
-
Vat 2
-
Vat 3
-
Vat 4
-
Vat 5
-
Vat 6
-
Vat 7
-
Vat 8
-
Vat 9
-
Vat 10
Vat shaft seals (report signs of leaks)
-
Vat 1
-
Vat 2
-
Vat 3
-
Vat 4
-
Vat 5
-
Vat 6
-
Vat 7
-
Vat 8
-
Vat 9
-
Vat 10
Blockformers
-
Are all 5 Vacuum pumps running?
-
Is the bag spread mech rubbing?
-
Check all conveyor belts for damage
-
Check air oil lubricator level on leak detector
Separtators
-
Check Vat condensate hopper for contamination
Blockmaster
-
Speak to operator - any concerns
-
General inspection - Leaks, noises, alarms, hazards or concerns
Palletiser
-
Speak to operator - any concerns
-
General inspection - Leaks, noises, alarms, hazards or concerns
Rapid Chill Store temp - compressors
-
Suction pressure (bar)
-
Discharge pressure (bar)
-
Air off temperature (c)
-
Oil level compressor 1
-
Oil level compressor 2
-
Oil level compressor 3
-
Oil level compressor 4
Main cold store plant room
-
Cold store compressor 1 status
-
Cold store compressor 2 status
-
Oil level compressor 1 (halfway)
-
Oil level compressor 2 (halfway)
Niro
-
Speak to operator - any concerns
-
General inspection - Leaks, noises, alarms, hazards, tracked valves or concerns
C.I.P 200
-
Speak to operator - any concerns
-
General inspection - Leaks, noises, alarms, hazards, tracked valves or concerns
C.I.P 300
-
Speak to operator - any concerns
-
General inspection - Leaks, noises, alarms, hazards, tracked valves or concerns
Boiler House
-
Byworth 1 status
- Online - Lead
- Online - Lag
- Offline - Up to pressure
- Offline - Down for service/repair
-
Byworth 1 steam pressure (bar)
-
Byworth 2 status
- Online - Lead
- Online - Lag
- Offline - Up to pressure
- Offline - Down for service/repair
-
Byworth 2 steam pressure (bar)
-
800 Boiler status
- Online - Lead
- Online - Lag
- Offline - Up to pressure
- Offline - Down for service/repair
-
800 Boiler pressure (bar)
Air compressor
-
General inspection
-
GA75VSD+ Status
-
GA75VSD+ Enclosure filters
-
GA75VSD+ Oil level
-
GA75VSD+ Condensate auto drain
-
GA75VSD+ Delivery air pressure (bar)
-
GA75VSD+ Air temperature (c)
-
GA90VSD Status
-
GA90VSD Enclosure filters
-
GA90VSD Oil level
-
GA90VSD Condensate auto drain
-
GA90VSD Delivery air pressure (bar)
-
GA90VSD Air temperature (c)
CHP
-
Check CHP is running OK
-
Alarms present - If yes, state in notes and contact Clarke
BiCarb Dosing
-
Inspect dosing tank – if empty activate “start transfer pump” button on panel
-
Open solenoid near water fill point on mixing tank
-
Open orange hand valve on water feed line into mixing tank
-
Once dosing tank has filled with water(1000l)activate “Start mixer” on panel
-
Gradually mix 1 x 25kg bag of bicarb into circulating water
-
Ensure bag is poured into green bucket in stages and using hands break up large lumps of bicarb or pump outlet will block immediately