Report Information
-
Document No.
-
Week Commencing
-
Auditor
- Ian Smith
- Chas Holmas
- Charlie Hardman
- David Mohr
- Owen Hoffmann
- Other Auditor/s
-
Other Auditor/s
Person
-
Name
-
Company
-
Signed off by:
Dam Visual Inspections
-
Dam Visual Inspection
Daily inspection
-
Select date
-
Weather Conditions
-
Rainfall Period (days)
-
Rainfall recorded (mm)
Dam Info
-
General Comments / Other observations and explainations
Reservoir
-
Reservoir Level (FSL 299.75m)
-
Reservoir Volume (est)
-
General observations
Dam Wall
-
Upstream Face
- OK
- Wave Damage
- Slips
- Slides
- Other Issues
-
Debris at Upstream Face
-
Crest
- Ok
- Obstruction
- Cracking
- Movement
- Erosion
- Other Issue/s
-
Dam Survey Points
- OK
- Damage or Vandalism
-
Downstream Face
- OK
- Movement
- Cracking
- Erosion
- Seepage
- Other Issues
-
Downstream of dam Left and Right banks
- OK
- Leakage
- Erosion
- Slides
- Other Issues
-
Standpipe reading
-
Left abutment - Long standpipe 1 - Water depth (m)
-
Right abutment - Long standpipe 2 - Water depth (m)
-
Comments
Spillway
-
There are no obstructions or blockages affecting the spillway chute?
-
There are no blockages/obstructions in the culvert?
Inlet / Outlet works
-
Inlet floats are in correct alignment
-
Outlet valve
-
Eflow recorded volume (ML)
-
V-Notch height (mm) at Downstream toe
-
Comments