Information

  • Job Number

  • Customer Name

  • Description

  • Are Spreader Bars & Bolts Fitted

  • Are Bridging Bars & Bolts Fitted

  • Are Bridging Bars & Bolts Fitted

  • Are Spreader Bars & Bolts Fitted

  • Is GRP Insulation Fitted to Back Plate

  • Size

  • Boxed or Loose

  • Door Interlocked & Operational

  • Door Lock Fitted

  • 3 Phase or 1 Phase

  • Select date

  • Built By Operation 1

  • Built By Operation 2

  • Built By Operation 3

  • Built By Operation 4

Equipment No 1

  • Visual Appearance

  • Rating Plate Attached

  • Warning Labels - All Removable Panels & Door

  • Correct Flash fitted - EnergyAce or Other

  • Is Branding Correct Throughout - Refer to Jobcard

  • Phase Markers Present

  • Shrouds Present

  • Barrier or Individual Shroud

  • Swarf & Debris

  • Switch Mounting

  • Clearance Between All Live Parts & Earth

  • Clearance Between All Phases

  • MCCB Setting (Amps or %) If Non MCCB State NON MCCB

  • Main Earth & Bonding in Place

  • Connection Tightness

  • Check For Swarf Again

  • Paperwork Present

  • Visually OK & Polished

  • Built By & Tested By Signed by Both

  • Comments

  • Photos taken inside and out

  • Take Photos

Completion

  • Passed Inspection Test Engineer

  • Test Engineer - Name & Signature

  • Second Level Inspection Passed

  • Second Level Inspector - Name & Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.