Information
-
Client / Site
-
Location
-
Select date
-
Report
SUPPLY CHARACTERISTICS - LOGGED
- SUPPLY
-
Number of Supplies Entering the Site
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- Other - See Below
-
undefined
-
Supply Name
-
Transformer Size - KVA
-
Photo of Transformer & Rating Plate
-
Main Incoming Switch Size - AMPS
-
Main Incoming Switch Type
- MCCB
- ACB
- Isolator
- Direct
- Changeover
- Bypass
-
Main Incoming Settings
-
Bus coupler
-
open or closed
-
size
-
how often is it used
-
Renewables
-
Three Phase or Single
-
Details of Test Equipment used
-
Test Equipment Used
-
Details of Other Test Equipment
-
Serial Number / ID
-
CT Multiplier L1 L2 L3
-
CT Multiplier Neutral (if applicable)
-
Is On Site Power Metering Available
-
Main Incomer Load in Amps / KW / KVA / PF / KVAR / THD-V / THD-A
-
Max Demand Readings from Utility Metering KW & KVA (poss PF / KVAR / THD-V / THD-A)
-
MPAN
-
CT RATIO
-
Voltage Readings - Closest Point - Mid Point & Furthest Point
-
Closest Point
-
Mid point
-
Furthest Point
-
Expansion Planned
-
Detail Expansion Plans ie additional loadings
-
Detail different types of load - total should add up to 100%
-
Load Profile for VMS Only
-
% Lighting with Magnetic Ballast (Old Style Lighting with T10/T8 Tube etc) 20%
-
% Lighting with Electronic Control (T5/LED/Electronic Ballast/High Frequency) 3%
-
% Refrigeration/Chillers/Freezers/Air Conditioning (Without Inverter) 14%
-
% Refrigeration/Chillers/Freezers/Air Conditioning (With Inverter) 2%
-
% Heating Ventilation and Air Conditioning (HVAC) 7%
-
% Heater/Kitchen Equipment/Resistive Loads (Without Thermocouple) 16%
-
% Computer/Electronic/General IT Equipment 3%
-
% Motors/Machinery/Pumps etc 5%
-
% Inverter Drives 2%
-
% Other Non Saving Load 0%
-
Spare Switches / Ways - Detail
-
Details of Spare Switches
-
VO Install
-
Space for VO and MCCB
-
Covers Removed
-
Take Photos of Internals
-
Explain how you would install and shutdown
-
Cable Lengths
-
MAIN TO EA MCCB
-
MCCB TO VO
-
VO TO DB
-
NEUTRAL
-
EARTH
-
MOBILE SIGNAL
-
Cable Length for extended aerial
-
PFC Install
-
Supply Cable Length
-
CT Cable Length
-
Spare way
-
Size amps
-
Explain how you would install and shutdown
-
Containment Required
-
Type
-
Quantity
-
Access Issues
-
Stairs or Steps
-
Door sizes
-
Equipment available on site to move units
-
Forklift
-
WEIGHT LIMIT
-
Pallet Truck
-
WEIGHT LIMIT
-
Lift And Shift Required
-
OPENING TIMES
-
SHUTDOWN TIMES
-
ENGINEERS REQUIRED
-
HOW MANY DAYS
-
DNO REQUIRED
-
Conduct Engineers Report
-
Engineers Report
-
Engineers Notes
-
Description of site - what do they do
-
Additional Notes and Observations
-
Make multiple Sketches to Aid Installation or Complete of Separate Sheet
-
Add drawing
-
Add drawing
-
Add drawing
-
Add drawing
Completion
-
Further Action Required
-
Details of Further Action
-
Information Brochure Left With Client
-
Other Sites Responsible For
-
Other Sites
-
Engineer - Name & Signature
-
Works carried out to clients satisfaction - Client