Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Does the task/area contain any of the following high risk activities?

  • A risk of falling more than 2m?

  • Is carried out near a telecommunication tower?

  • Involves the demolition of a load bearing structure?

  • Involves or is likely to involve the disturbance of asbestos?

  • Involves the use of temporary supports to prevent the collapse of a structure?

  • Is carried out in or near a confined space?

  • Is carried out in or near a shaft or trench of greater than 1.5m in depth?

  • Is carried out in or near a tunnel?

  • Involves the use if explosives?

  • Is carried out on or near pressurised gas distribution mains or piping?

  • Is carried out on or near chemical, fuel or refrigerant lines?

  • Is carried out on or near energised electrical installations or services?

  • Is carried out in an area that may have a contaminated flammable atmosphere?

  • Involves the use of tilt up or precast concrete?

  • Is carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor that is in use by traffic other than pedestrians?

  • Is carried out in an area where the is any movement of powered plant?

  • Is carried out in an area where there is artificial extremes of temperature?

  • Is carried out in or near water or other liquid that may involve a risk of drowning?

  • Involves diving work?

  • If the answer to any of the questions above is YES then a Safe Work Method Statement must be produced and used during the conduct of the work

  • ACTIVITY DESCRIPTION:

HAZARDS

  • 1.1. Height

  • 1.2. Equipment

  • 1.3. Power Lines

  • 1.4. Electricity

  • 1.5. Sharp Objects

  • 1.6. Slippery / Wet Surfaces

  • 1.7. Gasses

  • 1.8. Dust

  • 1.9. Underground Utilities

  • 1.10. Overhead Obstructions

  • 1.11. Hazardous Substances

  • 1.12. Working In Isolation

  • 1.13. Ignition Sources

  • 1.14. Manual Handling

  • 1.15. High Pressure

  • 1.16. Lifting Equipment

  • 1.17. Rotating Machinery

  • 1.18. Entry & Exit

  • 1.19. Ground Openings

  • 1.20. Entanglement

  • 1.21. Animals, Pests

  • 1.22. High Voltage

  • 1.23. Confined Space

  • 1.24. Sun Rays / Adverse Weather Conditions

  • 1.25. Pollution

  • 1.26. Grinding

  • 1.27. Public Areas

  • 1.28. Other Hazards

CONTROL MEASURES

  • 2.1. Isolations

  • 2.2. Spotters

  • 2.3. Lighting

  • 2.4. Respiratory Protection

  • 2.5. Application of PPE

  • 2.6. Signage

  • 2.7. Barricades

  • 2.8. Fall Arrest

  • 2.8. Extinguishers

  • 2.9. Screens

  • 2.10. Fire Blankets

  • 2.11. Procedures

  • 2.12. Competent People

  • 2.13. Locating Equipment

  • 2.14. UV Protection

  • 2.15. Gas Detection

  • 2.16. Designated Work Areas

  • 2.17. Supervision of Public

  • 2.18. Other Control Measures

DESCRIPTION OF WORKS & CONTROLS

  • 3.1. Job Steps

  • 3.2. Risk Description

  • 3.3. Controls Description

SIGN OFF

  • Team Member

  • Team Member

  • Team Member

  • Team Member

  • Authorized Person: I have reviewed this JSA and agree that it is a fair assessment of the job and I authorize this work to proceed.

  • Team Leader

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.