Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
D&C sales person
Complying Development Certificate
-
Have a Construction Development certificate been issued to the client before any construction took place?
-
Did the client receive their Occupation Certificate at the end of the project?
-
Notes:
Building Works
-
All building works such as walls have been built to dimension showing on the plan?
-
Have all skirting and flat bar been fitted on to the standards?
-
Have all ceiling tiles been put back on to the ceiling?
-
Have all doors been fitted on according to the building works plan?
-
Have all door handles and door closers been tested?
-
Notes:
-
Add media
Painting
-
Are all colors been applied according to the finishes schedule?
-
Have all walls and doors been checked for any touch up?
-
Notes:
-
Add media
Frosting
-
Have all frosting been applied according to the approved design from the client?
-
Have all new frosting been checked for any defects?
-
Notes:
-
Add media
Electrical
-
All power and data point been tested and labeled?
-
Does the amount of power and data point add up according to the signed quote
-
Have the comms rack been tested and labelled?
-
Notes:
-
Add media
Air-conditioning
-
Have all air-conditioning works been completed and Air balanced?
-
All works have been checked for free of defects?
-
Notes:
-
Add media
Fire Services
-
Have all fire services been modified to suit the new layout and a certificate been issued from fire services contractor?
-
Notes:
-
Add media
Hydraulics
-
Have all hydraulics works been tested and free of defect?
-
Have all the hydraulic works been fitted to the Australian Standards?
-
Notes:
-
Add media
Kitchen and Custom Joinery
-
Have all joinery been checked for quantity?
-
Notes:
-
Add media
Flooring ( Vynal , Carpet, Tiles )
-
Is the flooring been installed as per the finishes schedule?
-
Notes:
-
Add media
Signature
-
Clients Name :
-
Project Managers Name: