Information
-
Job Number
-
Customer Name
-
Description
-
Are Spreader Bars & Bolts Fitted
-
Are Bridging Bars & Bolts Fitted
-
Are Bridging Bars & Bolts Fitted
-
Are Spreader Bars & Bolts Fitted
-
Is GRP Insulation Fitted to Back Plate
-
Size
-
Boxed or Loose
-
Door Interlocked & Operational
-
Door Lock Fitted
-
3 Phase or 1 Phase
-
Select date
-
Built By Operation 1
-
Built By Operation 2
-
Built By Operation 3
-
Built By Operation 4
Equipment No 1
-
Visual Appearance
-
Rating Plate Attached
-
Warning Labels - All Removable Panels & Door
-
Correct Flash fitted - EnergyAce or Other
-
Is Branding Correct Throughout - Refer to Jobcard
-
Phase Markers Present
-
Shrouds Present
-
Barrier or Individual Shroud
-
Swarf & Debris
-
Switch Mounting
-
Clearance Between All Live Parts & Earth
-
Clearance Between All Phases
-
MCCB Setting (Amps or %) If Non MCCB State NON MCCB
-
Main Earth & Bonding in Place
-
Connection Tightness
-
Check For Swarf Again
-
Paperwork Present
-
Visually OK & Polished
-
Built By & Tested By Signed by Both
-
Comments
-
Photos taken inside and out
-
Take Photos
Completion
-
Passed Inspection Test Engineer
-
Test Engineer - Name & Signature
-
Second Level Inspection Passed
-
Second Level Inspector - Name & Signature