Complying Development Certificate

  • Has a Construction Development certificate been issued to the client before any construction took place?

  • Did the client receive their Occupation Certificate at the end of the project?

  • Notes:

Building Works

  • All building works such as walls have been built to dimension showing on the plan?

  • Has all skirting and flat bar been fitted on to the standards?

  • Has all ceiling tiles been put back on to the ceiling and no damaged tiles?

  • Has all doors been fitted on according to the building works plan?

  • Has all door handles and door closers been tested?

  • Notes:

  • Add media

Painting

  • Are all colors been applied according to the finishes schedule?

  • Has all walls and doors been checked for any touch up?

  • Notes: check no paint on skirting and trims

  • Add media

Frosting

  • Has all frosting been applied according to the approved design from the client?

  • Has all new frosting been checked for any defects?

  • Notes:

  • Add media

Electrical

  • All power and data point been tested / labelled? (test results must be issued)

  • Does the amount of power and data point add up according to the signed quote

  • Has the comms rack been tested and labelled?

  • Notes: check all lights working and clean

  • Add media

Air-conditioning

  • Has all air-conditioning works been completed and Air balanced?

  • All works have been checked for free of defects and remote control/manual handed over?

  • Notes:

  • Add media

Fire Services

  • Has all fire services been modified to suit the new layout and a certificate been issued from fire services contractor?

  • Notes:

  • Add media

Hydraulics

  • Has all hydraulics works been tested and free of defect?

  • Has all the hydraulic works been fitted to the Australian Standards?

  • Notes: 1. Check if hot water switched on 2. Dishwasher tested and protective filmed removed

  • Add media

Kitchen and Custom Joinery

  • Has all joinery been checked for quality?

  • Has all the door handles been fitted?

  • Has all the doors been adjusted?

  • Is there a correct size cutlery draw been installed?

  • Notes:

  • Add media

Flooring ( Vinyl , Carpet,Timber,Tiles )

  • Is the flooring been installed as per the finishes schedule?

  • Has all trims been installed correctly?

  • Notes:

  • Add media

Signature

  • Clients Name :

  • Project Managers Name:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.