Information

  • Client / Site

  • Location
  • Select date

  • Report

SUPPLY CHARACTERISTICS - LOGGED

    SUPPLY
  • Number of Supplies Entering the Site

  • undefined

  • Supply Name

  • Transformer Size - KVA

  • Photo of Transformer & Rating Plate

  • Main Incoming Switch Size - AMPS

  • Main Incoming Switch Type

  • Main Incoming Settings

  • Bus coupler

  • open or closed

  • size

  • how often is it used

  • Renewables

  • Three Phase or Single

  • Details of Test Equipment used

  • Test Equipment Used

  • Details of Other Test Equipment

  • Serial Number / ID

  • CT Multiplier L1 L2 L3

  • CT Multiplier Neutral (if applicable)

  • Is On Site Power Metering Available

  • Main Incomer Load in Amps / KW / KVA / PF / KVAR / THD-V / THD-A

  • Max Demand Readings from Utility Metering KW & KVA (poss PF / KVAR / THD-V / THD-A)

  • MPAN

  • CT RATIO

  • Voltage Readings - Closest Point - Mid Point & Furthest Point

  • Closest Point

  • Mid point

  • Furthest Point

  • Expansion Planned

  • Detail Expansion Plans ie additional loadings

  • Detail different types of load - total should add up to 100%

  • Load Profile for VMS Only

  • % Lighting with Magnetic Ballast (Old Style Lighting with T10/T8 Tube etc) 20%

  • % Lighting with Electronic Control (T5/LED/Electronic Ballast/High Frequency) 3%

  • % Refrigeration/Chillers/Freezers/Air Conditioning (Without Inverter) 14%

  • % Refrigeration/Chillers/Freezers/Air Conditioning (With Inverter) 2%

  • % Heating Ventilation and Air Conditioning (HVAC) 7%

  • % Heater/Kitchen Equipment/Resistive Loads (Without Thermocouple) 16%

  • % Computer/Electronic/General IT Equipment 3%

  • % Motors/Machinery/Pumps etc 5%

  • % Inverter Drives 2%

  • % Other Non Saving Load 0%

  • Spare Switches / Ways - Detail

  • Details of Spare Switches

  • VO Install

  • Space for VO and MCCB

  • Covers Removed

  • Take Photos of Internals

  • Explain how you would install and shutdown

  • Cable Lengths

  • MAIN TO EA MCCB

  • MCCB TO VO

  • VO TO DB

  • NEUTRAL

  • EARTH

  • MOBILE SIGNAL

  • Cable Length for extended aerial

  • PFC Install

  • Supply Cable Length

  • CT Cable Length

  • Spare way

  • Size amps

  • Explain how you would install and shutdown

  • Containment Required

  • Type

  • Quantity

  • Access Issues

  • Stairs or Steps

  • Door sizes

  • Equipment available on site to move units

  • Forklift

  • WEIGHT LIMIT

  • Pallet Truck

  • WEIGHT LIMIT

  • Lift And Shift Required

  • OPENING TIMES

  • SHUTDOWN TIMES

  • ENGINEERS REQUIRED

  • HOW MANY DAYS

  • DNO REQUIRED

  • Conduct Engineers Report

  • Engineers Report

  • Engineers Notes

  • Description of site - what do they do

  • Additional Notes and Observations

  • Make multiple Sketches to Aid Installation or Complete of Separate Sheet

  • Add drawing

  • Add drawing

  • Add drawing

  • Add drawing

Completion

  • Further Action Required

  • Details of Further Action

  • Information Brochure Left With Client

  • Other Sites Responsible For

  • Other Sites

  • Engineer - Name & Signature

  • Works carried out to clients satisfaction - Client

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.