Information
-
Audit Title
-
Document No.
-
Conducted on
-
Prepared by
-
Weather
-
Rainfall since last inspection (mm)
-
Visibility
-
Dam level (m AHD) (FSL=283 m AHD)
Reservoir banks
-
Slips/Erosion
-
Cracking
-
Comments or additional information
-
Add photos of any changes from previous inspections
Upstream batter
-
Slips/Erosion
-
Cracking
-
Settlement
-
Seepage
-
Comments or additional information
-
Add photos of any changes from previous inspections
Crest
-
Slips/Erosion
-
Cracking
-
Settlement
-
Seepage
-
Comments or additional information
Crest piezometers (left to right)
-
P1a
-
P1
-
P2a
-
P2
-
CLa
-
CL
-
P3a
-
P3
-
CRa
-
CR
-
P4a
-
P5a
-
Add photos of any changes from previous inspections
Downstream batter
-
Slips/Erosion
-
Cracking
-
Settlement
-
Seepage
-
Comments or additional information
-
Add photos of any changes from previous inspections
Downstream toe
-
Slips/Erosion
-
Cracking
-
Settlement
-
Seepage
-
Changes in colour of seepage
-
Comments or additional information
-
Add photos of any changes from previous inspections
Spillway approach (Primary and Secondary)
-
Slips/Erosion
-
Cracking
-
Settlement
-
Seepage
-
Comments or additional information
-
Add photos of any changes from previous inspections
Spillway culverts
-
Slips/Erosion
-
Cracking
-
Settlement
-
Seepage
-
Concrete panel misalignment
-
Condition of seals between concrete panels
-
Comments or additional information
-
Add photos of any changes from previous inspections
Spillway (primary) excavation batters
-
Slips/Erosion
-
Cracking
-
Settlement
-
Seepage
-
Comments or additional information
-
Add photos of any changes from previous inspections
Spillway chute
-
Slips/Erosion
-
Cracking
-
Settlement
-
Seepage
-
Concrete panel misalignment
-
Condition of seals between concrete panels
-
Comments or additional information
-
Add photos of any changes from previous inspections
Spillway stilling basin
-
Slips/Erosion
-
Cracking
-
Settlement
-
Seepage
-
Condition of seals between concrete panels
-
Comments or additional information
-
Add photos of any changes from previous inspections
Spillway (secondary) excavation batters
-
Slips/Erosion
-
Cracking
-
Settlement
-
Seepage
-
Condition of seals between concrete panels
-
Comments or additional information
-
Add photos of any changes from previous inspections
Outlet works
-
Valve condition (irrigation isolation)
- Not checked
- Closed with minor leak
- Closed no leaks
- Operates well, no leaks
- Operates with reduced function and/or leaks
- Non operational
-
Valve condition (irrigation flow control)
- Not checked
- Closed with minor leak
- Closed no leaks
- Operates well, no leaks
- Operates with reduced function and/or leaks
- Non operational
-
Valve condition (dump)
- Not checked
- Closed with minor leak
- Closed no leaks
- Operates well, no leaks
- Operates with reduced function and/or leaks
- Non operational
-
Damage to concrete
-
Leaks from flanges and fittings
-
Condition of fittings
-
Outlet flow rate (ML/day)
-
Comments or additional information
-
Add photos of any changes from previous inspections
V-Notches
-
Outlet (mm)
-
Spilling basin (mm)
-
Toe centre (mm)
-
Toe right (mm)
-
Is there any changes in colour in the flows?
-
Comments or additional information
-
Add photos of any changes from previous inspections
-
Is there any sign of unauthorized entry or damage to the site?
Summary and Sign-off
-
Is a phone call to the dam safety engineer required due to any changes or issues observed?
-
Dam safety engineer:
David Wightman
P 0418 352 884
E david.wightman@tasmanianirrigation.com.au -
Sign on completion of inspection
-
Sign on review