Report Information

  • Document No.

  • Week Commencing

  • Auditor

  • Other Auditor/s

  • Person
  • Name

  • Company

  • Signed off by:

Dam Visual Inspections

  • Dam Visual Inspection

  • Daily inspection
  • Select date

  • Weather Conditions

  • Rainfall Period (days)

  • Rainfall recorded (mm)

Dam Info

  • General Comments / Other observations and explainations

Reservoir

  • Reservoir Level (FSL 299.75m)

  • Reservoir Volume (est)

  • General observations

Dam Wall

  • Upstream Face

  • Debris at Upstream Face

  • Crest

  • Dam Survey Points

  • Downstream Face

  • Downstream of dam Left and Right banks

  • Standpipe reading

  • Left abutment - Long standpipe 1 - Water depth (m)

  • Right abutment - Long standpipe 2 - Water depth (m)

  • Comments

Spillway

  • There are no obstructions or blockages affecting the spillway chute?

  • There are no blockages/obstructions in the culvert?

Inlet / Outlet works

  • Inlet floats are in correct alignment

  • Outlet valve

  • Eflow recorded volume (ML)

  • V-Notch height (mm) at Downstream toe

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.