Information
-
Document No.
-
DBIS site diary, daily records
-
Contract number
-
Conducted on
-
Conducted by
General
General observations
-
General weather conditions
- high cloud,
- overcast,
- scattered cloud,
- light rain,
- moderate rain,
- heavy rain,
- showers,
- fine,
- light winds,
- moderate winds,
- strong winds,
-
Approximate Temperature
Safety, environment and quality
-
OHS daily check completed? Checklist and general observations do not identify breach or hazard?
-
Nature of non compliance
-
Incident report required?
-
Incident notified to TI safety manager?
-
Incident report to be completed by
-
Incident report to be completed by:
-
Comments:
-
Compliance with CEMP, EPG's
-
Details of non compliance issues
-
Incident report required?
-
To be completed by
-
To be reported by
-
Quality standards being adhered
-
Provide further information
-
ITP compliance
ITP checked
-
Hold point released
-
Detail hold points
-
Released by
-
Select date
-
Contract under review
-
Person conducting review
-
ITP reviewed
-
Compliant or non compliant
-
General notes and observations
Landholders
-
Landholder interactions
Landholder :
-
Landholder name
-
Alignment
- Blythe Pump Station
- SR Pump Station
- SRD
- South Riana 1
- South Riana A
- Cuprona 1
- Cuprona 2
- Cuprona A
- Cuprona B
- Cuprona C
- Cuprona D
- SC 1
- SC 2
- SC A
- SC B
- SC C
- Dial 1
-
Issues discussed
-
Enter any diagrams to assist
Contractual issues
-
Contractural issues of note
Issue
-
Is the issue variation, extension of time or other?
-
Explanation
-
Date to be actioned by
-
Have instructions been given or are instructions required?
-
Detail instructions provided and reference to written correspondence provided or required.
-
Instruction given to
-
Select date
-
Is the issue a non conformance?
-
Incident details - provide short description through reference to written correspondence required
-
Add drawing
-
Incident report required?
-
Incident to be reported by
-
Select date
-
Incident reference number
Design / Request For Instruction? (RFI)
-
Evidence of potential or actual RFI
-
Technical, commercial, other
-
Provide description
General photos of works
-
Add media
Work fronts
Work front observed
-
Work areas visited
Work site
-
Alignments or locations visited
- Blythe Pump Station
- SR Pump Station
- SRD
- South Riana 1
- South Riana A
- Cuprona 1
- Cuprona 2
- Cuprona A
- Cuprona B
- Cuprona C
- Cuprona D
- SC 1
- SC 2
- SC A
- SC B
- SC C
- Dial 1
-
Chainage
-
Add location
-
Time entered
-
Time left
-
Trades working
- Civil
- pipeline
- electrical
- Aurora
- pump stations
- telemetry
- wildlife
- cultural heritage
- other
- timber harvesting
- pipeline welders
- DICL install crew
-
Notes
-
General observations, extent of works completed, extent of placement, installation of plant and equipment
-
Photos